Post Job Free

Resume

Sign in

Electrical project manager 28 years Exp in gas & oil field

Location:
Madurai, TN, 625010, India
Posted:
January 07, 2013

Contact this candidate

Resume:

B.Venkatesan

Contact: +919****-***** / E-Mail: abknnp@r.postjobfree.com

Seeking senior managerial level assignments in Project Management /

Erection & Commissioning / Operations & Maintenance with a leading

organization of repute in Electrical /Power sector preferably in Gulf /

India

Profile Summary

. 28 years of commendable success in Project Management, Plant Operations &

Maintenance, Erection, Testing & Commissioning, Site and Resource

Management in Construction, Contracting, Petro chemicals, Gas & Oil

fields.

. Proficient in handling the detailed engineering, erection, testing &

commissioning activities & maintenance of machinery, implementing process

enhancement and quality control techniques

. Expertise in implementing plans & annual turnaround with focus on optimum

utilization of manpower and materials

. Adept in handling process improvements and quality related activities

involving resource planning, in-process inspection and co-ordination with

internal departments

. A thorough professional capable of imparting training to team members so

as to ensure safety and quality norms

. An enterprising leader with proven dexterity in directing personnel

towards accomplishment of a common goal

(Refer to Annexure for Project Details)

Core Competencies

Process Enhancement

. Managing various process improvement activities through various quality

management systems

. Enhancing production process operations, optimizing resource utilization

and escalating operational efficiencies

Erection, Testing & Commissioning

. Anchoring planning, erection, testing & commissioning, ensuring effective

resource utilization to maximize output

. Overseeing installation & commissioning and conducting inspections to

ensure operational effectiveness of utilities

People Management

. Monitoring the performance of team members to ensure efficiency in the

process operations and meeting of targets

. Creating and sustaining a dynamic environment that fosters development

opportunities amongst team members

Operations & Maintenance

. Effectuating preventive based maintenance schedules to increase machine

uptime and equipment reliability

. Identifying areas of obstruction and taking steps to rectify equipment

through application of troubleshooting tools

Organizational Experience

Sep'10 - Dec' 12 with PLQ Contracting LLC, Dubai as Senior Project Manager

Key Result Areas:

. Spearheading the estimating activities and providing timely / accurate

cost information on which to base bids for prospective projects

. Accountable for compiling and analyzing the current data on equipment,

labor, supplies, and related factors/conditions, review of specifications

. Carrying out the review scope definition and prepare estimates of costs

and lead times

. Preparing the budget and schedule in alignment with the scope as well as

tracking budget and schedule with the help of project control personnel

. Ascertaining the availability of appropriate resources to execute the

project work and manage the project personnel

Previous Experience

Jan'10-Sep'10 with Cairn Energy India Pvt. Ltd., Barmer (Rajasthan), India

as Lead Engineer

Jun'09-Jan'10 with Enjazcom Trading & Contracting Co., Saudi Arabia as

Project Manager

Jul'08-Jun'09 with Tecnimont ICB Qatar WLL, Doha, Qatar as QA/QC

(Construction) Manager (E& I)

Dec'06-Jun'08 with Gulf Petro Chemical Services & Trading LLC, Muscat, Oman

& Dubai as QA/QC & Electrical Engineer (E&I)

Jul'03-Nov'06 with Ali Haider Al Yami & Sons, Saudi Arabia as Manager

(Electrical)

Jul'01-May'03 with Madura Cable Net (P) Ltd., Madurai, India as Technical

Manager (Project)

Jun'95-May'01 with Saihati Industrial Services, (Tamimi Group of Company),

Jeddah, Dammam, Saudi Arabia as Electrical Engineer (Project)

Nov'92-Apr'95 with Sajjan Textiles Mills (Group of Madura Coats Ltd.),

Nilakottai, India as Electrical Engineer (Plant- Spinning and Weaving Mills

Unit)

Nov'88-Oct'92 with United Industrial Engineers, Madurai, India as Junior

Engineer Elec. (Plant- Spring Plate Manufacturing Plant (Automobile))

Apr'87-Sep'88 with International Airports Authority of India, Madras

Airport Project, Chennai, India as Technical Assistant (Project)

