Post Job Free
Sign in

Manager Power Plant

Location:
Franklin, WI, 53132
Posted:
April 12, 2010

Contact this candidate

Resume:

**** ****** ****

Ave.

Franklin, Wi.

*****

Cell 219-***-****

E-mail

********@***.***

Fred Dunn

Summary of

qualifications Highly organized, responsible, and results oriented

individual with 36 years of hands on experience in

the power generation industry. My areas of

expertise include both fossil fueled and gas fired

power plants, with particular expertise in Project

Management / Site Manager / Superintendent /

Owner's Representative / Field Engineer,

Construction Management / Contract Administration

and general supervision. Throughout my career I

have been involved in all aspects of power

generation, including new construction and

installation of numerous types of equipment inside

and outside of the power plant. I have also been

involved in the construction of two new power

plants from site preparation to Units ready for

commercial operation. I have been the General

Superintendent in charge of planning, estimating,

scheduling, cost control, negotiating and

supervising SCR Projects, Gas Turbine installations

and numerous Turbine and Boiler overhauls,

retrofits and repairs, unit turnarounds and

emergency outage repairs, as well as day to day

plant maintenance. Some of my supervisory

experience includes working with all levels of

management, managing contractors, craft labor, in

house plant maintenance crews and non-union labor.

The last 2 years I have worked as a Site Manager

for the Day and Zimmerman NPS Company, prior to

that I spent four years in the same position with

the Phillips, Getschow Company, a Mechanical

Contractor in the Illinois area. Some of my job

duties include the supervision and planning, cost

tracking and scheduling of projects involving craft

labor, Boilermakers, Millwrights, Ironworkers,

Pipefitters etc. and extensive travel from jobsite

to jobsite. I have average computer skills in MS

Office, Excel, Word, Outlook and some experience

with primavera. My other major experiences were

with the CommonWealth Edison Company where I spent

twenty five years working as a supervisor and field

engineer in construction and maintenance. Some of

my duties while working in construction included

bid evaluation and clarification up to and

including award of contract as well as field

supervision of contractor. I have attended many

seminars for different types of management

techniques and maintenance repairs. I have a

working knowledge and hands on experience as well

as supervisory experience in all facets of

maintenance and repair including but not limited

to, turbine repairs including major component

repair and replacement, turbine valve disassembly,

reassembly and repair, turbine oil and cooling

water systems, boiler repairs, air heater overhauls

including basket and seal replacements, pin rack

replacement and gear box overhauls, pump overhauls,

turbine driven feed pump overhauls, air

compressors, conveyor systems, coal handling and

crushing equipment including bowl mills, various

sizes, ball mills, coal feeders, belt and chain

drive, hammer mill overhauls and replacements,

waste water treatment facilities, demineralized

water equipment, all areas of plant piping, air,

steam and oil, slag and ash handling equipment and

traveling screens. I also have a thorough knowledge

of welding and machining. I also have experience

in planning all types of work and procurement of

equipment.

Work experience [ 9/2009 - 12/2009, Bechtel ]

Boilermaker Journeyman

Elm Road Power Plant

Perform duties as boilermaker journeyman during

construction of a new 600 MW boiler and associated

equipment.

[ 2007 - 2009, Day & Zimmerman NPS ]

Site Manager

Oak Creek Power Plant

Perform the duties of site manager for a 4 unit

coal fired generating station, including, managing

staff and craft to perform regular maintenance

activities and forced outages as well as

plan,schedule and manage all outages for the

facility, including all capital project's. My day

to day activities also included cost control and

schedule as well as productivity.

[ 2005 - 2006 Shaw, Stone & Webster ]

General Superintendent

Dunkirk Generating Station

Manage multiple Boiler and Bop outages for a period

of 2 years and 4 months, including installing a new

economizer ash system.

[2005 ] Shaw, Stone & Webster

Site Manager

NRG Somerset Generating Station

Site Manager for complete rebuild and re-tube of

Aux. boiler, including casing removal and

replacement and removal and replacement of 624

steam drum to mud drum tubes.

[ 2005] Shaw, Stone & Webster

Site Manager

Oswego Generating Station

Site Manager for complete overhaul and re-tube of a

Westinghouse 800 MW steam condenser, including tube

removal and replacement and major internal repairs,

also repaired boiler water wall curtain and ash

hoppers.

[ 2004 - 2005 ] Power Maintenance Resources Inc.

