Gary D. Boughton, P.E. State of California C *****

*** * **

Eureka, CA 95501

707-***-**** ***************@*****.***

Professional Experience:

*/**** - ******* ****** **** Engineer, City of Eureka

531 "K" Street, Eureka, CA 95501 707-***-****

Overseeing $20 Million in Development and Redevelopment Projects in the

City of Eureka

. Project Design, Contract Management and Quality Control

. Survey and Mapping

. Extensive Public, Private Land Boundary Analysis

. Property and Easement Descriptions

. Final Mapping

. Engineers Estimates

. Designed Roads, Water, Sanitary Sewer (Gravity and Manifold Pressure),

Storm Drain Systems

. Project Design, Specifications and Plans

11/1981 - 1/1988 Staff Engineer/Surveyor, Omsberg & Company

1864 Myrtle Avenue, Eureka, CA 95501 707-***-****

Researched, surveyed and mapped numerous subdivisions in and around Eureka

for private developers; from tentative map processing, street and utilities

design, boundary analysis, completion of subdivision maps, private and

federal property boundary surveys. Many phased Redevelopment projects I

began as consultant were finished as an employee for the city of Eureka.

Education:

Bachelor of Science in Civil Engineering

Humboldt State University

Continuing Education:

Humboldt State University: Environmental Impact Report Writing, Whole Earth

Engineering; College of the Redwoods: Supervision and Management; US

Department of Forestry: ICS 220 Basic ICS; NIMS/SEMS-Basic Course in

ICS100, ICS 200 and IS 700; Best Practices in Contemporary Performance

Measurement; Legal Topics for Surveyors; FEMA Introduction to Emergency

Management; OES California Standardized Emergency Management System; HCOED

Team Building; Cal/OSHA Work Zone Safety Training; ; UC Berkeley Extension:

Pavement Management Systems, Traffic Calming Strategies That Work.

Publications:

Developed, Designed and Published, the City of Eureka Five-Year Capital

Improvement Program

City of Eureka Design, Specification and Construction Manuals

Projects Addendum:

Bid No. 2010-6 - Palco Marsh Enhancement Plan Phase 1A

Surveyed, Designed, and Inspected, Construction Contract Administration,

Tidal Excavation of Contaminated Soils and Disposal Thereof.

Construction Cost $363,665

Bid No. 2010-17 - Cooper Gulch Recreation Area Handicapped Parking

Surveyed, Designed, Inspected and Administered Contract for the Placement

of Two Handicapped Parking Spaces.

Construction Cost $11,395

Bid No. 2009-08 - Eureka Skate Park

Contract Administration, Design Contract, Staked, Inspected Construction

Contract, and Community Charrettes.

Construction Cost $402,721 (Plus an additional $300,000 in volunteer

efforts)

Bid No. 901-24 - Palco Marsh Enhancement Phase 1

I designed (in 1986), Contract Administration for Inspection and

Construction.

Construction Cost $406,862

Bid No. 2004-06 - 121 west Washington Storm Drain Installation through

private property

Negotiated and secured easement to prevent flooding, Designed, Inspected,

Contact Administration.

Construction Cost $17,319

Bid No. 2003-28 - Disc Golf Course

Administered Volunteers for Installation, Purchased Materials.

Construction Cost $4,361

Bid No. 2002-12 - Second and "F" Street Compass Rose

Negotiation and Contract Administration.

Construction Cost $18,500

Bid No. 2001-1 - Inner Channel Dock and Boardwalk Revitalization Phase 1

RFQ Design Contract Administration for Architect and Structural Engineer

with 14 separate sub-contracts, Property Acquisition, Lot Line Adjustments,

Coastal Development Permit, Construction and Inspection, Contract

Administration.

RFQ Contract $757,170 Construction Contract $7,122,321

Bid No. 890-19 - Waterfront Drive Extension "K" to "L" Streets

Reviewed, Designed, and Administered, Construction Contract.

Construction Cost $233,870

Projects Addendum continued (2):

Bid No. 990-14 - Demolition of Structures 150 West Grant Street

Contract Administration.

Cost $7,759

Bid No. 978-24 - 9th Street Sewer Main Extension

Install New Sewer Main to Un-sewered Parcels. Designed, Administered

Contract.

Construction Cost $28,045

Bid No. 978-03 - Lindale Court Sewer and Storm Drain Storm Damage Repairs.

Construction Contract Administration.