Jan'86-Mar'87 with Best & Crompton Engineering, Madurai, India as Design

Engineer (Project)

Apr'83-Jan'86 with Soundaram Electricals, Madurai, India as Electrical

Supervisor

Academic Details

. MBA (Marketing) from Kamarajar University, Madurai, India in 2006

. BE (Electrical & Electronics) from Kamarajar University, Madurai, India

in 1988

. DEE(Diploma in Electrical & Electronics Engineering) from Tamil Nadu

Polytechnic, Madurai, India in 1982

Others:

. Diploma in AutoCAD Professional (DAP)

. Diploma in Computer Hardware (DCH)

. Quality Control Lead Internal Auditor in ISO 9001-2000 by IRCA ICS

Technologies, United Kingdom

Knowledge Preview

. The wealth of expertise entails:

o Project Management & Commissioning

o Construction Engineering

o Maintenance Operations

o Under Ground & Over Head Line Cabling Work

o Quality Assurance & Control

o Electrical & Instrumentation Work

Personal Details

Date of Birth: 19th March 1964

Address : SFA3, Rasi Towers, Nandhini Street, Bye Pass

Road, Madurai - 625010, Tamil Nadu, India

Nationality: Indian

Passport Details: E6728089 (Issued at Trichirapalli. Valid

up to 16/09/2013)

Driving License Details: Driving License Issued at India, Oman, Qatar,

UAE-Dubai & Saudi Arabia

Visa Details: Resident

Marital Status: Married

Number of Dependents: Two

Languages Known: English, Tamil and Hindi

ANNEXURE

PLQ Contracting, LLC, Dubai

Projects: These are as followed:

. NCC Abudhabi-Dewa

. CCC Gmbh

. DANWAY

. Al STOM/ AREVA

. Al Futaim in Festivel City

Period: Sep'10-Dec'12

Role: Senior Project Manager

Accountabilities: Deftly managed the following responsibilities:

. Experienced in planning, progress monitoring,

forecasting and reporting of multi-discipline projects

as well as commercial, contractual and administrative

aspects of multi-discipline projects and engineering

activities

. Installation of 132 KV GIS S/E for SF6 switch gear type

EG 123-145 KV erected at CCC GmbH Dewa project

. 132 KV, 1200 Sqmm cable Cu cable laying in 3 SS, ADCO-

ASAB oil field developments project

. 132 KV Power Cable laying and testing consist of trench

laying and trench excavation & back filling, through

erection, road crossing by HDD & open cut method

. Pre-commissioning and testing works carried out

. 132 KV Cable installation and Supports at Al Barsha Site

. Actively support a working culture based on respect for

health, safety and environmental issues and maintenance

of a high level of asset integrity

. Manage the scoping; assure definition and delivery of

assigned topside projects on time, within budget and to

the agreed functionality

. Accountable for the technical content of the assigned

topside projects

. Challenge solutions and requirements to obtain the

optimal technical and economic solution

. Be actively involved in the technical execution of

assigned topside project work to ensure compliance with

service, maintenance and project requirements

. Design and manage allocated projects so that it can be

readily executed within the safe operating practices of

the installation

. Work with relevant interfaces to ensure that changes to

activities are identified in a timely manner and that

consequences are mitigated and reflected in an updated

. Manage QA/QC systems are used to assure project quality

and supplier quality plans

. Build effective working relationships with other

departments

. Support good, open communication within the projects

engineering department, promoting a culture of

involvement and participation and adherence to values

. Pivotal role in erection & commissioning of electrical

equipments, pumps and HVAC System

. Erection, commissioning and testing, of 33 KV Panel, 11

KV Panel & 6.6 KV Panel Boards in the substations

Cairn Energy India Pty Ltd., Barmer, Rajasthan

Project: Mangala Oil Project, Rajasthan

Period: Jan'10-Sep'10

Role: Lead Engineer

Accountabilities: Deftly managed the following responsibilities:

