HOWARD J. BAILEY
Little Rock, AR.72211
501-***-**** Please Phone only
abl4wf@r.postjobfree.com
Objective: A position as a Purchasing Manager /Supervisor, Senior
Buyer/Planner, Buyer.
[pic]
Summary of Qualifications:
Extensive MRP, ISO, JIT, ECO, ERP, FDA, Kanban, Purchasing/Planning, Lean
Manufacturing, Inventory, Shipping/Receiving background in Manufacturing, and
Wholesale/Retail Merchandise.
Commodities: Extensive Electronics, Sheet Metal Fabricated, Tooled,
Machined/Extruded Parts, Cable/Wire, Plastic Injection Molded,
Fabricated/Extruded Parts, Connectors, Power supplies, Transformers, Electric
Motors, Printed matter, Packaging, Labels & MRO,
Proven ability to negotiate prices/contracts, and also creating competitive
bidding
Excellent communication skills
5 years progressive management experience
Proficient with SAP, Oracle 11i, JDA/AS400, Minx, Man Fact, Protious, MS Office
2000, Internet,
Work experience:
Senior Planner/Buyer Contractor with Manpower for Honeywell Aerospace
Electronic Systems
July, 2006 to Sept 2008 Supply Chain
Manager Paul Kristek 425-***-****
15001 NE 36th St. Redmond, WA. 98073 Closed this location
I evaluated daily shortage report and obtained status from suppliers. Checked
through the buy report to see what parts need to be rescheduled or ordered. I
verified with suppliers regarding pricing, quantity, shipping dates, and also
the revision level of parts being ordered, than I supplied any drawings as
needed. I worked with receiving and accounting to settle any supplier
problem/errors. I also worked with inspection and suppliers on any rejected
parts. I submitted items to suppliers for quote and negotiated pricing. I
worked with production to expedite any possible floor shortages, I also worked
with engineering on prototypes to locate and purchase and expedite any parts
needed, Punched, Stamped Fabricated, Machined Metal Parts, Plastic Parts,
Rubber parts, Vinyl Parts, Electrical Parts, Use SAP Outlook, MS Office,
mainframe,
Senior NPI Planner/Buyer Contractor with Adecco for Celestica
Feb, 2006 to July, 2006 SCM
Manager Carl Davis 408-***-****
5325 Hellyer Ave, San Jose, CA. 95138
Work team of set projects, Take BOM Send it out for RFQ, Take Returned RFQ's
and check for pricing and in stock parts also check PPV on all parts if parts
above set price contact the company we are building for approval on the over
spend. work with receiving on any problem parts, work with quality on problem
parts get RMA from supplier on bad parts and do credit memo for AP. Use MS
Office, SAP, Lotus Notes,
R&D Engineering Buyer Contractor with Volt for Spacelabs Medical
June 13, 2005 - Nov, 16, 2005 Director of R&D
Ravi Kuppuraj 425-***-**** x5665
Issaquah, WA. 98027
Lead or support the process of supplier selection and the introduction of new
products in support of R&D programs.
Support the implementation of the best practice Supply Management processes for
Spacelabs.
Developed a supply base capable of meeting all needs of the new product
development teams for engineering models and prototyping. Negotiated Purchase
orders with agreed suppliers. Facilitated the R&D group to effectively utilize
capabilities of Spacelabs Medical preferred vendors. Tracked project
deliverables and report status as required. Scheduled suppliers and held
regular reviews of progress. Ensured the maximum input in most cost effective
designs from the supply base.
Acted as the liaison with the supply management team to ensure smooth new
product introductions.
Purchased labels, custom cables, connectors, custom and off the shelf Passive
components, Switches, RAM, IC's, Cap, sheet metal, custom machined parts,
fabricated parts, and MRO. Utilized ISO, Word, Excel, Lotus Notes, MFG Pro,
Agile,
Senior Buyer Machined/Fabricated, Parts Contractor with ATS Reliance for
Applied Precision Inc
Nov, 2004 - Dec, 2004 Recruiter 425- 488-5839 Purchasing Manager Mark
Taylor 425-***-****
Issaquah, WA.
