Post Job Free

Resume

Sign in

Manager Power Plant

Location:
Manassas, VA, 20109
Posted:
August 09, 2010

Contact this candidate

Resume:

DRAGO PEJATOVIC

Civil Projects ESTIMATOR, Construction Engineer

estimation, design, construction, inspection,

Contact phone 251-***-****, abl0ju@r.postjobfree.com

Key Qualifications Estimation, Site development, inspection,

construction, normally in superintendent/manager position

for airports, power plants, factories, school, hospitals,

commercial, military bases, tunnels, buildings, family

housing, sport halls, public underground infrastructure,

water/wastewater treatment, sewage system, water

reservoirs, gas/oil tanks, pipelines, electric transmission

lines.

Accomplished feasibility studies and estimating, Environmental

Impact Studies and Land Development

References: KELLY HARLESS : 251-***-****

CHARLES TUBRE : 225-***-****

RICHARD WAGNER: 713-***-****

EXPERIENCE

March 2009-Jan 2010 ENBRIDGE ENERGY INC: www.enbridge.com

2 tanks 250 K Bbl, 140 Mi, 24" pipeline, pump stations 3

Lead Inspector for civil and survey work. Responsible for

quality plan, and

company application procedure and technical specifications

for all stations

Nov 2007-June 2008 Gas Pipeline: ENglobal Inspection services,

Jackson, MS.

SESH Project, www.spectraenergy.com, 280 Mi, 36" pipeline

- 3 compressor station

- 3 buster station & 9 metering station

Lead Inspector for civil and survey work. Responsible for

quality plan, and company application procedure and

technical specifications for all stations.

Feb 2004-Aug 2007 Mine Projects: Kappes,Cassiday and Assoc,.Inc.,Reno,

Nevada, www.kcareno.com Industry Leader in turnkey

construction and mining technology

Turnkey Projects in Mexico (3):

- Gammon Lake Mine 160 M$

- Los Filos Mine 440 M&

- Hotschild Inc Sta.Maria Mine 30 M$

Heavy foundation and set up equipment and start up: probes

/ mils, tanks, and other super heavy equipment and pipes

construction

Feasibility study participation and key decision maker.

Construction management as superintendent, responsible for

whole civil works and after commissioning activities

according to the design, quality plans, schedule and with

applicable company procedures, standards and technical

specifications

Nov 2002 - Present Esfeller Construction Company, Inc.

Alabama

General responsibility includes: Construction management

as superintendent, supervision, inspection and responsible

for ensuring the completion of construction and

commissioning activities according to the design, health,

safety and environmental procedures, quality plans,

schedule and in accordance with applicable company

procedures, standards and technical specifications. Project

personnel and financial management and profit/loss

responsibility.

Prepare milestone completion of work and progress reports,

attend regular progress meeting with the client's

representative (engineers) to discuss critical issues and

progress. .As Built design and contract close.

Inclusive Date: Nov 2003-Present

Project: Airport Fairhope, Alabama

Position: Superintendent

Client/Investor: Alabama Department of Transportation- Aeronautic

Construction of new runway, 6,600-foot excavation, grading,

concrete works, asphalt.

Over-all responsibility including estimates, personnel

management, financial management, project schedules and

quality control.

Inclusive Date: Jul 2003 - Nov 2003

Project: Reconstruction of Runway, Jackson, Alabama

Position: Superintendent

Client/Investor: Alabama Department of Transportation-

Aeronautica

Reconstruction of runway, 4,350-foot excavation, grading,

concrete works, striping, and painting.

Inclusive Date: Nov 2002-Jul 2003

Project: St. Elmo Airport, Alabama

Position: Quality Control & Program Control

Client/Investor: Department of Transportation, Aeronautica

Alabama

Complete reconstruction of 5,520-foot runway, taxiway and

construction of new apron and taxiway, striping, painting

and tar rejuvenator.

Jun 2001-Nov 2002 CIS

Cleveland, Oklahoma

Project: Gulf Stream Natural Gas System

Position: Civil Construction Inspection

Client: Joint Venture of Williams-Duke Energy,

Houston Office

Project on shore / of shore 430 miles of 36" pipeline and

compressor station 3 compressor, 137,000 hp, concrete

works, asphalt, water storm ducts and site grading.

Initially assigned as Project Inspector to approve all

construction work, but due to lack of local staffing

capabilities, acted as Civil Works Manager. Responsible

for excavation, grading, concrete, asphalt, and organizing

and managing all equipment.