Project Manager

Lapaloma Generating Station

Project/Site Manager for overhaul and major FSI

work on 4 Alstom GT 24 combined cycle 250 megawatt

units as well as complete scope of BOP maintenance

and repairs, including major turbine component

replacement.

[ 2004 ] Performance Mechanical Inc.

Superintendent

Pastoria Energy Center, Bakersfield California

Lead superintendent for piping contractor building

a 750 Mw combined cycle power plant, 3 GE 7FA's, 3

Nooter Erickson HRSG's a GE A-10 and a GE D11 steam

turbine.

[2004 to 2003 ] Day & Zimmerman NPS Nashville,

Tennessee

General Superintendent

TVA Johnsonville Fossil Plant New Johnsonville

Tennessee

Supervised multiple craft employee's performing

boiler outage work and condenser re-tube and

economizer tube replacement on 100MW CE boiler. The

project was completed on schedule and with in

budget approximately 3M.

TVA Cumberland City Fossil Plant Cumberland City

Tennessee

Managed seven superintendents and five hundred and

eighty multiple craft employee's in the

construction and turnover of a Selective Catalytic

Reduction System for a 1350MW coal fired boiler.

The project was completed on schedule and with in

budget approximately 100M, and will be operational

for this years ozone season.

[ 2003 to 2000 ] Phillips,Getschow

Company Joliet, Illinois

General Superintendent/Superintendent

NRG Indian River Operations Millsboro, Delaware

Lead Superintendent for Boilermakers performing

condenser tube replacement for 125 megawatt unit,

including water box removal and reinstallation,

tube cutting and removal, and tube reinstallation.

Ameren Energy Coffeen Station Coffeen, Illinois

Superintendent for Boilermakers and Pipefitters on

back to back two week boiler outages on two B&W

boilers performing miscellaneous tube replacements

in cyclones, water walls, reheat and superheat

pendants. Repaired GR duct and GT duct cracks,

repaired penthouse roof, miscellaneous wall

hangers, replaced GR duct inlet dampers, replaced

scroll liners and repaired cooling water jacket

leaks, repaired slag tanks and clinker grinders, GR

fan rotor repair and replacement. Prepared outage

reports for both units for station management,

performed cost tracking and estimating.

Phillips, Getschow Joliet Office Joliet Illinois

Performed miscellaneous duties including job site

walk downs, estimating, planning, and scheduling

for future work in 2003.

City of Springfield CWLP Springfield Illinois

Superintendent for Boilermakers for mud drum tube

and cyclone tube and stud repairs on Foster Wheeler

boiler including preparation of cost tracking per

job on a daily basis as well as final cost tracking

and an outage report.

Ameren Energy Elgin Energy Center Elgin Illinois

Project Manager and Lead Superintendent for repair

work on four 125 megawatt Siemens Westinghouse D

501 combustion turbines.

Provided Siemens with cost estimate and schedule

for repairs to combustor support brackets.Planned

and Supervised scheduled outage on four units

utilizing Insulators, Millwrights and Pipefitters

in the removal and disassembly of all insulation,

piping and flex hoses, removal of combustor support

brackets, repair of combustor support bolt holes

and reinstallation of all components. Performed gas

check on all four units and had no leaks, prior to

starting job all combustor support brackets on all

four units were leaking gas. All work was completed

ahead of schedule and under budget.

Ameren Energy Elgin Energy Center Elgin Illinois

Lead Superintendent for installation of four

Siemens Westinghouse 501D Combustion Turbines and

Generators. Job duties included planning and

supervising, all cost tracking, schedule updates,

parts inventory and the work assignments for three

crafts, Boilermakers, Millwrights and Ironworkers.

Boilermaker Scope : Lead Superintendent for 40

Boilermakers during installation and assembly of

air inlet filter house including steel structure

and filter installation, assembly of wet

compression duct work including two expansion

joints, assembly of exhaust duct, silencer section

and stack including all structural steel, expansion

joint and silencers. Assembled and installed

generator filter house for Siemens-Westinghouse air

cooled generator. In charge of all welding

associated with project.

Millwright Scope : Lead Superintendent for 15

Millwrights during installation and assembly of gas

turbine and generator from sole plate installation

to final coupling alignment, including diffuser

installation, bypass ring assembly and all grout

work for all equipment. We also performed coupling

alignment on all plant auxiliary equipment. The

generators were manufactured in Germany, the first

of their type to be installed in the U.S.

Ironworker Scope : Lead Superintendent for 15

Ironworkers during assembly and installation of

turbine sound enclosure, generator enclosure and

exhaust enclosure.