. Erection of equipments such as 25 MVA Transformer with

PMCC units and commissioning of well pad plant Projects

. Pivotal role in erection & commissioning of electrical

equipments, pumps and HVAC System

. Erection, commissioning and the testing of 33 KV Panel,

11 KV Panel & 6.6 KV Panel Boards in substations

. Deft in handling project activities entailing system

readiness for construction and commissioning,

mobilization of supervisors and technicians to allow

continuity of works and to comply with programmed

deadlines

. Total 24 well Pads 33/11 KV, 11/6.6 KV Transformers

. Heat tracing transformers, heat tracing systems, UPS &

AC systems erected & commissioned

. Attend site meeting with subcontractors and main

contractors to meets the requirements and ensure the

commissioned project to design requirements

. EDG sets 725 KVA, 500 KVA & 320 KVA erected and

synchronized with PMCC Panel in Sub stations for

emergency power systems. Synchronization checks between

DG and STG incomer carried out

. Steam Power Turbine Generator 9000 KW unit Water Pumps,

Steam Boiler and Control Panel Board erection and

Commissioned

. Technical responsible from the electrical specification

definition to the order

. Responsible for the engineering interface management and

Engineering milestones respect

. In-charge to manage the project interfaces between

internal departments, off-shore site and the suppliers

. Electrical and Instrument experience

. Primary experience to be Instrument

. Within the Instrument discipline good knowledge of field

instrument equipment

. Fire & gas, emergency shutdown systems and process

control systems

. Knowledge of IEC-61508 & IEC 61511 with respect to the

overall safety life-cycle and functional safety

management

. Experience in handling of electrical and instrument

related projects

Enjazcom Trading & Contracting Co., Saudi Arabia as

Project:

Period: Jun'09-Jan'10

Role: Project Manager

Accountabilities: Deftly managed the following responsibilities:

. Reviewed drawing, specifications to ensure Project

ability of Erection of equipments and HVAC systems in

Petrochemical and gas plant Projects

. Ensured completeness of drawings, specifications and

material take -off sheets and prepare scope of work,

bill of quantities and project cost estimate.

. Played a pivotal role in Erection and commissioning of

Electrical equipments, Pumps and HVAC System.

. Effectively controlled and maintained the necessary

standards in respect of all activities related to

erection, commissioning and testing, Piping and

equipments

. Handled project activities entailing system readiness

for construction and commissioning, mobilization of

supervisors and technicians to allow continuity of works

and to comply with programmed deadlines.

. Planned and allocated resources to carry out the

successful commissioning of all projects and carryout

feasibility studies for projects to evaluate and

determine requirement.

. Participated in the preparation of conceptual design for

maintenance projects together with economic and

technical justifications.

. Attended site meeting with subcontractors and main

contractors to meets the requirements and ensure the

commissioned project to design requirement

Tecnimont ICB Qatar, WLL, Qatar

Project: IOCL - Naphtha Cracker Plant- Panipat India,

Qatar Chemicals- Q Chem. II -

Tecnimont and Daewoo Project

Role: QA / QC (Construction) Manager (E& I)

Period: Jul'08-Jun'09

Accountabilities: Deftly managed the following responsibilities:

