Post Job Free
Sign in

Manager Manufacturing

Location:
El Paso, TX, 79912
Posted:
June 21, 2010

Contact this candidate

Resume:

EXECUTIVE SUMMARY

Dedicated leader with comprehensive experience in manufacturing management.

Extensive record of improving efficiency, productivity and profitability

through use of exceptional knowledge & implementation of Lean Manufacturing

Operational Systems. Creative and effective strategic planner and problem

solver. Proven ability to train, evaluate and lead successful team members

to achieve organizational objectives.

CORE COMPETENCIES

Lean Manufacturing Practices

Strategic Planning

Operations Management

Quality, Cost & Volume Control

Process Improvement

Training & Development

Materials & Inventory Management

Work Content Simplification

Key Metrics Definition & Application

PROFESSIONAL EXPERIENCE

Aqua Bio-Clean, Cd. Ju rez, Chihuahua M xico Nov-09 to Present

General Manager

. Direct and manage all operations of business. Develop policies and

vision. Negotiate distributor contract.

. Diagnose Water Treatment Plants operation. Train personnel to improve

processes and waste water quality.

. Assess needs and provide appropriate products for customers with

specific waste water problems.

Delphi Packard Electric, Cd. Ju rez, Chihuahua M xico May-84 -

Sept-09: 25 years

Lean Manufacturing Regional Operations Superintendent - 12 Plants in

M xico - 8 years

. Created flexible software program that generated optimal production

orders that attained exceptional production: "Right Part, Right Time and

Right Quantity" and "Bill to Order" in a highly complicated process.

. Achieved 100% elimination of excess materials in-process and finished

goods inventories. 100% elimination of shortages of raw material at the

points of use. 100% elimination of excess and obsolete in-process and

finished goods inventories, and obtained 35% improvement in production

with the Lean Manufacturing Operational System (LMOS). Resulting $

885,000 dollars in savings. (Example of only one of the many plant's

achievements and benefits attained: RBE V in Cd. Ju rez, M xico).

. Partnered with Lean Team: planned, developed and led over 20 'Hands-On

Integrated LMOS Improvement' workshops annually. Closely collaborated

with two Toyota Sensei to execute in 12 plants the Operational System

(OS) (Toyota Manufacturing System). Included start ups, new and existing

business.

. Developed and implemented efficient and cost-effective simplified

production methods. Launched Lean Manufacturing System in: material

supermarket, lead preparation, cable cutting, engineering, final

assembly, manufacturing and Orders Production System, as well as raw

material and finished goods delivery routes system. Ensured that all

parts, sub-assemblies and finished goods were produced on schedule- 100%

sequential order and met customer's requirements.

Regional Superintendent and Coordinator in the Improvement,

Standardization and Implementation of Key Measurement Parameters and

Operational Systems - 12 Plants in M xico - 6 years

. Analyzed, selected and defined key metrics and their benchmarks in

conjunction with A. T. Karney.

. Coordinated, standardized and implemented key metrics for 24 plants by

which a more objective evaluation of achievements, continuous

improvement and objectives were attained.

. Designed software for the objective evaluation and comparison of

improvement results of each plant in comparison with previous

months/years and other plants.

. Followed up to help each plant ensured that it achieved its budgeted

goals or to redefine their strategies with the help of the new software.

Quality Control Regional Superintendent - 3 plants - 5 years

. Collaborated with plants to receive various recognitions and awards for

'Total Quality Indices' from customers: Toyota in California (NUMMI),

Saturn in TN, and BMW in AL

. Conducted several quality workshops on 'Improvement of the Installation

Process of Electrical Harnesses'.

. Defined strategies and follow up plans that eliminated existing problems

in the assembly process for: Hyundai in Canada, Chrysler in Toluca, and

NUMMI in California.

. Implemented a 'Successive Verification System' that allowed the

elimination of 100% inspection for: RBE I, RBE IX, RBE VII in Cd.

Ju rez, M xico.

Plant Manager for R o Bravo El ctricos IV (RBE IV) - 4 years

. Directed and managed all operations including 1200 employees in a

120,000 square feet plant.

. Improved quality, increased volume and reduced costs: plant wide.

. Directed and lead plant personnel to achieve production objectives.

. Maximized use and control of equipment, manufacturing process,

production, and raw material needed.

. Organized and managed Engineering, Manufacturing and Production Control

for the cable cutting process, lead preparation, final assembly, quality

control, storage and handling of materials using the Toyota Lean

philosophy: Five "S", Kanban, and Work Place Organization.

. Achieved excellent productivity "benchmark" established for electrical

harnesses for the Toyota Assy. plant.

. Demonstrated outstanding interpersonal, motivational and presentation

skills.

Manufacturing Manager-Cutting and Preparation of Cables - RBE IV -1 year

General Supervisor-Cutting and Preparation of Cables- RBE IV -1 year

. Developed a culture in which attention to details and continuous

improvement was an essential part of the employee's mindset. Achieved

the extraordinarily high quality expectations of Toyota.

. Implemented Toyota Lean Principles to manage and upgrade cutting and

lead preparation. Deployed Kanban System for production and inventory

control. Efficiently programmed and supplied all parts for final

assembly

. Enhanced continuous improvement of flow manufacturing process in lead

preparation.

. Devised strategy to control, follow up and successfully execute

production planes.

Renault, Spain y M xico Mar-83 - Apr.-84

General Supervisor - Manufacturing Process

. Operated and maintained production transfer lines for mono-blocks,

pistons, and transmissions for the Renault R-18 plants in Valladolid and

Seville Spain.

. Installed the manufacturing transfer lines in the Gomez Palacio, Durango

start up plant.

Petr leos Mexicanos (PEMEX), M xico Jan-80 - Feb.-83

General Supervisor: Pipe Line Operation

. Operated pipelines and crude oil pump station that supplies Pemex City,

Tabasco and Mexico City.

. Supervised construction of low pressure pipe line network for first

industrial park-Durango, Durango, Mexico.

General Supervisor: Project Control and Estimates

. Supervised and controlled construction of pipeline projects: Natural

Gas and Gasoline lines, Chih. to Juarez.

EDUCATION

Instituto Tecnol gico Regional de Chihuahua, Chihuahua, Chih. M xico

Industrial Mechanical Engineer: Thermal and Design Specialty

TECHNICAL TRAINING

Toyota Lean Manufacturing System Mexico 2000 -

2009

Order Production Systems Jelesnia - Poland 2003

Delphi Lean Manufacturing Operation System Castello Branco - Portugal

2002

Productivity Training- Diploma Cd. Juarez, Chih., M xico

1992 - 1993

Total Quality Training- Diploma ITESM - Ju rez, Chih., M xico

1988

Programmable Robotics, Hydraulic, Electrical Renault Training Center-

Spain 1983

& Pneumatic Training

Crude Oil Pipe Line Pump Station Operations Pemex Training Center-

Monterrey 1981

LANGUAGES

Spanish - Native proficiency and English

COMPUTER SKILLS

Microsoft Office: Word, Excel, Access, PowerPoint and Outlook



Contact this candidate