1999 - 2001 Novoa Ingenieros SA in association with IMS

Peru, South America

Inclusive Date: Sep 1999-May 2001

Project: Northern Peruvian Pipeline

Position: Principal Construction Superintendent

Design and construction of 6 pumping stations and 120 miles

of high pressure natural gas pipeline.

Seconded to IMS, an American company devoted in

energy, industrial and construction projects. Acted as

External Advisor for energy equipment for their various

projects. Checked and approved suppliers' design criteria

and documentation requirements.

1992 - 2000 Novoa Ingenieros SA

Peru, South America

Work included civil works design, construction management,

estimates, supervision of drilling, erosion control and

protection, site development, grading, concrete and asphalt

pavement.

Implement construction approaches such as detail layout,

lines, grades, elevations and measurements for equipment

and vessel foundations, structural steel installation, pipe

supports and all building structures. And oversee the civil

maintenance work and development in the

gathering/production station facilities, gas plant, support

facilities/buildings, airstrips, access road and

preparations/construction of rig locations (earthworks,

concrete structure and access roads).

Participated in the following construction projects:

Peru, South America

Construction Superintendent, Regional Hospital,

Phases I and II, Chiclayo, Peru, 1999

Construction Superintendent, Construction of

Channel/Tunnel, Pampa Grande, 1999 -PERU erosion

control, grading, concreting and probes

Design Manager, Feasibility Study Hydro Electric

Power Plant, River Mantaro, 1998 - PERU - Hydraulic

increment of largest hydro-electric power system in

Peru, 4,600 MW

Field Manager, Antamina Project - PERU, 1997/98 -

Route of mineral duct 150 miles, access roads and main

camp, GIS, ROW

Construction Superintendent, Construction of New

Pier, Port Paita, Peru, 1997 - Second largest port on

the Southamerican Pacific coast. Included the erection

140 feet long of concrete piles (240).

Construction Superintendent, Casapalca Mine, 1997/98

- Review design and construction of underground tunnels,

access roads and lift shaht.

Project Manager, 96 kms. Rural Roads, Puno County,

Peru, 1996 - Design program, GIS, ROW

Project Inspector, Reconstruction of North Pan-

American Highway, 600 miles - Inspection, QC/QA.

Project- Field Manager, shrimp farms (5) construction

in river's delta in

north Peru and south Ecuador (South America); soil

grading, ponds, dikes, regulated water level

construction and water treatment facilities starting

from zero,startup production and transportation

logistic .

Designer/Construction Superintendent, Design and

Construction of Dam at Chira-Piura 3/Sullana, 1990-91

and 1992 -PERU, 125 Ml. of concrete channels, riverside

dike, drainage channel, rock excavation, and grading.

For the design, included study for new power station.

1970 - 1992 ENERGOPROJEKT Holding Corporation

Belgrade, Serbia

Overall responsibility covered design, supervision,

construction of: tunnels, roads, power plant, oil pressure

pipelines, water/sewage systems and water-water treatments,

mines, airports, GIS, GPS, ROW of more 70 projects in

various sizes.

Europe, Middle East and North Africa

Site Manager, HE Derdap I, 1989 - Sedimentation

measurement and control in river bed, interpretation

results and control of underground water level in areas

of influence, measurement for stability deformations.

Superintendent, Kolubara 2: TE Coal Plant, 400 MW,

1989 / open pit: Grading, erosion control, concrete, set-

up of mechanical and steel equipment, heavy cranes, coal

mills, measurement for stability deformations, and

interpretation.

Kolubara 1 : TE Coal Plant; 250 MW,1989,

rehabilitation and reconstruction of existing roads,

open pit levels and relocations of existing conveyors

and huge big excavators 125 tons truck hoe.

Site Manager and Development Manager, Mandawa, Iraq,

design for construction of High Rock, Dam, 1988 -

Geology, geomechanical, seismic and survey.

Haditha project,Iraq; big D=36 feet hydro electric

tunnel/ construction.

Superintendent, Tesla 2, 650 MW Coal Power Plant,

1987 - Set up of heavy equipment; 6 coal mill. 105 ton

each, 6 stators, power distribution center, excavation,

grading, concreting and asphalting.