. Review of specifications, drawing design details for

commissioning of Electrical & Instrumentation Units

. Efficiently handled on site problem solving, attend site

meeting with subcontractors and main contractors, liaise

with consultants, compile test report to the

satisfaction of the client and ensure commissioned

project meets design requirements and is acceptable to

all parties

. Efficiently audit the design drawing and specification

in order to ensure that the requirements for pre-

commissioning are incorporated into the installation and

prepare a method statement for each project

. Effectively control and maintain the necessary standards

in respect of testing instruments

. Instigate a professional approach to the commissioning

of project from order stage through to completion of

work

. Efficiently audit the design drawing and specification

in order to ensure that the requirements for pre-

commissioning are incorporated into the installation and

prepare a method statement for each project

. Dealing with all Client /vendors & recommend how to

improve the Project/product Quality as per required

Standard

. Quality Documents, Procedures and method statements

prepared & implemented

. Planning & Implementation of day-to-day activities of

the gathering station, booster stations, water injection

well, gas injection well, wellhead equipments and

Utilities

. Scope of project reviewing, design verification at site,

received materials inspection before executing the

projects

. Executing the modification in Gathering stations, and

attending emergency works in plant

. Carrying out all Inspection and Test requirements of the

contract at all stages

. As per the QCP and contract requirements

. Notifying the non-conformances identified during site

inspection and recommending corrective measures to

Electrical Supervisor

. Compiling and maintaining pertinent records of

inspection and tests till the end of contract /job order

or for a retention period contractually agreed

. Preparation of Preventive maintenance schedule, Shutdown

Planning and follow up of materials indenting and

inspection of the received material

. Training the site Technician on Maintenance Craft

Procedure (MCP) & Quality Control plans

. Shut down planning which includes indenting materials,

arranging contractors and co-ordination with other

departments

. Preparation of Work orders and Job orders for Sub-

contractors

Gulf Petro Chemical Services & Trading LLC, Muscat- Oman & Dubai

Project: These are as followed:

. Fahud- Yibal-Haban Field Gas plant using 33KV Power

Supply

. Gas Gathering Plant (GGP) Power plant 350 MW Yibal, Oman

PDO Project

. Oman Gas Company Gas compression Plant, OGC Fahud

Project

. Dewa DFO Pipe line and Al Weer Power Project in Dubai

Role: QA/QC & Electrical Engineer (E&I)

Period: Dec'06-Jun'08

Accountabilities: Deftly managed the following responsibilities:

. Demonstrated excellence in managing a gamut of

operations encompassing data collection & ensuring

adequate protection of equipments at all times and

developing further procedures

. Preparing method statement for all Over head line and

Underground cabling systems

. Taking stringent quality measures and monitored

operation, standard maintenance and metrics such as MTBF

(Mean Time Between Failures) and MTTR (Mean Time To

Repair)

. Exhibited stupendous performance in implementing

preventive maintenance schedule as per the tasks for

streamlining purpose

. Effectively used the existing manpower to reduce cost

and avoiding recruiting new people

. Effectively implemented the testing, installation and

commissioning of mechanical / electrical

/instrumentation HVAC equipments as per drawings

. Preparations of Quality control procedures and documents

. Implementation of SHELL standards and PDO specifications

. Preparation of Test Packs and as built documents

. 33 KV OHL line 75 Km erections, Testing and

commissioning assistance

. Scheduling and execution the drilling stay concreting

pole dressing, pole erection and stringing activities

. Transformers, Auto re closers And RTU Units in 4 RMS

Units erection & Implementation

. FOC cable 150 KM laying, Inspection, testing and

commissioning

. Design and erection of Cathodic Protection systems 150

Nos erected in Gas Pipe lines

. Solar Turbine compressor plant erection and termination

from Power plant

. 6.6 MVA Transformer Erection, Cable laying and Execution

Job

. RMU Unit 4 Nos Installed and commissioning for the Power

station

. FOC cable Laying, splicing and commissioning work

. Familiar with Shell PDO Specification / DEP's /

International Standards IEC, NEC, NEMA applicable for

the contract

. Liaison with Senior QA Engineer whenever required on

matters related to Qualities

Ali Haider Al Yami & Sons, Saudi Arabia

Project: These are as followed:

. Saudi Electricity Company (SEC), Al-Khobar, Dammam & Al-

Hasa

. Saudi Aramco Dammam, Underground Cable System in Power

Plant (Above 750 MW)

Role: Manager (Electrical)

Period: Jul'03-Nov'06

Accountabilities: Deftly managed the following responsibilities:

. Executed several Electricity Power plant projects with

voltages above 750 MW

. Underground cable laying, transformers, RMU Units

erection and implemented

. Preparations of Quality control documents as per ANSI

specification

. Preparations of test packs for testing and commissioning

works

. Effectively planned, scheduled for preventive and

predictive maintenance of Equipment (Pumps, Diesel

Engines, Generators, etc.) and HVAC System

. Preparations of the 132 KV overhead line projects

specifications, base design and engineering details

. Preparation of schedule & erected up to 400 sq mm cu,

cable laying, termination, minipillars and ring main

unit erection

Madura Cable Net (P) Ltd., Madurai, India

Project: Internet Service Provider (ISP) Project170 Km over

Head Line Project

Role: Technical Manager (Project)