I evaluated daily shortage report and obtained status from suppliers. Checked
through the MRP to see what parts need to be rescheduled or ordered. I verified
with suppliers regarding pricing, quantity, shipping dates, and also the
revision level of parts being ordered, than I supplied any drawings as needed.
I worked with receiving and accounting to settle any supplier problem/errors. I
also worked with inspection and suppliers on any rejected parts. I submitted
items to suppliers for quote and negotiated pricing. I worked with production
to expedite any possible floor shortages, I also worked with engineering on
prototypes to locate and purchase and expedite any parts needed, Fabricated,
Machined Parts. MS Office, Great Plains,
Purchasing Supervisor/Senior Buyer/Planner Motorola
(Indula) Corp. (Closed)
February 2001 - July, 2004
Materials Manager Terrence Jamba Not Around
San Jose, CA.
Reduced inventories and negotiated with suppliers to close purchase orders. I
ran reports MRP and open order. Developed and implemented short/long-term
procurement planning programs to ensure adequate quantities at lowest costs. I
analyzed and evaluated quotations from suppliers. I solved quality, delivery,
and price issues. I procured samples and parts for engineering department.
Monitored MRP. Purchased cables & wires, connectors, active & passive
components, molded plastic components. Supervised buyers. Utilized ISO,
Outlook, Web, Word, Excel, Minx.
Senior Buyer/Planner Contractor with CDI for Plexus Inc.
(Closed)
April 2000 - February 2001
Purchasing Manager Roger Christenson Not Around
Bothell, Washington
Evaluated daily shortage report and obtained status from suppliers, prior to
production meeting. Checked through the MRP to see what parts need to be
rescheduled or ordered. Submitted to suppliers/brokers quotes for pricing,
quantity, and shipping dates. Also checked the revision level of parts being
ordered, than supplied any drawings as needed. If price quotes exceeded the PPV
contacted the customer for purchase approval. Worked with receiving and
accounting to settle any supplier errors. Purchased Connectors, Switches,
Passive components, RAM, IC's, Cap, and any Broker parts, Utilized ISO,
Outlook, Word, Excel and Protious.
Senior Buyer Contractor with Volt for
Mackie Designs Inc.
September 1999 - April 2000
Purchasing Manager Michael Bury Not Around
Woodinville, Washington
Developed and implemented short and long-term procurement planning programs to
assure adequate quantities at the time and place needed to meet requirements at
the lowest costs. Negotiated prices and created competitive bidding situations
to insure lowest cost, Analyzed and evaluated quotations submitted directly or
in response to bid requests to assure that quality, capability, and costs are
satisfactory. Expedited solution of problems that arise in relation to quality,
delivery, and pricing. Negotiated problem settlements with suppliers that could
result in financial loss to the company. Aggressively pursued and recommend
cost savings possibilities based upon new sources. Maintained market
intelligence and reported changes in pricing levels and potential problem
areas. Accountable for materials requisitions and material requirements
planning, placements of purchase orders and conduct of supplier relations.
Purchased printed matter, labels, packaging, custom cables & wires, connectors,
switches, plugs, active & passive components, PCB's and molded plastic
components, Utilized Word, Excel, Man Fact,)
Planner/Buyer Contractor with Volt for L - 3 Folsom
June 1999 - Sept 1999
Purchasing Manager
Folsom, CA
Evaluated daily shortage report and obtained status from suppliers, prior to
production meeting. Checked through the MRP to see what parts need to be
rescheduled or ordered. Verified with suppliers regarding pricing, quantity,
shipping dates, and also the revision level of parts being ordered. Than
supplied any drawings as needed. Worked with receiving and accounting to settle
any supplier problem/errors. I also worked with inspection and suppliers on any
rejected parts. Submitted items to suppliers for quote and negotiated pricing.