Manager of Logistics Operation, Belgrade

International Airport, 1987

Reconstruction of runway and 4 taxiways; concrete and

asphalt. Schedule: 180 hours, done in 135 hours; more

than 600 construction equipment and 2,000 crew; 24-hour

work in a busy airport. Complete commissioning of civil

works. 90% of works was concrete and asphalt

Field Manager, HE Power Dam "Priboj" design, 1987 -

location and site investigations

Investigation Jobs Manager, New HE Dams design,

Algeria (South Atlas Project), 1986 and 1985 - Location,

site investigations, drilling, geology, geomechanics,

seismic and survey works

Superintendent, Water Treatment Plant, Belgrade, 1984-

85 - Initial site works, basement concrete works, set-up

of equipment and start-up probes.

Field Manager, Coal TE Power Plant, 650 MW, TESLA 2,

1984 / open pit - Design, drilling, geotechnical probes,

survey and site development, measurement for stability

deformations, and interpretations.

Designer, Civil Works, 120 Mile Dam, Piura 2 Project,

1981-83 - Design for dams, dikes, drainage channels and

irrigation concrete channels, stability measurement and

interpretation of results.

Site Manager, Downtown GIS Development, Baghdad,

Iraq, 1981 - Plan development for transportation system

and old historical building restoration and cartography

Superintendent, 600 MW Coal Thermal Energy Power

Plant, Obilic 2 Project, 1980-81 -open pit; heavy

equipment concrete basement layout, equipment set-up,

coal mills, turbines, rotors, asphalt, grading, erosion

control, river Lab bank reinforcement

Investigation Works Manager, "Western Desert", Iraq.

1976-79 - geomechanical, seismic and geological

surveys, drilling for water and oil;

surveying/triangulation

Inspector, Construction of Concrete/Rock Dam,

Vlaisina 1, 2, 3, 4; 1976-77 - Stability checking,

geomechanical, topo and hydro drilling probes. Corrosion

control of rebars in tunnel's concrete. Interpretation

of results.

Superintendent, Construction of HE Power Plant at

"Baina Basta2" 360 + 120 MW, 1975-78. New rock dam,

tunnel 8.5 km long. 45% slope of steel pipe 2x36" for

water flow, 1600 ft. length. Extremely hard construction

condition due to terrain slope. Drilling, concreting,

planning, scheduling, and heavy equipment set-up.

Superintendent, Derdap 2, HE Power 360 MW, dam

construction, 1974 - River bank protection, erosion

control, access roads, set-up control of turbines,

rotors and stators.

Superintendent and Site Manager for Civil Works,

Construction of Panama Airport, (#5 airport worldwide),

1973-74, Construction of a new 1.8 mile long runway,

9100 ft x 260 ft, and 5 taxiways, 10900 ft x 150 ft;

apron for airplanes, 1450 ft x 450 ft. Access on

wetlands including drainage, gabions, erosion control,

stabilization of soil, dragging, compaction with special

methods and equipment, probes, concrete and asphalt

pavement. Foundation and construction of new main

building, ramps for vehicles using the terminal; 22500

cu yd concrete and piles for building foundation.

Supervised excavation and concreting of runway in a

tightly scheduled environment due to normal flight

operations of the airport, where an airplane takes off

every 3 minutes on the existing runway.

Superintendent, Construction of HE Power Rock Dam,

Gazivode, 1972-73 - 330 ft. high, 0.5 mile long.

Superintendent, Construction of Concrete Dam, Zarka,

Jordan, 1971 - 205 ft. high. Construction of access

roads, diversion tunnel, and cable crane.

Superintendent, Construction of HE Power Road Dam,

Bovan, 1970 - tunnel, roads, and new lake banks

protection.

Supervisor, Inspector Field Manager/Assistant,

Construction of 2-1600 MW HE Power Plant, Derdap 1, 1969-

70 - Largest concrete dam in Europe, 200 ft. high,

mile long, crossing biggest river in Europe, Danube,

border Yugoslavia-Romania. Cross-section of new lake

area, access roads, site dike reinforcement, heavy

equipment set-up, turbines, rotors, stators, concrete

basement for heavy equipment.

Prof. Affiliations Engineering Association of Peru, T-358

Engineering and Technician Association of Yugoslavia

Education -Associate Degree, Advanced School of Geodesy, Belgrade

University.

-High Technical School for Metrology, Surveying, Land Development,

Geodesy.

Trainings/Seminars Computer courses, Basic, DOS, Word, WP, EXCEL, ACAD,

Estimating programs: Terramodel, Paydirt Site Work, Quest,

Primavera 1

Attended: Environmental, Safety courses for pipelines and oil

facilities, GPS, GIS

Languages: Serbo-Croatian Native

Spanish Excellent

English Fluent

May 2010

Virginia



Contact this candidate