Post Job Free

Resume

Sign in

Engineer Design

Location:
Minoa, NY, 13116
Posted:
September 20, 2010

Contact this candidate

Resume:

Michael P. Bourgeois, LEED AP abkumo@r.postjobfree.com

*** ******** ****, *****, ** 131**-****-***/656-9471

CAREER SUMMARY

Senior Project Design Engineer (HVAC) with 20+ years experience and a

demonstrated ability to analyze and design mechanical systems for heating,

cooling, ventilation, refrigeration, plumbing and fire protection projects;

select, supervise and develop project teams that complete projects on time

and within budget; and maintain close client relationships to confirm

contract conformance, and meet client expectations.

AREAS OF TECHNICAL EXPERTISE

Project Management Mechanical Engineering

Proposal preparation new and NFPA, ASHRAE, ASPE and IBC codes

renovation work Operation and maintenance manuals

Commissioning documents Technical reports / Energy analysis

Construction Cost estimating Systems analysis and Code compliance

Design and Construction Management reviews

Consult with clients to determine Design/selection of piping,

objective and resources of projects ductwork, pumps, boilers, chillers,

towers and control systems

Develop projects in specific regard Prepare engineering contract

to engineering scope of work, budget documents following established

and schedule office/client standards

Energy conservation and recovery

systems

PROFESSIONAL EXPERIENCE

Senior Project Design Engineer Argus Engineering, Syracuse, NY 2009 -

2010

. System engineering/construction management for diverse settings,

including building additions, schools, hospitals, higher education

projects (SUNY IT/SUNY Cortland), and geo-thermal applications.

Senior Project Design Engineer O'Brien & Gere, East Syracuse, NY

1998 - 2009

. Multiple chiller plant designs for health facilities and industrial

clients. Provided HVAC / Energy conservation system engineering/

project management, for various higher education and industrial/

municipal buildings.

. Multiple telecommunication HVAC system engineering projects, including

design of the largest MSC for Verizon Wireless in Cincinnati Ohio,

totaling $20 million in mechanical work.

Senior Project Design Engineer Bernier, Carr and Associates, Watertown,

NY 1996 - 1998

. System engineering and construction management for health care and

higher/educational facilities, including design of radiant heating

systems for a vehicle maintenance facility, and a kidney dialysis

center.

. Victor Central School District; Campus building(s) energy conservation

renovations along with a High School multi-level addition and kitchen

HVAC design, DDC system integration and radiant floor heating of its

clearstory foyer-entrance.

Project Design Engineer Design Concepts, East Syracuse, NY 1993 -

1996

. Projects include three one-million dollar plus chiller/boiler

replacements and multiple telecommunication HVAC system engineering

projects for Bell Atlantic/NYNEX.

Project Design Engineer Robson & Woese, Inc., Syracuse, NY 1979 -

1993

. System engineering, specification and construction management for

diverse settings, including building additions, universities, schools,

hospitals, military projects, municipalities, and industrial

applications.

EDUCATION

AAS (Air Conditioning Technology) State University of New York at

Alfred, Alfred NY 1976 - 1978

LEED AP United States Green Building Council - Technical

Workshop 2009

Professional Memberships ASHRAE (local past president) and ASPE

Michael P. Bourgeois, LEED AP abkumo@r.postjobfree.com

405 Ferndale Lane, Minoa, NY 131**-****-***/656-9471

ADDENDUM

KEY PROJECTS (Selected)

Projects include data center/telecommunication facilities, boiler plants

(steam /hot water), ice rinks (dehumidification), chilled water

plants/systems, educational and healthcare facilities ...

Verizon Wireless

. Cincinnati -Mechanical lead/project management for Verizon Wireless'

largest, 72,000sq.ft. Administration/ switch facility. $20 million in

mechanical work included; multiple/redundant HVAC/DX systems, multi-

room smoke purge systems, heat recovery ventilation systems and a

three-tank fuel oil system for 5 emergency generators, all automated

by a 1,600 point DDC system.

. Syracuse / Rochester/ Pittsburg, PA/ Columbus, OH, new 41,000 sq. ft.

administration/ switch facilities, predecessors of the Cincinnati

project. Provided performance based Fire Protection contract documents

for these buildings

Knolls Atomic Power Laboratory

. Central Computer Facility; Understanding the clients objective, took

clients initial concept and developed innovative, budget saving two-

phase concept into a project to replace 500 ton cooling towers and

join two chilled water plants into one chilled water plant. Project

utilized two, once a year, 48 hour shutdowns.

. Central Computer Facility; Understanding the clients objective, took

clients initial outdoor, rooftop emergency chiller concept and

developed an indoor concept. Project saved budget and utilized a close-

by mechanical space that formally held a chiller system.

. Developed schematic report with plans for a 80,000sq. ft. multi-level

Materials Development Building. Systems/spaces developed for the

report were chilled water and steam utilities entrance, constant and

VAV HVAC systems. Central mechanical room locations, various

compressed gases, hot and tempered water loop systems.

. Project Mechanical Lead for a 20,000 sq. ft. Maintenance and Repair

facility. Mechanical work included, Constant and VAV HVAC Systems,

high pressure steam reducing station, steam and hot water piping

systems, compressed gases and air systems, vehicle, paint booth and

bench exhaust systems, and two dust collection systems.

State University of New York - Health Science Center / Wieskotten Hall

. Health Science Center - Chilled Water Upgrades; Project

Manager/Mechanical Lead for providing 1500 ton cooling tower

replacement, two 730 ton electrical and one 720 absorption chillers

into the basement area. Project involved locating the system expansion

tanks to the 10th floor and installing a pumped (recirculated) vent

line from the basement air removal assembly to the expansion tanks and

back, to make room for the secondary chilled water pumps/piping for

the new primary/secondary chilled water system.

. Wieskotten Hall; Construction Manager/Mechanical lead, building was

decoupled from the Hospital basement system and a new dual 600 ton

chilled water primary/secondary plant was created in the basement.

Cooling towers were located on the 11th floor roof. Condenser lines

utilized a laboratory fume hood chase on the exterior wall from the

basement to the roof deck.

Ithaca College - Whalen Building HVAC Evaluation

. HVAC evaluation of the Sony recording studio equipment failures lead

to the recommendations of a separate DX cooling system for the

computer rack room, replacing the carpet with cork flooring, replacing

the ceiling tiles with non- fibrous type and perform all electronic

maintenance repair with the use of cleaning products outside of the

studio.

SUNY ESF - Maintenance Building

. HVAC /exhaust piping/ductwork modifications including PTAC water

source heat pump system



Contact this candidate