Worked with production to expedite any possible floor shortages, Worked with
engineering on prototypes to locate and purchase any parts needed, Purchased
printed matter, labels, packaging, custom cables, connectors off the shelf
passive components, sheet metal, custom machined parts, fabricated parts, and
MRO. Utilized ISO, Word, Excel,
Senior Buyer/Planner Siemens
Ultrasound Medical Corp.
July 1997 - June 1999
Materials Manager
Issaquah, Washington
Evaluated daily shortage report and obtained status from suppliers, prior to
production meeting. Checked through the MRP to see what parts need to be
rescheduled or ordered. Verified with suppliers regarding pricing, quantity,
shipping dates, and also the revision level of parts being ordered. Than
supplied any drawings as needed. Worked with receiving and accounting to settle
any supplier problem/errors. I also worked with inspection and suppliers on any
rejected parts. Submitted items to suppliers for quote and negotiated pricing.
Worked with production to expedite any possible floor shortages, Worked with
engineering on prototypes to locate and purchase any parts needed, Purchased
printed matter, labels, packaging, custom cables, connectors, custom and off
the shelf passive components, sheet metal, custom machined parts, fabricated
parts, magnetic parts and MRO. Utilized ISO, Word, Excel, Madic, SAP
purchasing, accounting, materials, receiving modules
Buyer/Expediter
Eldec Corp.
March 1995 - July 1997
Purchasing Manager
Lynnwood, Washington
Ran shortage, delinquent and acceleration reports. Contacted suppliers,
confirmed due dates and quantity of items on the reports. Placed notes in the
system on the conversion between the supplier and myself, then adjusted dates
or quantity on the purchase order. If any parts were unavailable for the due
date checked to see if there was an alternate supplier, or if an alternate part
is available that meets specification, quantity. Purchased custom government
and off the shelf passive components, custom machined, fabricated parts and
magnetic parts, Utilized ISO, Word, Excel, Max, Oracle
Warehouse Manager Luxar
Corp.
Dec 1993 - March 1995
Materials Manager
Bothell, Washington
Instructed employees in Receiving, Stores, Packaging, and Shipping procedures
domestic & international in compliance with ISO. Inspected incoming items
against speck sheet or drawings to determine if items meet standards using
various tools. Received all incoming items, sorted, counted and checked against
P.O.D report then entered into system. Counted items received from inspection,
bagged and tagged for FIFO. Checked and issued any items on shortage, pulled
kits for production, Shipped any outgoing orders Fed-x, UPS, and other
carriers, Utilized MAX, Word, Excel and ISO
Buyer/Planner
Coherent Medical Inc
Aug, 1987 - Aug, 1993
Purchasing Manager Marile Tallchife
Mountain view, CA.
Evaluated daily shortage report and obtained status from suppliers, prior to
production meeting. Checked through the MRP to see what parts need to be
rescheduled or ordered. Verified with suppliers regarding pricing, quantity,
shipping dates, and also the revision level of parts being ordered. Than
supplied any drawings as needed. Worked with receiving and accounting to settle
any supplier errors. I also worked with inspection and suppliers on any
rejected parts. Located new suppliers. Submitted items to suppliers for quote
and negotiated pricing. Worked with production to expedite any possible floor
shortages, Worked with engineering on prototypes to locate and purchase any
parts needed, Purchased printed matter, labels, packaging, custom cables, wire,
connectors, power supplies, transformers, fabricated sheet metal parts, custom
machined parts, fabricated and molded plastic parts, and wheels
[pic]
EDUCATION:
Queen Anne High School 1969 Graduated
Seattle, WA
University of California Los Angeles 1978 B A Degree in Business/Marketing
Los Angeles, California
Seattle Community College: Continuing Ed classes in: Accounting Gen Ledger,
A/P, A/R, Business Contracts, Business Law, Basic Electro Mechanical Drafting,
Photography.
[pic]
SALARY REQUIREMENTS: I am open to any fair salary depending upon the job and
location of the job,
RELOCATION: If relocation is not offered, I might be willing to relocate at my
own expense to certain location.
REFERENCES: Provided upon request