Gary D. Boughton, P.E. State of California C *****
Eureka, CA 95501
707-***-**** ***************@*****.***
Professional Experience:
*/**** - ******* ****** **** Engineer, City of Eureka
531 "K" Street, Eureka, CA 95501 707-***-****
Overseeing $20 Million in Development and Redevelopment Projects in the
City of Eureka
. Project Design, Contract Management and Quality Control
. Survey and Mapping
. Extensive Public, Private Land Boundary Analysis
. Property and Easement Descriptions
. Final Mapping
. Engineers Estimates
. Designed Roads, Water, Sanitary Sewer (Gravity and Manifold Pressure),
Storm Drain Systems
. Project Design, Specifications and Plans
11/1981 - 1/1988 Staff Engineer/Surveyor, Omsberg & Company
1864 Myrtle Avenue, Eureka, CA 95501 707-***-****
Researched, surveyed and mapped numerous subdivisions in and around Eureka
for private developers; from tentative map processing, street and utilities
design, boundary analysis, completion of subdivision maps, private and
federal property boundary surveys. Many phased Redevelopment projects I
began as consultant were finished as an employee for the city of Eureka.
Education:
Bachelor of Science in Civil Engineering
Humboldt State University
Continuing Education:
Humboldt State University: Environmental Impact Report Writing, Whole Earth
Engineering; College of the Redwoods: Supervision and Management; US
Department of Forestry: ICS 220 Basic ICS; NIMS/SEMS-Basic Course in
ICS100, ICS 200 and IS 700; Best Practices in Contemporary Performance
Measurement; Legal Topics for Surveyors; FEMA Introduction to Emergency
Management; OES California Standardized Emergency Management System; HCOED
Team Building; Cal/OSHA Work Zone Safety Training; ; UC Berkeley Extension:
Pavement Management Systems, Traffic Calming Strategies That Work.
Publications:
Developed, Designed and Published, the City of Eureka Five-Year Capital
Improvement Program
City of Eureka Design, Specification and Construction Manuals
Projects Addendum:
Bid No. 2010-6 - Palco Marsh Enhancement Plan Phase 1A
Surveyed, Designed, and Inspected, Construction Contract Administration,
Tidal Excavation of Contaminated Soils and Disposal Thereof.
Construction Cost $363,665
Bid No. 2010-17 - Cooper Gulch Recreation Area Handicapped Parking
Surveyed, Designed, Inspected and Administered Contract for the Placement
of Two Handicapped Parking Spaces.
Construction Cost $11,395
Bid No. 2009-08 - Eureka Skate Park
Contract Administration, Design Contract, Staked, Inspected Construction
Contract, and Community Charrettes.
Construction Cost $402,721 (Plus an additional $300,000 in volunteer
efforts)
Bid No. 901-24 - Palco Marsh Enhancement Phase 1
I designed (in 1986), Contract Administration for Inspection and
Construction.
Construction Cost $406,862
Bid No. 2004-06 - 121 west Washington Storm Drain Installation through
private property
Negotiated and secured easement to prevent flooding, Designed, Inspected,
Contact Administration.
Construction Cost $17,319
Bid No. 2003-28 - Disc Golf Course
Administered Volunteers for Installation, Purchased Materials.
Construction Cost $4,361
Bid No. 2002-12 - Second and "F" Street Compass Rose
Negotiation and Contract Administration.
Construction Cost $18,500
Bid No. 2001-1 - Inner Channel Dock and Boardwalk Revitalization Phase 1
RFQ Design Contract Administration for Architect and Structural Engineer
with 14 separate sub-contracts, Property Acquisition, Lot Line Adjustments,
Coastal Development Permit, Construction and Inspection, Contract
Administration.
RFQ Contract $757,170 Construction Contract $7,122,321
Bid No. 890-19 - Waterfront Drive Extension "K" to "L" Streets
Reviewed, Designed, and Administered, Construction Contract.
Construction Cost $233,870
Projects Addendum continued (2):
Bid No. 990-14 - Demolition of Structures 150 West Grant Street
Contract Administration.
Cost $7,759
Bid No. 978-24 - 9th Street Sewer Main Extension
Install New Sewer Main to Un-sewered Parcels. Designed, Administered
Contract.
Construction Cost $28,045
Bid No. 978-03 - Lindale Court Sewer and Storm Drain Storm Damage Repairs.
Construction Contract Administration.