Construction Cost $86,577

Bid No. 967-12 - E Street Embankment and Shoulder Repairs from Storm Damage

Designed, Construction, Inspection and Contract Administration.

Construction Cost $77,662

Bid No. 967-1 - Waterfront Drive Extension Washington to Railroad Ave.

Designed, Contract Administration, Construction Inspection.

Construction Cost $552,877

Bid No. 956-03 - Demolition of Buildings 2306 California Street

Contract Administration.

Cost $7,050

Bid No. 956-1 - Redevelopment of Sidewalks (1996)

Contract Administration for Design and Construction.

Construction Cost $556,275

Bid No. 945-4 - Clara May Berry Park

Designed, Administered Contract, Supervised Construction

Bid No. 934-07 - Broadway and 14th Streets Signalization Improvements

Contract Administration.

Construction Cost $193,356

Bid No. 923-3 - Underground Storage Tank Removal

Inspection and Contract Administration, Contaminated Soils Removal.

Contamination Consultant Payment $3,397 four separate sites $29,000

Bid No. 912-03 - J Street Sewer-Replace failing sewer and patch paving

Contract Administration.

Construction Cost $746,696

Projects Addendum continued (3):

Bid No. 901-14 - L Street Storm Drain Improvements/Installation of Storm

Drains

Contract Administration.

Construction Cost $175,078

Bid No. 901-7 - Del Norte Street Public Fishing Pier

Contract Administration.

Construction Cost $636,011

Bid No. 890-26 - Sequoia Park Zoo Aviary Improvements

Contract Administration.

Construction Cost $25,735

Bid No. 889-17 - Redevelopment Sidewalks in Downtown Old Town Eureka (1988)

Contract Administration.

Construction Cost $103,096

Bid No. 878-38 - 4th Street Water Sanitary Sewer Reconstruction

Contract Administration.

Construction Cost $889,401

Bid No. 878-37 Henderson Center F Street Parking Lot

Property Acquisition, Survey, Design, Inspection.

Construction Cost $37,315

Bid No. 878-35 - OCS-Project B Parking Lot

Contract Administration.

Construction Cost $106,295

Bid No. 878-33 - Fire Hydrant and Water Main Reconstruction (1986)

Contract Administration, Supervising Inspector.

Construction Cost $279,271

Bid No. 878-26 - Handicapped Access to City Hall

Inspection, Negotiating Contracts and Change Orders, Payments to

Contractors.

Construction Cost $14,915

Bid No. 878-19 - Dock B Reconstruction after fire

Inspection

Construction Cost $370,116

Bid No. 878-10 - F Street and Cooper Gulch Sewer Improvements

Inspection

Construction Cost $442,749

Projects Addendum continued (4):

Bid No. 856-23 - Elk Paddock Renovation

Hazardous Tree Removal, Surveyed, Designed, Inspected.

Construction Cost $132,346

Contract No. 01-199484 (1984)

Myrtle and West Widening Phase 2 and 3

Inspected

Construction Cost $329,000

Bid No. 845-23 - "C" Street Reconstruction

Surveyed, Designed, Inspected for Storm Drain, Water, Sewer, Sidewalks,

Street Paving and Street Lights.

Construction Cost $528,700

Bid No. 812-4 - Waterfront Drive Phase II

Surveyed, Designed, Inspected

Construction Cost $311,984

Bid No. 801-29 - Waterfront Drive Phase I "C" Street to Commercial

Surveyed, Designed New Roadway including Water, Sewer, Storm Drain, Street,

Sidewalks, Streetlights and a Railroad Crossing; 25,000 cubic feet of

Excavation and Backfill.

Construction Cost $757,058

Bid No. 790-2 - First and "C" Streets Parking Lot

Demolition of a building, Clearing and Grub, Storm Drain, Electrical,

Irrigation, Concrete and Paving for Parking.

Surveyed, Designed and Inspected.

Construction Cost $138,009

Bid No. 789-26 - Redevelopment Old Town Sidewalks (1978)

Surveyed, Designed, Inspected and Contract Administration.

Construction Cost $58,194

Bid No. 790-11 - First Street Reconstruction

Surveyed, Designed, Inspected Construction, for water, sewer, storm drain

and paving.

Construction Cost $497,717

Bid No. 778-32 - Sixth and "M" Parking Lot

Cleared, demolition of vacant lot and construction of parking lot.

Surveyed, Designed, Inspected and Contract Administration.

Construction Cost $62,687[pic]