Post Job Free
Sign in

Engineer Process

Location:
Clinton Township, MI, 48038
Posted:
September 21, 2010

Contact this candidate

Resume:

PHILLIP L. GAIETTO

***** ************ ******

Clinton Township, MI 48038

248-***-****

Over 20 years experience regarding design, implementation, and support for

implementing / upgrading manufacturing and management systems. Results

oriented self starter with a proven ability to find hidden value by

streamlining operations and support processes to address changes in

internal and customer needs, via systems / personnel / materials

assessment, technology application, project management, personnel

development, and leadership.

CAREER OBJECTIVE: Leadership role within a highly adaptive, customer

driven organization that utilizes my skills and experience in implementing

technical change to increase profitability.

EDUCATION: MBA Belmont University, Nashville, TN December 1993

BSChE Ohio University, Athens, OH August 1986

KEY SKILLS:

Plant Management, Trainer: HS&E, SAP, MRP Forecasting &

Supervision Budgeting

Manufacturability Recipe / Methods Process Analysis,

Assessments Development Economics

Technology Transfer Equipment Specification Facility Design /

Build / Startup

Fill Line/Packaging Time Studies, Task DCS, Instrumentation,

Engineering Streamlining CAD

Quality Engineering / Maintenance Planning Warehouse Management

Statistics

EXPERIENCE:

Production Manager - 15 Million Pounds per year Hot Melt Adhesives Facility

Adhesive Systems, Inc. 14410 Woodrow Wilson, Detroit MI July

2004 to Present

. Responsible for weekly yields, manpower, utilities, order fulfillment

rates, quarterly inventories

for a 3 shift, 24 hour operation running 5-7 days per week,

union workforce

. Planned all process, labor, materials, supplies, and freight using

manual MRP system

. Developed Preplanning System for Raw Materials and Finished Goods:

Filled standard (>2wk) orders at 100% using order patterns, field

information, order predictions

Improved scheduling / process capability to fill orders with less

than 2 week leads to above 97%

Reduced Working Capital (Finished Goods and Raw Materials) by

$700,000

Streamlined Finished Goods Handling via staging shipments right off

packaging line

. Design / Implemented 10 Hour Staggered Shift Schedule, reducing

Overtime by 50%

. Developed / Maintained / Improved Mixing Instruction Sheets for all

Formulas

. Implemented plant improvement and material reclamation projects:

* 120,000 Lb. idle materials reclaim per year for three years

($150,000/yr).

* Designed and tied in $5000 box filling system, avoiding $125,000

capital investment

* Changed Process and Procurement methods to reduce rupture disk costs

by $5000/yr.

* Changed coolant system circuit to allow concurrent cutting on two

lines for double rates

* Developed Plant Expansion Proposal for 65% capacity increase using

existing equipment

Quality Engineer/Manufacturing Engineer/Process Set Up Operator - Liquid

Bottling Plant

Axios Staffing / KDM Engineering

Assigned to Bissell, Inc., Grand Rapids, MI December 2002 to

July 2004

. Quality Engineer:

* Process Economic Assessments using Accounting Software

* Batch Controls Recipe Management Using Controls Database

* Led Batching and Packaging Trials on new formulations from R&D

. Manufacturing Engineer:

* Batch System Recipe Development & Ingredient Handling Systems design,

pH/SG loop design

* Engineering for Bottle Fill Line and Pack Out Systems improvements

* Bill of Material Adjustments in Accounting Software

* Caustic Handling System Commissioning, Environmental Support

. Supervisor - Process Set Up:

* Supervised Upright Handle Assembly, Repack, and Chemical Packaging

Areas

* Automated Batch System Operator training / Supervision (Hands on

operation)

* Developed Graphical Layout and Instructions to speed Liquid Tote

Setup, eliminate errors

* Created Process Packs for Bottle Fill and Pack Line, increased First

Time Right by 20%

* Developed Filler Change Over parts handling methods, reducing change

time by 30-60%

Project Engineer - High Purity Solvents Manufacture

Honeywell - Burdick & Jackson Muskegon, MI March 2000 to August

2002

. $425K Glass Lined Tanks / Piping / Condenser Installation

* Developed Process System, Equipment Specs & Instrumentation (PIDs,

PFDs, etc.)

* Oversaw Contract Engineering and Construction - structural steel,

controls, etc.

* Saved $35K by retrofitting idle glass tankage

. $175K Glass Bottle Filling Line Retrofit: Fill / Cap / Label / Package

Flammable Solvents

. $45K Bottle Dosing System with Reservoir to increase fill accuracy to

specifications

. Obtained and installed $2,500 desiccator to eliminate need for $125K

drying tower project

. Installed piping changes to allow concurrent package filling without

major engineering studies

. Installed $8,500 pump/pipe system, eliminating need for $65,000 mixing

system project

. Used SAP Modules to track projects, provided training during SAP

startup

Process Engineer - Paint Pigment Manufacture

Millennium Inorganic Chemicals, Ashtabula, Ohio August 1997 to

January 2000

. Process engineering for Water based slurry handling, Spray drying,

Waste Treatment

. Hands on operation of plant equipment during 16 week strike

. Suggested, Tested, Implemented process flow method to increase spray

dryer yield by 15%

. Developed method to reclaim 40 Tons of off spec TiO2 using existing

equipment and lab specs

. RFC documents, PID & PFD development, equipment specification, process

analysis

. Investigation / Initial Dryer Upgrade Proposal to reclaim pigment & ore

. Trainer: SAP startup: BOM / Recipe / Production Schedule / COGI error /

Confirmations

Process / Project / Environmental Engineer - Platinum Catalyst Manufacture

CYTEC Industries - Criterion Catalyst, Belmont, WV July 1994 to

August 1997

. Logged, Mapped, Reported all emission points for Annual SARA and WV Air

Quality

. Removed all D009 (Mercury) Hazardous Waste from facility, per WV

guidelines

. Design / Install Windows NT Local Area Network within two Corporate HQs

specifications

. Design / Fab of Special Refillable Container, Container Loop Setup /

Management

. Design / Install Acid Scrubbers and Acid Dosing Pumps (HNO3 & HCl)

. FRP tray development to reduce $25K capital versus granite coated steel

trays

Process Engineer - Primary Metals Manufacture (Lixviation, Purification,

and Electrolysis)

Jersey Miniere Zinc Clarksville, TN December 1986 to

July 1994

. Designed, constructed, supervised system to remove mercury from

process waste streams

. Proposed, implemented fluoride purge system to re-secure zinc cathode

harvesting

. Created system to eliminate Cadmium Oxidation step, reduced exposure,

increased output 20%

. Proposed, implemented zinc dust size controls using DOE to increase

purification rates 15%

. Developed computer model of facility: predicted process flows,

concentrations, economics

. Technical junkets to sister plants, working with German, Belgian,

French Engineers.



Contact this candidate