Post Job Free
Sign in

Maintenance Plant Manager

Location:
Jackson, AL, 36545
Posted:
July 20, 2010

Contact this candidate

Resume:

MARCUS PITTMAN

?*** Blue Springs Circle ? Jackson Al 36545 ? H: 251-***-**** C:

251-***-****

? Email Address: *.*.*******@*****.***

Objective: Maintenance Planner Manager/Supervisor

Summary of

Qualifications:

? 33 years of experience in industrial manufacturing

? Over 18 years of experience in computer based

maintenance systems

? Experienced in capital equipment request,

management and installation

? Strong people skills including Safety

Accountability

? Computer literate and technically experienced

? Self-motivated and results driven

? Knowledgeable in all aspects of industrial

manufacturing

? Respected for interpersonal skills, integrity,

leadership, team building and creating an atmosphere

that employees enjoy working in

2009-2010 Seadrill

NOTE: Laid Off due to departmental downsizing

MAINTENANCE PLANNER

o Asset Register structure build and review

o Define start date for all maintenance jobs

o Develop/Build "1st Line Maintenance Manuals" for

Drilling, Marine, Subsea

o Assign serial numbers to all rig serial equipment

o Identify critical spare parts

o Attach drawing Numbers to equipment in CMMS

o Identify spare parts and attach to equipment in CMMS

o Build Repetro Inventory (Equipment List) for

authorization of foreign country entry

o Review all maintenance tasks with crew

o Communicate and coordinate with shipyard project

team/vendors on equipment information, drawings etc.

o Coordinate daily and long term planning of maintenance

activities

o Provide staff with current and future maintenance status

o Provide technical support and training of CMMS to crew

2008-2009 Larsen Oil and Gas

NOTE: Company filed for Bankruptcy

MAINTENANCE TECHNICAL ASSISTANT

? Administratively assisted Chief Engineer

o Inputted all PM routines and jobs for all disciplines

into system for

export into Maisy Data

Base

o Applied SFI codes to all assets on rig

o Consolidated all maintenance/operation manuals into

organized

filing system

? Created, "Drill Floor Equipment Lubrication Manual".

? Managed Technical Library

o Researched and provided drawings, equipment manuals,

data sheets

etc. for maintenance personnel

? Managed Computerized Maintenance Management System-

MAISY

o Provided necessary information to ensure Contractual

Obligations were met

? Verification of equipment tag information

? Designated as a Musteror for Life Boat evacuation

2003-2008 Weyerhaeuser Co. Pine

Hill Alabama

NOTE: Plant closed due to economic recession

DEPARTMENTAL MANGER

? Managing all aspects of departmental manufacturing

? Managed 6 salaried 70 hourly employees.

? Safety 0.0 RIR

? All mechanical/electrical supervision reported to

me

? Managed all maintenance activities,

planning/scheduling through SAP Computer Based

Maintenance System

? Provided historical equipment failure analysis to

maintenance department

? Responsible for all capital requests and

installations

? Decreased unit cost $14.10

? Increased uptime 9.6%

? During plant manager absences, delegated as

Interim Plant Manager.

1999-2002 International Paper,

Newberry SC

SUPERINTENDENT

? Managing 68 employees 2 lead men, 2 supervisors

? All maintenance personal reported to me.

? Scheduled and planed all maintenance through SAP

system

? Uptime increased by 8%

? Overtime decreased by 3%

? Oversaw the design, request and installation of all

capital equipment.

? Put into place methods to measure: Supervisor/Lead

men results, downtime opportunities, cost savings,

quality results, safety incentives, production goals,

and other methods to make informed decisions

? During plant manager absences, delegated as Interim

Plant Manager.

1984 -1998 Weyerhaeuser

Corporation, Holden, LA

SUPERVISOR

? Managing 43 hourly employees, 1 supervisor, 1

foreman, and 2 leadmen Responsible for all aspects of

manufacturing and shipping departments.

? Implemented preventative maintenance program

resulting in improved uptime and lower cost.

? Helped schedule and plan all maintenance through

the Maximo computer based maintenance system.

? Interview and hire all departmental employees

? Replaced non-functional employees with efficient,

experienced, results oriented employees, through

attrition, skill upgrades and disciplinary measures.

? Implemented new Safety program (Lock Out & Personal

Protective Equipment) placing total responsibility on

management/supervision. (MOST IMPROVED RESULTS ON

PLANT.)

1981-

1984

Crownzellerback, Holden,

LA

Boiler/Burner Operator/Lead man, performed all maintenance

for area, gearboxes, bearings, valves, chains, sprockets

etc. preventative and emergency repair, managed area

employees.

Continuing Education

Computer Training

IFS (Computerized Maintenance Management System)

Bi-Cycle (Computerized Maintenance Management System)

Maisy (Computerized Maintenance Management System)

SAP (Computerized Maintenance Management System)

Maximo (Computerized Maintenance Management System)

TQM-Total Quality Management

Aker MH Courses

? MH Hydraulics 1

? Semi Submersible Introduction

? Intelligent Operator Chair

? Drill View System

? Smart Zone Management System

? Drill Floor Equipment

People Soft

Excel

Power Point

Word

Microsoft Windows

Lifas Inventory Control

MDS

Active Plant

Situational Leadership

Managerial Training

Achieve Your

Potential

Zienger Miller Supervisor Training Course

Steven Covey 7 Habits

Managing Multiple Properties

How to Handle Difficult Employees

Budget Management

Supervisor/Coach Workshop

Positive Management Leadership

Customer Value Based Marketing

Computer Base Business

Simulation



Contact this candidate