Subcontractor Scope : Lead Superintendent for

Insulation contractor for entire project, also for

heavy haul and initial setting of turbines and

generators including all associated cost control

and paper work. Performed duties of site

coordinator with Electrical Contractor and Civil

Contractor to assure all work was completed without

interference.

Mirant Energy Sugar Creek Power Plant Terre Haute,

Indiana

Planned and executed set up of construction site

for performance of work associated with this

installation, including site set up, mobilization

and demobilization upon completion of project.

Lead Superintendent for installation of two General

Electric 7 FA Combustion Turbines and Generators.

Job duties included planning and supervising, all

cost tracking, schedule updates, parts inventory

and the work assignments for three crafts,

Boilermakers, Millwrights and Ironworkers.

Boilermaker Scope : Lead Superintendent for 35

Boilermakers during installation and assembly of

air inlet filter house including steel structure

and filter installation, assembly of exhaust

duct, silencer section and stack including all

structural steel, expansion joint and silencers. In

charge of all welding associated with project.

Millwright Scope : Lead Superintendent for 15

Millwrights during installation and assembly of gas

turbine and generator from sole plate installation

to final coupling alignment, including diffuser

installation, and all grout work for all equipment.

We also performed coupling alignment on all plant

auxiliary equipment.

Ironworker Scope : Lead Superintendent for 15

Ironworkers during assembly and installation of

turbine sound enclosure.

Subcontractor Scope : Lead Superintendent for

Insulation contractor for entire project, also for

heavy haul and initial setting of turbines and

generators including all associated cost control

and paper work. Performed duties of site

coordinator with Electrical Contractor and Civil

Contractor to assure all work was completed without

interference.

Ameren Energy Coffeen Station Coffeen, Illinois

Lead Superintendent for multi craft job involving

70, Boilermakers, 20 Pipefitters, 6 Millwrights, 6

Ironworkers and 4 Laborers performing boiler outage

work including, cyclone and water wall tube

replacement, tube shield removal and installation,

gas and air duct repairs, FD and ID fan overhauls,

conveyor idler replacement, crusher belt feeder

overhauls. Also supervised multi-craft crew in the

demo and reinstallation of a new 500 ton per hour

Coal Crusher and feeder including modifications to

all structural steel, existing concrete and chute

work from the bunker to the conveyor belt.

Midwest Generation Will County Station Romeoville,

Illinois

Planned and organized supervision of 35

Boilermakers, 10 Pipefitters, 10 Millwrights and 4

laborers in performing air heater basket removal

and inspection, diaphragm and double diaphragm weld

repairs, seal replacement, new basket installation

and changing of the pin rack, and gear box repair.

Performed inspection of Unit Condenser to determine

cause of spring table damage and hydraulic ram

damage, designed lifting and holding device for

condenser while removing spring tables for repairs

and replacing hydraulic rams. Tube samples were

removed from the tube sheet for inspection

purposes, also replaced 2 expansion joints from

inlet tunnel to water box. There were overhauls

performed on C.E. Raymond bowl mills and coal

feeders and exhausters, along with coal and ash

piping replacement and miscellaneous valve change

out and repair on H.P steam systems.

Midwest Generation Joliet Station # 9 Joliet

Illinois

Supervised 50 Boilermakers and 6 Ironworkers in the

installation of a new over fire air system to a 350

megawatt B&W cyclone boiler, including tube removal

and replacement in other area's of the boiler,

penthouse repairs, new catwalk installation and all

new air ducts.

Ameren Energy Coffeen Station Coffeen Illinois

Supervised 16 Pipefitters and 6 Millwrights during

the installation of a new cooling pond piping and

pump installation for the purpose of lake water

temperature reduction. Piping was 36" diameter 20 '

lengths about 1000' for four pumps, all pipe

connections open butt welded.

Ameren Energy Newton Station Newton Illinois

Supervised 70 Boilermakers and 15 Pipefitters

during overhaul on Combustion Engineering

tangential furnace for 800 megawatt unit, repair

work included secondary superheat pendent

replacement, division wall bowtie replacement,

miscellaneous Dutchmen installation throughout

boiler, air heater seal replacement and cold end

modification, removal and replacement of over 5000

tube shields. Installation of isolation valves in

coal piping at all burners where there had been

none installed previously, miscellaneous coal pipe

and elbow replacement. Installation of new

instrument air header and instrument tubing to

miscellaneous valves. Replacement of 4" and 6"

house service water line for unit from carbon steel

to stainless steel.

