MARTIN CHIMAN

Austin, Texas

512-***-**** / 512-***-****

abl1ao@r.postjobfree.com

Position applying for: Bridge Superintendent.

• Work experience:Twenty-two (22) + years in the construction Industry: 17

years as a hands-on construction supervisor as a general superintendent,

superintendent, and general foreman with a strong background in Commercial and

Heavy Highway work on various projects. Project size has varied from $1 million

dollars to $400 million dollars.

• Heavy Highway / Civil Work: Working with the Department of transportation

(DOT) my supervisory experience has been on the supervision of the structural

concrete work, excavation work, backfill and base set. I have also supervised the

concrete placement on various types of concrete structures. The concrete forming

systems that I have worked with are EFCO, SYMONS, PERI and ATLAS. Civil work

experience has been on water treatment plants and the infrastructure work associated

with this.

• Commercial work: My commercial supervisory work experience comes from

various projects mainly with general contractors’ .These projects have been on the

supervision of the structural concrete work,the masonry work and the “rough” &“fine

finish” inside work .This has been on office buildings, hotels, condominiums, resorts,

concrete tilt wall shopping centers, computer manufacturing centers and custom

homes.

• Renovation Work: Renovation, update and conversion from office space into

high end condominiums of the historical Brown Building in downtown Austin. Another

project was the structural renovation of a historical 300 year old hotel in Mexico.

• FIELD CONSTRUCTION ABILITIES:Blue Print Reading Ability: Expert blue

print reading ability on structural, architectural, civil, plumbing, HVAC, electrical, rebar

cut sheets, and specifications.

• Lay-out Work: Knowledge and ability to do the entire field engineer work. Ability

to operate the Total station.

• Office Work: Experienced with Word, Excel, OPUS, Auto Cad and various other

software programs

• Concrete Work: Extensive knowledge on the supervision of all concrete work.

• CRAFT EXPERIENCE:

• Carpenter

• Field Engineer

• Steel Tier

• Concrete Finisher

• Heavy Equipment Operator on excavators, loaders, back-hoes, skid loaders,

forklifts, rollers, and tower cranes (remote controlled).

• Fluent in English & Spanish

Most Recent Work Experience: Palmar Loreto Construction Company in

Baja California México.

• General Superintendent: On two (2) projects in Baja California Sur in Mexico.

The combined projects were about $100 million dollars (in the U.S this would be about

$400 million dollars), on two five (5) star resort communities that included Hotels,

Restaurants, Condominiums, a Spa, Luxury Villas and a golf course.

• This work included the infrastructure part of the projects from building public

/private access roads, bridges, box culverts, water lines, etc.

• All the structures were concrete built with concrete shear- walls .The reason

these structures were designed that way is because of the hurricane and earthquake

activity that occurs in that area.

• **The pre-stressed concrete beams for the bridges were manufactured at the job

site .The reason we had to build the concrete beams on site was because in that area

in Mexico, all the roads that lead there, in one section or another have a 7% drop, are

not very wide, and some of the curves there have a 90 degree turn angle. You don’t

want to haul pre-stressed concrete beams on those roads.

• Repairing and preventing damage to structures and foundation pads because of

hurricane activity.

• Worked closely with the projects owners so their time lines could be followed.

• Directed activities of all field and some office personal on this project.

• Monitored a constant pumping out of sea water 24/7. The 24/7 sea water

pumping operation was done because one of the projects started 3 meters (11 feet.)

below sea level. Several divers were hired to work on this strategy.74 k cubic yards of

dirt were moved in the excavation process in that particular area

• Two (2) cast in place concrete cisterns (water tanks) each has a fifteen (15) day

capacity for five-hundred (500) people were built.Coordinated work with Environmental

engineers so this project site conformed to very strict environmental guidelines .These

guidelines had to be followed because of the projects very close location to Mexico’s

Largest (the worlds) National Water Park

• Wrote, designed and produced work schedules, time sheets, daily

reports.Created the construction project’s job safety program based on OSHA’S guide

lines.

• An electronic system (OPUS) was put in place that eliminated a lot of paper work

and helped in the management of man-hours and cost distribution.

• Trained and managed 150+ construction field personnel so a fast paced work

environment could be put into action.The Atlas concrete forming system was used for

this project .

• Three (3) million dollars were spent on buying heavy equipment, such as

excavators, front loaders, concrete trucks, a concrete pump, blades, rollers, dump

trucks, back-hoes, a concrete batch plant and such. This included two (2) remote

controlled tower cranes with the “rigging” system included.

• Conferred with and directed assistant superintendents, foremen and all the

subcontractors’ supervisors on a weekly basis on scheduling revisions, safety

meetings and other things.

• Monitored all supervisors so that all union work rules were followed.

PAST WORK EXPERIENCE :

• M &Z Construction Company. General Superintendent –. On cast in place

structural concrete construction projects of various types. One was on the structural

concrete work on the Hilton Hotel in downtown Austin, Texas. M&Z also worked

on the structural concrete work ( shell work ) on various office buildings and

precast parking structures .All the site prep was self- performed by M&Z. M&Z

also worked for TxDOT on projects such as, bridges, box - culverts, retention

walls, holding ponds, sidewalks,curb & gutter etc. M&Z built several custom

homes .Project size and price varied.

Austin Bridge & Road (Austin Industries). General Foreman on the

standard structural concrete work on bridges, box culverts, sidewalks etc. for

TxDOT. The EFCO, Symons and the snap tie system were used on these

projects .Project size and price varied.

Austin Commercial (Austin Industries): Assistant Superintendent on

the Motorola Campus. This was a design- build project /cost plus .This was a one

(1) million sq. ft. project. My part was on the supervision of the structural concrete

work, the masonry work, and the “rough” inside work .This was a $200 million dollar

project that was finished several months ahead of schedule.

• Linbeck Construction -Superintendent on the renovation, upgrade and

conversion of an office building into high end condominiums .This was on the historical

“Brown building “in downtown Austin .A three (3) story precast parking structure was

added .Linbeck self performed all the excavation and site prep for this project. This

was a $ 20 million dollar project.

• NBS Construction Co. Structural Superintendent / Excavation

Superintendent /Safety superintendent . On several highway projects such as

bridges, box culverts, holding ponds, highway ramps, excavation, and base set.

Project size and price varied.

• McCarthy Bros. Construction. Structural General foreman /Safety foreman.

On the Motorola MOS-13 computer chip manufacturing center .This project was about

$ 300 million dollars.

• Hensel Phelps Construction Co. The Structural Foreman on “Skirt “columns

that are hollow and 150 ‘ft. above the Colorado River .The EFCO concrete “climbing “

forming system was used there. This was a $ 20 million dollar project.

• Austin Bridge & Road (Austin Industries).Foreman on two Bridges for TxDOT

on the structural concrete work on columns, caps, beam set and concrete

placement .Price and size varied.

• Hensel Phelps. Foreman on the structural concrete work on the interchange on

Mopac & 290 in Austin, Texas on the concrete foundations, columns, hammerhead

caps, pre-stressed concrete beam set, concrete panel set and concrete placement.

This was a $40 million dollar project.

• EDUCATION: High School education at the West Chicago Community High

School in Illinois. College at U.A.D.M.de Mexico.