GARY S. MCKINNEY
Tampa, FL ? abkwe0@r.postjobfree.com ? 770-***-****
VP OPERATIONS
OPERATIONS MANAGEMENT ? MANUFACTURING
STRATEGIC PERFORMANCE IMPROVEMENT
Outstanding ability to assume complete ownership of all operations and
projects with a strong commitment to quality and customer satisfaction.
Exceptional expertise in transforming underperforming operations.
Achieves operational efficiencies without compromising customer service and
satisfaction. Consistently able to deliver mission-critical projects within
budget and under the tightest deadlines.
Drives operational Lean Production, Lean Systems and Continuous
Improvement. Exceptional ability to consolidate plant operations and
initiate start-ups.
Historically receives the maximum performance bonus achievable from all
companies.
Strategic Business Planning Change Management
Stakeholder Presentations
Profit & Loss Responsibility Performance Improvement
Safety, Health, Environment
Operations Management Team Leadership/Motivation Overhead
Reduction
Operational Streamlining Employee/Labor Relations
Cost Reduction
PROFESSIONAL EXPERIENCE
Ancient Mosaic Studios, LLC, Fort Pierce, FL
2006 to 2009
Handcrafted tabletops from select Italian marble and travertine, faux stone
tabletops and crushed stone accessories.
Vice President of Operations
Hired with full operations responsibilities including Quality Control,
Scheduling, Shipping, Manufacturing and purchasing. $2.5M budget. Reported
to CEO.
Drove improved process, performance and productivity initiatives:
The company was running 12 weeks behind schedule in filling orders. Stepped
in and assessed all processes. Created and implemented new processes and
procedures to track all operations. Transformed each operation to maximize
efforts and realigned labor.
. Successfully cleared sales backlog and reduced lead time to customer
to 2 weeks.
. Created manual MRP system to pull product thru processes.
Implemented LEAN manufacturing principles to include cellular
manufacturing. Cross trained labor to improve efficiency and effectiveness
and to meet US labor laws
. Reduced process errors and increased throughput.
. Reduced purchased materials by 12% by contracting with suppliers to
buy on demand.
Acquired and relocated crushed stone rotomolding business from Atlanta, GA
to Ft. Pierce. Restructured existing space requirements to accommodate new
business. Set up new business with LEAN manufacturing principles.
. Successfully relocated and put into operation in 3 weeks.
Acquired and relocated faux stone business from Phoenix, AZ to Ft. Pierce.
Designed and built new products from scratch for market show. Implemented
LEAN manufacturing principles.
. Successfully moved and put into operation in 6 weeks.
Hoshizaki America, Inc., Peachtree City, GA
1999 to 2006
Manufacturer and distributor of commercial ice machines and refrigerators
including dispensers, cubers, bins and flakers.
Director (Plant Manager)
Hired with full responsibility for Griffin manufacturing plant. Budget
$20M. Reports included Plant Superintendents, Shipping Manager,
Manufacturing Engineering Manager, Scheduling Manager, Quality Control
Manager and Design Engineering Manager. Reported to Division President..
Drove improved process, performance and productivity:
Transformed plant to return to profitability and reduce turnover within 3
years. The plant was losing $6M on $18M sales. Developed 3 year
manufacturing strategy to achieve corporate financial initiatives.
Installed capital equipment to increase capacity and promote cellular
manufacturing. Initiated new production planning system to track production
within the facility. Implemented ISO9001. Created and implemented a new
skill pay system to attract and keep employees.
. Achieved profitability within 3 years while sales remained flat.
. Reduced expenses by $1.4M.
. Decreased product labor content by 1.2 hours.
. Improved employee seniority from .7 months to 2.5 years. Savings
calculated to be $1.2M per year. System was adopted across the
company.
John Deere Commercial Worksite Products, Inc., Loudon, TN
1997 to 1999
World's leading provider of advanced products and services for agriculture
and forestry and a major provider of advanced products and services for
construction, lawn and turf care, landscaping and irrigation.
Manager, Manufacturing Operations
Responsible for all plant operations. Direct reports included Manufacturing
Superintendents, Shipping/Traffic Manager, Paint Manager, Manufacturing
Engineering, Purchasing, and Scheduling Managers.
Drove improved process, performance and productivity:
. Developed and implemented skid steer attachment manufacturing
strategy, all internal manufacturing operations and all staffing
strategies.
. Negotiated contractual obligations for OEM products worldwide.
. Created make vs. buy and decision analysis for Deere branded products.
. Developed manufacturing strategy for start-up operation.
. Integrated build to order operations with SAP business platform.
Sunbeam Corporation, Bradenton, FL
1995 to 1997
Leading manufacturer of kitchen appliances, bedding and home and health
products. Plant manufactures Outdoor Aluminum Patio Furniture.
Plant Manager
Hired with full responsibility for plant. Reports included Manufacturing
Managers, Purchasing Manager, Accounting Manager, Customer Service Manager,
Scheduling Manager, Shipping Manager and Human Resources Manager. Budget
$21M. Reported to Senior Vice President.
Drove improved process, performance and productivity:
. Consolidated 5 manufacturing sites across Florida into one facility.
. Installed business software platform for running daily operations.
. Installed powder paint operation to accommodate 15 color variations.
. Re-engineered welding fixtures for changing product lines.
. Introduced cellular manufacturing to reduce WIP.
. Initiated pull system through assembly to allow the shipment of
finished goods daily.
Carrier Corporation, McMinnville, TN
1988 to 1995
World leader in air conditioners, furnaces, HVAC and central air
conditioning products, providing air conditioning, heating and
refrigeration.
Manufacturing Engineering Manager
MANUFACTURING ENGINEER
Responsible for the metal fabrication, tube, coil and paint shop sustaining
activities for Carrier's commercial large rooftop/chiller manufacturing
facility. Direct reports included 15 Manufacturing Engineers. Budget $6M.
Reported to Plant Manager.
Drove improved process, performance and productivity:
. Developed new product introductions, quality indices, and production
changes, and new personnel changes.
. Implemented ISO9001, Demand Flow Manufacturing and initiated work cell
environment to improve throughput, increase quality, decrease WIP and
improve efficiency.
. Effectively completed the strategic direction for fabrication and
wrote specifications on tooling and/or fixtures for the HVAC
manufacturer.
. Trained by the originators of the Toyota Production System (TPS).
Collaborated on multiple Kaizen events over the next year.
. Designed the first differential pressure testing station in the HVAC
industry that has become the standard for coil testing in the
industry.
. Conducted time studies for part and unit costing.
. Completed $15M of capital expenditures.
EDUCATION & PROFESSIONAL CERTIFICATION
Executive MBA, Operations Management, Vanderbilt University
Bachelor of Science, Electrical Engineering, University of Tennessee