Indeck Energy Indeck Energy Center Rockford,

Illinois

Supervised Boilermakers and Millwrights during

installation of two Westinghouse 175 MW Gas Turbine

/ Generators including installation of embeds and

anchor bolts generator and turbine grouting all

exhaust work and all air intake work.. Also

participated in set up and layout of heavy haul for

site. Duties included working with inexperienced

receiving clerk cataloging parts inventory and

setting up site lay down area's.

[ 1999 to 1974 ] Commonwealth Edison

Company Chicago, Illinois

Owners Site Rep. / Construction Field Engineer /

Maintenance Supervisor / Scheduler - Planner

Job Duties

Site Manage and Supervise various construction

projects throughout the Common Wealth Edison Fossil

System. Which included start to finish projects

from writing work scopes and reviewing

specifications, estimating costs, receiving and

evaluating bids, awarding contracts, planning work,

scheduling work, coordinating work, administering

contracts, cost tracking and Field Supervision of

contractors performing work to ensure that projects

were completed on schedule and within budget with

little or no interruption to the stations day to

day operations. Specific projects and

accomplishments included: More projects available

on request.

Fall 1999 - Commonwealth Edison Fisk Station,

Chicago, Illinois

Site Manager and Field Supervisor of contractors,

for the removal and installation of 36" hot reheat

header from boiler outlet header to turbine

intercept valves and from turbine intercept valves

to reheat turbine cylinder. Included in

contractors scope was air heater wash, boiler wash

and air heater seal replacement, also included was

grit blasting precipitator plates and changing out

wires and bottle weights. Directly Supervised 20

man maintenance crew performing maintenance

overhaul on an Allis - Chalmers 380 MW Cross

Compound Turbine Generator. Work included

disassembly, repair evaluation, performing some

repairs, supervising all contracted labor repairs

and reassembly of double flow L.P. Turbine. Other

projects included in scope of work were removal and

replacement of all bearings on H.P. - I.P. train

including H.P. generator to determine previous

vibration problems. Pre and post coupling

alignments on both the H.P. I.P. and H.P.

Generator, and the L.P. dual rotors and generator.

Spring 1999 - Commonwealth Edison Powerton Station,

Pekin,Illinois Site Manager and Field Supervisor of

Mechanical contractor in the overhaul of a G.E. 800

MW Steam Turbine Generator. Unit consisted of H.P.

- I.P. and two dual flow L.P. rotors. Work

included disassembly, repair evaluation,

supervision of all contracted repairs and

reassembly of the Unit. Some of the repairs that

were performed included rebuilding of the H.P.

nozzle block in place, removing and re-pinning last

stage buckets to prevent future damage to buckets.

The rebuilding of H.P. and I.P. diaphragms and

replacement of seal strips. Other components that

were disassembled and repaired and reassembled

include control valves, main steam stop valves and

intercept valves, both steam and oil side. Other

work included in contractors scope,was overhaul and

installation of 4 new traveling screens, removal

and installation of a new coal belt scale, overhaul

of 6 Penn Crusher 500 ton per hour hammer mills,

Complete overhaul of rotating car dumper and coal

hopper.

Fall 1998 - Commonwealth Edison Powerton Station,

Pekin, Illinois

Site Manager and Supervisor of Mechanical

contractor during the overhaul of a G.E. 800 MW

Steam Turbine Generator. Work consisted of

disassembly, repair and reassembly of H.P. I.P.

Turbine. Including all component sandblasting and

major turbine component repair. Other work included

disassembly of generator, off site rewind and

reassembly of the generator rotor in Richmond

Virginia and high speed balancing, all performed

under my direct supervision. Stator wedge

replacement was completed on site. All generator

testing was performed by General Electric under my

supervision. The generator was reassembled upon

return to the station.

Spring 1998 - Commonwealth Edison Crawford Station

Chicago, Illinois

Site Manager and Field Supervisor of Turbine

overhaul contractor performing work on a G.E.285 MW

H.P. Reheat, dual flow L. P. Steam Turbine. Work

included complete disassembly of entire unit, both

turbine rotors and generator rotor were

disassembled, repaired and reassembled on site. All

valves were disassembled both oil and steam side

and repaired and reassembled during the outage.

Other duties included supervising all, on and off

site turbine component repairs.

Fall 1997 - Commonwealth Edison Crawford Station

Chicago,Illinois

Superintendent of overhaul of a Westinghouse 385 MW

Steam Turbine Generator. Work included disassembly,

repair evaluation, repairs and reassembly of H.P.