Construction Cost $86,577
Bid No. 967-12 - E Street Embankment and Shoulder Repairs from Storm Damage
Designed, Construction, Inspection and Contract Administration.
Construction Cost $77,662
Bid No. 967-1 - Waterfront Drive Extension Washington to Railroad Ave.
Designed, Contract Administration, Construction Inspection.
Construction Cost $552,877
Bid No. 956-03 - Demolition of Buildings 2306 California Street
Contract Administration.
Cost $7,050
Bid No. 956-1 - Redevelopment of Sidewalks (1996)
Contract Administration for Design and Construction.
Construction Cost $556,275
Bid No. 945-4 - Clara May Berry Park
Designed, Administered Contract, Supervised Construction
Bid No. 934-07 - Broadway and 14th Streets Signalization Improvements
Contract Administration.
Construction Cost $193,356
Bid No. 923-3 - Underground Storage Tank Removal
Inspection and Contract Administration, Contaminated Soils Removal.
Contamination Consultant Payment $3,397 four separate sites $29,000
Bid No. 912-03 - J Street Sewer-Replace failing sewer and patch paving
Contract Administration.
Construction Cost $746,696
Projects Addendum continued (3):
Bid No. 901-14 - L Street Storm Drain Improvements/Installation of Storm
Drains
Contract Administration.
Construction Cost $175,078
Bid No. 901-7 - Del Norte Street Public Fishing Pier
Contract Administration.
Construction Cost $636,011
Bid No. 890-26 - Sequoia Park Zoo Aviary Improvements
Contract Administration.
Construction Cost $25,735
Bid No. 889-17 - Redevelopment Sidewalks in Downtown Old Town Eureka (1988)
Contract Administration.
Construction Cost $103,096
Bid No. 878-38 - 4th Street Water Sanitary Sewer Reconstruction
Contract Administration.
Construction Cost $889,401
Bid No. 878-37 Henderson Center F Street Parking Lot
Property Acquisition, Survey, Design, Inspection.
Construction Cost $37,315
Bid No. 878-35 - OCS-Project B Parking Lot
Contract Administration.
Construction Cost $106,295
Bid No. 878-33 - Fire Hydrant and Water Main Reconstruction (1986)
Contract Administration, Supervising Inspector.
Construction Cost $279,271
Bid No. 878-26 - Handicapped Access to City Hall
Inspection, Negotiating Contracts and Change Orders, Payments to
Contractors.
Construction Cost $14,915
Bid No. 878-19 - Dock B Reconstruction after fire
Inspection
Construction Cost $370,116
Bid No. 878-10 - F Street and Cooper Gulch Sewer Improvements
Inspection
Construction Cost $442,749
Projects Addendum continued (4):
Bid No. 856-23 - Elk Paddock Renovation
Hazardous Tree Removal, Surveyed, Designed, Inspected.
Construction Cost $132,346
Contract No. 01-199484 (1984)
Myrtle and West Widening Phase 2 and 3
Inspected
Construction Cost $329,000
Bid No. 845-23 - "C" Street Reconstruction
Surveyed, Designed, Inspected for Storm Drain, Water, Sewer, Sidewalks,
Street Paving and Street Lights.
Construction Cost $528,700
Bid No. 812-4 - Waterfront Drive Phase II
Surveyed, Designed, Inspected
Construction Cost $311,984
Bid No. 801-29 - Waterfront Drive Phase I "C" Street to Commercial
Surveyed, Designed New Roadway including Water, Sewer, Storm Drain, Street,
Sidewalks, Streetlights and a Railroad Crossing; 25,000 cubic feet of
Excavation and Backfill.
Construction Cost $757,058
Bid No. 790-2 - First and "C" Streets Parking Lot
Demolition of a building, Clearing and Grub, Storm Drain, Electrical,
Irrigation, Concrete and Paving for Parking.
Surveyed, Designed and Inspected.
Construction Cost $138,009
Bid No. 789-26 - Redevelopment Old Town Sidewalks (1978)
Surveyed, Designed, Inspected and Contract Administration.
Construction Cost $58,194
Bid No. 790-11 - First Street Reconstruction
Surveyed, Designed, Inspected Construction, for water, sewer, storm drain
and paving.
Construction Cost $497,717
Bid No. 778-32 - Sixth and "M" Parking Lot
Cleared, demolition of vacant lot and construction of parking lot.
Surveyed, Designed, Inspected and Contract Administration.
Construction Cost $62,687[pic]