KENNETH E. BERGMAN
***** ********* **** **** #** ( Boise, Idaho 83714
208-***-**** ( abkpev@r.postjobfree.com
QUALITY CONTROL / ASSURANCE MANAGER ( FIELD / PROJECT ENGINEER
Results-oriented quality assurance professional specializing in designing
type and frequency of tests/inspections and documenting results.
Specializing in the construction of wind energy projects. Financial
background provides unique perspective in evaluating and solving problems.
Effective communicator with project personnel to achieve all project
deliverables.
KNOWLEDGE-SKILLS-ABILITIES
Construction Quality Regulatory Compliance Project Lifecycle
Control Management
Contract Analysis Contract Administration Audit Techniques
Cost Control & Reduction Payroll/Personnel Industry Best Practices
Process Development Client Relations Planning & Scheduling
Creative Problem Solving Interpreting Technical Fiscal Management
Reports
Author - QC Site Specific Author - QC Inspection Project Communications
Manuals Reports
WIND FARM EXPERIENCE
Project Controls Specialist / Pine Tree Wind Farm, California
Actively monitored
all project controls for 2 construction projects for the Los Angeles
Department of Water & Power, a 230,000-volt transmission line and an 80-
turbine wind farm.
Field Engineer (Foundations) / Quality Control Leader, Champion & Roscoe
Wind Farms, Texas
Roscoe: 209 Mitsubishi towers providing 209 MW capacity. Champion: 55
Siemens towers providing 126.5 MW capacity.
Quality Control / Quality Assurance Manager, Camp Springs, Texas /
Centennial Wind Farms, Oklahoma
Camp Springs: 87 GE towers with 130 MW capacity. Texas/Centennial: Already
sold to Oklahoma Gas & Electricity; no information available
Field Engineer (Electrical), Maple Ridge Phase 2 Wind Farm, New York -
Nominated Project of the Year 2006
Phase 2: 55 Vestas towers with 90.75 MW capacity
Quality Control / Quality Assurance Documentation Control Manager, Horse
Hollow Phases 2 & 3, Texas - Project of the Year 2006 (out of 6 projects
nominated)
Phase 2: 130 Siemens towers with 299 MW capacity. Phase 3: 149 GE towers
with 223.5 MW capacity
Field Engineer, SMUD Wind Farm, California - Nominated Project of the Year
2006
7 prototype foundations for Vestas towers, foundations only
Field Engineer (Electrical), Maple Ridge Phases 1 & 1A Wind Farm, New York
- Project of the Year 2005
Phase 2: 55 Vestas towers with 90.75 MW capacity.
WIND FARM DUTIES & RESPONSIBILITIES
. Reviewed all project documentation and external technical documents for
compliance with established specifications.
. Audited all quality control documentation to ensure proper coverage,
especially prior to payment of monthly estimates.
KENNETH E. BERGMAN ( Page 2 ( abkpev@r.postjobfree.com
Wind Farm Duties & Responsibilities
. Ensured all deliverables remained within contract specifications by
establishing tracking systems for key metrics such as testing,
inspections, and construction quantities.
. Developed site-specific Quality Control Manuals, inspection reports and
job books
. Served as the main point of contact with third party testing
subcontractors' personnel and owners' quality control manager.
. Began revision of corporate quality control manual targeting specific
construction areas for field personnel usage and developing a
"dictionary" of quality control definitions and standard industry
inspection/testing forms.
. Prepared and cleaned-up electrical contractor's reports, and insure
sufficient electrical inventory on site to prevent work stoppages.
. Ensured electrical work complied with specifications, landowner
agreements, and state/local laws.
. Provided subject matter expertise to educate both the contractor and
company owner in wind farm construction, enabling successful completion
of one of the world's largest municipally owned wind farms.
. Prevented significant costs and increased wind farm's life expectancy by
identifying a flaw that would have resulted in unstable foundations.
. Prevented a $400,000 penalty for not completing contractually required
electrical testing before a set date by recommending renegotiation of the
penalty clause based on industry standards for such tests.
. Managed quality on 2 sites 400 miles apart through proactive
communication and developing strong relationships with each site's
construction manager.
PROFESSIONAL EXPERIENCE
IEC, Project Controls Specialist, 2007-2008
DH Blattner & Sons, Field Engineer, 2005-2007
Self-Employed, Accounting Consultant, 2003-2005
Edwards Air Force Base Chaplaincy, Accounting Technician, 2002-2003
Computer Sciences Corporation, Technical Consultant, 2001-2002
Department of Examiners of Public Accounts, Accounts Examiner, 1990-2000
Alabama Department of Transportation, Engineer's Assistant, Prior to 1990
OTHER ENGINEERING/CONSTRUCTION DUTIES & RESPONSIBILITIES
. Performed a broad range of field engineering functions to support state
and federal civil construction projects.
. Surveyed sites and inspected completed civil work, including concrete,
asphalt, dirt work, and striping.
. Established field offices to monitor contractor/subcontractor work,
performed ongoing estimations for expenses and schedule, and ensure
compliance with state and federal specifications.
. Significantly improved strategic relationship with federal highway agency
by closely monitoring construction, finalizing projects quickly, and
paying contractors rapidly.
. Coordinated complex federal construction projects to build an interchange
off I-85, including preliminary exit/entrance ramps and bridge over the
interstate. Effectively tracked codes, funding, and specifications that
shifted depending on where the crew worked.
EDUCATION
Bachelor of Science in Business Administration, Emphasis in Accounting
Auburn University ( Montgomery, Alabama
PROFESSIONAL DEVELOPMENT
Introduction to Construction Management ~ Construction Materials & Methods
Introduction to CAD ~ Construction Administration