Accomplishments

Project Manager for design and installation of one million dollar contained belt

conveyor. Brought project in on budget and 25% reduction in schedule.

Project Manager for design and installation of exhaust gas system to eliminate

safety hazards. Developed innovative approach to increase efficiency of

exhaust gas system by 10% without adding to project cost.

Managed Maintenance Department with zero lost time injuries for three

consecutive years. Prior year had 2 lost time injuries.

Project Manager for design and installation of High Grade Sample Preparation

Process Line. Designed vibratory feeder inlet hopper adjustment that

increased the vibratory feeder usage rate by 75%.

Project Manager for refurbishing and installation of three 10,000 SCFM Dust

Control Baghouses. Redesigned mounting foundations for baghouses which

decreased production cleanout times by 25%.

Designed and fabricated metal expansion joints per national and international

specification for a large customer base including the United States Navy.

Designed, fabricated, and shock tested expansion joints for United States

Navy with a 5% reduction in schedule.

Project Engineer for a DOE facility to perform environmental and safety upgrades

for an underground High Level Waste Tank Farm. Completed design review

process with 25% reduction in scheduled time.

Provided engineering support and procedure preparation for overhaul of nuclear

submarines for the United States Navy.

1

Previously held various security clearances with the Department of Defense, the

Department of Energy, and the Nuclear Regulatory Commission.

2

Professional Experience

Horsehead Corporation, Plant Engineer, 2008 to 2010

Project Management for capital projects and all major maintenance work.

Engineering oversight on all maintenance work performed.

Design of plant equipment modifications and repairs.

Specification of equipment repair parts, new equipment, and on site repair

materials.

Preparation of design drawings and specification for projects and maintenance

work.

Types of equipment overseen include: belt conveyors, screw conveyors, bucket

elevators, rotary kilns, vibratory feeders, cranes, dust control baghouses, and

pneumatic transfer systems.

Heraeus Metal Processing, Inc., Engineering and Maintenance Manager, 2005 to

2008

Project management for capital projects.

Manager for maintenance department.

Trouble shooting as maintenance engineer for all plant equipment including

furnaces, dust control baghouses, pollution control systems, waste water systems,

ball mills, blenders, and material sampling systems.

Implemented a computerized maintenance system including preventative

maintenance identification.

Specification and procurement of new equipment, repair parts, and on site repair

materials.

Preparation of design drawings and specifications for capital projects and

maintenance work.

Senior Flexonics Pathway, Applications/Design Engineer, 1997 to 2005

3

Design and fabrication of metal expansion joints and associated hardware per the

Expansion Joint Manufacturer’s Association Manual, ASME B31.3, ASME B&PV

Sections VIII and Section IX, and customer specification.

Provided design input for quotation.

Provided production drawings, material specification, and production problem

resolution.

Provided tooling drawings, tooling material specification, and repair oversight for

plant equipment.

Industrial Construction, Inc., Quality Assurance Manager/Project Engineer, 1995

to 1996

• Provided document control, weld map preparation and control, direct supervision of

inspection personnel, material control, and a quality assurance functions.

• Provide project engineering input to piping and structural problem resolutions,

drawing preparation, interpretation of drawings and specifications, change order

preparation, and material take offs.

Idaho National Engineering Laboratory, Project Engineer, 1992 to 1995

Design reviews and input for piping and components per ANSI B31.3, including

remotely maintainable ball valves.

Provided technical support for project mechanical installation of the project.

Interfaced between construction contractor and plant operations department and

regulatory departments.

Nuclear Fuel Services, Maintenance Engineer, 1989 to 1991

Implemented and operated the plant preventative maintenance program.

Diagnosed of equipment malfunctions and failures.

Determined the required warehouse stock items for the maintenance department.

Provided written repair instructions.

Charleston Naval Shipyard, Nuclear Engineer, 1986 to 1989

4

Prepared detailed work procedures based upon technical manuals, which included

quality assurance controls and radiological control actions.

Ordered required materials to perform work procedures.

Provided engineering overhaul support for Steam Generators, Standard Navy

Globe Valves, and the associated piping and support systems.

Education

Bachelor of Science in Mechanical Engineering from the University of Tennessee,

Knoxville, TN

Member of TAU BETA SIGMA, Engineering Honor Society during college.

Proficient in the use of Word, Excel, and Autocad.