Gus A. Hurtado
Education 2002 University of Texas at San Antonio San Antonio,
Texas
(Overall GPA: 3.87/4.00)
Master of Business Administration
1986 Instituto Politecnico Nacional
(National Polytechnic Institute) Mexico City,
Mexico
Bachelor of Science in Architectural Engineering
Professional
experience 1998 - Present Zachry Construction
Corporation San Antonio, Texas
Estimating Coordinator
Working for the Estimating Department at the Corporate
Office, these are my primary responsibilities:
thoroughly evaluate conditions and requirements of bid
plans and specifications, supervise accurate material
take-offs and coordinate cost analyses, communicate
constantly and effectively with other estimators
involved in the projects to assure positive development
of the estimates, consult and apply company's historical
data without overseeing extraordinary issues that may
divert the price from past experiences, visualize
project strategy and generate schedule and overhead
budget based on a detailed study of project
requirements, customer's expectations, and anticipated
project team, and prepare for bid reviews and
presentations for external and internal customers.
Coordinated the estimates of the following projects that
led the company to be the successful bidder:
September-1998, FM 2696 in San Antonio. Contract
amount: $21,350,000.
July-1999, FM 1472 in Laredo. Contract amount:
$3,860,000.
September-1999, IH 410 at US 281 bridge connector in San
Antonio. Contract amount: $8,350,000.
January-2001, Loop 1604 in San Antonio. Contract
amount: $4,443,000.
August-2001, Loop 20 in Laredo. Contract amount:
$18,024,000.
December-2002, US 77 in Harlingen. Contract amount:
$67,994,000.
February-2004, US 281 in Edinburg. Contract amount:
$31,227,000.
March-2004, FM 1926 in Edinburg. Contract amount:
$5,461,000.
May-2004, IH 410 at Zarzamora. Contract amount:
$12,500,000.
August-2004, US 83 in Mercedes. Contract amount:
$97,320,000.
October-2004, FM 1764 in Santa Fe. Contract amount:
$14,618,000.
November-2004, Dallas N. Tollway in Frisco. Contract
amount: $83,973,000.
July-2005, US 77 in San Benito. Contract amount:
$4,061,000.
August-2005, SH 89 in Sinton. Contract amount:
$44,368,000.
September-2005, US 281 in San Antonio. Contract amount:
$83,653,000.
November-2005, IH 35 at Lp 363 in Temple. Contract
amount: $68,418,000.
May-2006, IH 410 Nacogdoches to Beitel Creek in San
Antonio. Contract amount: $116,819,000.
I sustain my contribution to field operations by working
on the resolution of outstanding claims of projects that
I coordinated.
My experience continues to evolve throughout direct
participation in several other large size projects,
Comprehensive Developments Agreements, and Joint
Ventures for both private and public sectors in
different areas of the heavy/highway construction
industry.
1993 - 1998 H. B. Zachry Company
San Antonio, Texas
Project Engineer/Project Controls Manager
Prepared cost projections and cash flow reports, trained
and mentored intern engineering students, as well as new
engineering graduates' entry-level Office Engineers.
Took increasing responsibilities on various highway
construction projects for the Texas Department of
Transportation in San Antonio, such as: expansion of IH
10 West between Wurzbach Road and De Zavala and
expansion of Eckhert Road between Huebner Road and
Highway 16. I worked as Project Manager and was in
charge of the entire operation of the expansion of
Wurzbach Road between Evers Road and Seville Road, and
IH 410 bridge widening at Medina Base Road, Ray Ellison
Road, and Pearsall Road. Represented the company in
Austin, Texas, at a partnering round table organized by
the Texas Department of Transportation in 1997. This
event was a presentation to members of the construction
industry from Great Britain that were interested in
benchmarking proven successful partnering experiences.
The Department of Transportation's office in San Antonio
selected the Eckhert Road project as a model to be
included in this conference.
1990 - 1993 H. B. Zachry Company
San Antonio, Texas
Office Engineer
Worked, as part of the Construction Management Team, at
the following projects: new construction of Eisenhower
Road and Woodlake Parkway for the City of San Antonio,
construction of La Cantera Parkway and miscellaneous
jobs at "Fiesta Texas" theme park for USAA in San
Antonio, US 290 drainage tunnel for the Texas Department
of Transportation in Austin, Texas, drainage and road
improvement at Cherry Street for the city of San
Antonio, pit construction at Covel Gardens Landfill for
Waste Management Incorporated in San Antonio.
Among my job duties, I prepared project progress
reports, controlled time sheets and purchasing,
developed construction schedules, assisted in
coordinating the execution of the projects, elaborated
detailed project status reports and monthly pay
estimates for customers, supervised subcontractor's
work, and processed financial reports for internal upper
management.
1988 - 1990 H. B. Zachry Company
San Antonio, Texas
Estimator I
Worked at the San Antonio Area Heavy Division District
Office. Reviewed drawings, specifications, and other
bid documents.
Assisted Estimating Coordinators in the preparation of
estimates and proposals of projects with contract value
up to $10,000,000. The runway expansion at the San
Antonio International Airport and the Laredo-Colombia
International Bridge, were among the jobs awarded to the
company during that period.
1987 - 1988 JonesKell Architects
San Antonio, Texas
Draftsman
Assisted Project Architects with architectural drafting
and elaboration of models.
Maintained filing system of architectural products and
new construction materials and technology.
1984 - 1987 Construcciones Carter
Mexico City, Mexico
Field Supervisor
Part time job while attending college. The company's
line of work consisted of placement of tile and natural
stone on floors and walls for commercial buildings.
My work consisted of general purchasing, supervision of
project development, drawing revision, and elaboration
of estimates, proposals, and cost breakdowns.
Formal Agtek Strata and Template Programs, 1988
Training Introductory Lotus 123, Safe Handling of Traffic in
Courses Construction and Maintenance Areas, 1989
DOS Hard disk management, Management Development
Program, 1991
Lotus 123 2.3 Intermediate, Quality Management, 1992
Word Perfect 6.0 for Win/Prod, 1993
Windows 3.1 Introduction, Lotus 123 5.0 Advanced, 1995
Primavera 503 Scheduling School, Symposium on Continuous
Improvement, 1995
Policies and Procedures, Coaching vs. Managing,
Understanding Differences, Traffic Safety in
Construction, 1996
Zachry Management Information System, 1997
Hard Dollar Estimating System, Excel Intermediate,
Environmental Issues in Construction, 1998
Win-Win Negotiations, Construction Project Improvement
by CII, 1999
Expedition 202A and 202B, 2000
Concrete Paving Conference, 2002
EPC Training, 2003
Lessons of Leadership, Marine Insurance, Technical
Presentations, Trenching Excavation, Leadership I, 2004
MS Outlook, Conexpo, Leadership II, Oracle Overview,
Methods & Meetings, 2005
Ethics, Smart Board, Leadership III & IV, AGC
Conference, 2006
TXDOT Training, Industrial Hygiene, 2007