I.P. Turbine, generator hydrogen seal replacement

on both H.P. and L.P. generators. Hydrogen cooler

removal, cleaning, and reinstalling due to

hazardous material contamination. Control valve

overhaul both steam and oil side, as well as Main

steam stop and intercept valve overhauls. Other

duties included supervision of machining contractor

performing all turbine and valve repairs both on

and off site.

Spring 1997 - Commonwealth Edison Will County

Station Illinois

Site manager and field supervisor of construction

of 24 cooling towers from site development to final

operation, included managing multiple contractors,

schedule and budget.

Fall 1996 - Commonwealth Edison Joliet Station 29,

Joliet Illinois

Site Manager and Field Supervisor of construction

of 24 cooling towers along the Desplaines river to

increase station megawatt output during summer peak

loads.

Spring 1996 - Com Ed Will County Station,

Romeoville Illinois

Site Manager and Field supervisor of construction

of rotary car dumper and radial stacker including

all conveyor systems and all new coal feed system

for a four unit 4 fossil plant. I managed scope,

schedule and cost for the elimination of the coal

unloading by barge system.

Fall 1995 - Commonwealth Edison Joliet Station 9

Joliet, Illinois

Site Manager and Field Supervisor of mechanical

contractor in performing overhaul of G.E. 350 MW

Cross compound Steam Turbine Generator. Work

included disassembly, repair and reassembly of both

H.P.I.P and L.P. Turbines and H.P. and L.P.

Generators. Supervised the removal and

reinstallation of both H.P. and L.P. Generator

stator bars and insulation.

Spring 1995 - Commonwealth Edison Joliet Station 9,

Joliet Illinois

Site manager and Field Supervisor of mechanical

contractor performing complete rebuild of B&W

boiler for 350 megawatt steam turbine, including

cyclone replacement, front, rear and side wall

replacement, side wall header replacement, removal

and reinstallation of SSH horizontal tube

assemblies, entire section. The removal of and

replacement of the ring header and all cyclone

header supply tubes. Including managing of budget

and schedule.

Fall 1994- Commonwealth Edison Joliet Station 9

Joliet, Illinois

Site manager and field supervisor of mechanical

contractor during overhaul of Electro Static

Precipitator, including demo of existing curtains

and wires and reinstallation of new curtains and

electrodes.

Spring 1994- Commonwealth Edison Joliet Station 9

Joliet, Illnois

Site Manager and Field Supervisor of mechanical

contractor performing overhaul of 3 Lungstrom Air

Preheaters, including basket and seal removal and

replacement, gear box overhaul and pin rack removal

and replacement.

Fall 1993 to Fall 1991

Site manager and Field Supervisor working on

numerous construction projects throughout the

Commonwealth Edison Fossil System. Including two

precipitator overhauls, car dumper overhaul,

conveyor belt replacements, numerous boiler

emergency repair outages, turbine boiler feed pump

overhauls, condenser tube replacement and numerous

turbine valve overhauls.

Summer 1991 - State Line Station Hammond IN.

Supervised as General Manager, Overhaul of a

Westinghouse 325 MW Crosscompound Steam Turbine

that was wrecked during operation. Work included

disassembly, repair evaluation, assisting in

repairs, de-stacking of one of the L.P.Turbine

rotor discs, turbine blade removal and replacement,

turbine machining, turbine disc rebuilding and

blade root re-broaching and shimming and

disassembly of the other L.P. Turbine for blade

replacement and machining and the reassembling of

both turbines. Included in my scope was building

of schedule and cost tracking.

Spring 1989 to 1983 - State Line Station Hammond

IN.

General Maintenance Foreman supervising day to day

maintenance program in the continuous operation of

a 4 Unit Station in the Commonwealth Edison System.

Duties include supervising day to day repairs,

periodic overhauls, and preventative maintenance on

the Units

during this time. Have also worked extensively on

all Turbine/ Boiler related auxiliary equipment,

the station was equipped with three G.E. units and

one Westinghouse unit, C.E. and B&W boilers. During

career at State Line Station supervised three

De-stack / Re-stacks on the Westinghouse 325 MW

Crosscompound Steam Turbine for major repairs to

rotors as well as discs and turbine blades.

Spring 1983 to 1974 - State Line Station Hammond

IN.

Performed as station mechanic working primarily on

turbine outages and day to day maintenance of the

plant.

Current OSHA 30

STS safety qualified

References available upon request



Contact this candidate