Period: Jul'01-May'03

Accountabilities: Deftly managed the following responsibilities:

. Preparation of VPN network 4 nodes connected by FOC

cable connectivity

. Private telecommunications and Internet service provided

to the customers

. Execute connectivity and commissioning

. Monitor network and server activity and service provider

connectivity wizard

. Uplink and down link DVB connectivity monitor and

servicing

Saihati Industrial Services (Tamimi Group of Company), Jeddah, Dammam -

Saudi Arabia

Project: These are as followed:

. Jeddah - Yanbu 132 KV OHL project With 350 MW Power

Plant

. Al- Wedyan National Food Company - EPC- Contract

Role: Electrical Engineer (Project)

Period: Jun'95-May'01

Accountabilities: Deftly managed the following responsibilities:

. Primary responsibilities include design and development

of food company projects from initial to final

production

. Responsible for initial client consultation ideation

stage, through to design implementation, site

optimization and final execute programming

. Quality control documents and test packs preparation

. Inspection of electrical work as per approved Aramco

standards and ANSI spec

. 132 KV OHL project tower erection work implementation in

Jeddah- Yanbu Project

. At Food company project, all PLC control systems,

transformers, gen sets, equipment related food process

erected, establish connectivity, tested and commissioned

. Tin can manufactured plant welding machine, slitter m/c,

lid m/c, and filler m/.c

. Pneumatic control systems, overhead conveyor,

photoelectric sensors, and optical switch installation

and commissioned

. Managed all aspects of design and production of projects

& communication with clients

Sajjan Textiles Mills (Group of Madura Coats Ltd.), Nilakottai

Plant: Spinning and Weaving Mills Unit

Period: Nov'92-Apr'95

Accountabilities:

. Responsible for operation and maintenance of all

spinning & weaving Units in Electrical equipments

. Involved in erection & power supply connection of New

RUTI - C weaving units.

. Implemented AHU & Humidification unit servicing and

maintenance.

. Managed servicing and re-fixing of Pneumatic units,

magnetic sensors, limit switches.

. Conducted daily, weekly and monthly periodical

maintenance schedules.

. All sizing units, drier units, dying unit's equipments

erected and serviced

United Industrial Engineers, Madurai

Plant: Spring Plate manufacturing Plant - Automobile

Period: Nov'88-Oct'92

Accountabilities:

. Managed servicing and maintenance of all hydraulic

systems such as slitter m/c, cutting m/c, 10 Ton power

press and hydraulic press.

. Involved in installation of electrical equipments and

terminations with main panel board.

. Arranged all mechanical and electrical equipments

maintenance periodically.

. Responsible for programming and operations of

electronically controlled PC System in Hardening Furnace

and tempering furnace

International Airports Authority of India, Madras Airport Project, Chennai,

India

Project: New International Airport (IAAI), Chennai. India

Period: Apr'87-Sep'88

Role: Technical Assistant (Project)

Accountabilities: Deftly managed the following responsibilities:

. Preparation of Tender documents and drawings

. Design & erection of CCTV camera systems, surveillance

equipments & intruder Alarm systems

. Design and preparation of Fire fighting systems, gas

detectors, heat detectors

. Automatic fire water pumps and related safety systems

. Design of substations, load calculations implemented

Best & Crompton Engineering, Madurai, India

Project: TVS Chakra Tires, Shankar Cement Factory

Role: Design Engineer (Project)

Period: Jan'86-Mar'87

Accountabilities: Deftly managed the following responsibilities:

. Design of power plant drawings

. Material design and erection of equipments planned

. Design and implementation of substation & transformer

erection

. HT & LT electrification layout preparation and planned

. Load calculations of industry and commercial buildings

designed

Soundaram Electricals, Madurai, India

Role: Electrical Engineer

Period: 1983-1986

Accountabilities: Deftly managed the following responsibilities:

. Servicing and maintenance of HV motors and gen sets upto

1000 KVA

. Erection of LV Transformer planned

. Lighting Pole electrification layout preparation and

erection

. All kinds of commercial & Residential buildings Load

details designed

[pic][pic][pic][pic]



Contact this candidate