Post Job Free
Sign in

Manager Manufacturing

Location:
Morrisville, PA, 19067
Posted:
August 19, 2010

Contact this candidate

Resume:

Robert M. Conte Home

215-***-****

*** ****** **** ***** ****** (908) 930-

1769

Yardley, PA 19067

abk86v@r.postjobfree.com

OPERATIONS EXECUTIVE

. P&L

. International Operations

. CNC Machining

. Lean Manufacturing

. Distribution & Logistics

. Sheet Metal Fabrication

. Engineered Products

. Automation

. Assembly & Test

.

. Improved customer fill rates from less than 70% to 98%+, while

reducing inventories by 20%, cutting lead times by 67%, and shrinking

both direct and indirect labor pools.

. Reduced set up times by 67% and doubled first piece yield, improving

throughput by 50%.

. Expert at leading edge manufacturing techniques: Lean, Kanban, Flow,

Cellular Manufacturing, Toyota Production System, Kaizen, 5S, TPM,

Poka-Yoke, SMED, Value Steam Mapping.

An innovative and energetic leader, skilled communicator, and team

builder. Proven ability to analyze operations and growth opportunities,

then introduce strategic and tactical solutions that improve competitive

performance while increasing profits. Recognized as a change agent,

relentless in the pursuit of quality products, cost reduction, and

corporate growth.

EXPERIENCE

The Frank McBride Company, Edison, New Jersey

2006 - Present

$80MM Mechanical Contractor specializing in HVAC systems installation and

service.

Vice President of Operations

Doubled revenue and margin over a 3 year period. Took service division

from loss to 9% net profit in 12 months. Utilized lean tools to

streamline preconstruction activities, enabling the Project Management

team to shrink during a time of revenue growth.

Esselte, Buena Park, California 2005

- 2006

$1B manufacturer of paper and plastic consumer products and office

supplies.

Director of West Coast Operations

P&L responsibility for a 900 person Mexican manufacturing operation, a

150 person US manufacturing operation, and a 30 person US distribution

center. Improved customer fill rates from 70% to 98.5% while reducing

headcount by 15%. Created new Classifolder cell that increased

productivity 40% while reducing wip 95%. Design and start up 2nd

Mexican plant to support East Coast and Midwest customer demand.

Victaulic, Easton, Pennsylvania

1996 - 2005

$550MM manufacturer of hydraulic products used in the HVAC and fire

protection markets.

Director of Manufacturing Technology 2005

Determine the processes and equipment required globally in manufacturing

facilities. Purchase or transfer production equipment and set up

training for operators.

Plant & Warehouse Manager 1999

- 2005

P&L responsibility for a 290 person, three shift manufacturing operation

and a 50 person, three shift distribution center. Managerial oversight

of plants in China, Canada, and Poland. Added distribution center

responsibility after taking over failing warehouse automation project and

bringing automation online, reducing warehouse workforce by 65%. Led

Lean Enterprise transformation in the Manufacturing and Distribution

areas, reducing indirect labor by 25%. Increased valve production by 22%

while reducing the direct labor workforce by 7%.

Manager, Manufacturing Engineering 1996 -1999

Created three manufacturing cells to produce end caps, grooved mechanical

tees, and snap couplings, reducing (on average) direct labor by half and

lead time by two weeks. Installed seven CNC machines over a two year

period to support new products and produce existing product more

efficiently.

Doran Manufacturing, Norwalk, Connecticut 1993 - 1996

$10MM precision sheet metal fabrication shop servicing large, high

technology corporations.

Manager, Manufacturing Engineering - Areas of responsibility included:

Manufacturing Engineering, Quality, and IT. Extensive customer

interface, including sales calls. Improved throughput in CNC Punch Press

department 50% over a two year period. Installed new CNC programming

system and Novell network that increased programming productivity 25%.

Textron-Lycoming, Stratford, Connecticut 1990

- 1993

$400MM manufacturer of gas turbine engines used in the M1A1 tank and

business jets.

Manufacturing Engineer - Created part routings, operation sheets, and

labor standards. Designed part fixturing and specified cutting tools.

Wrote CNC programs for vertical and horizontal machining centers, wire

edm, and lathes.

New England Metal Works, Manchester, Connecticut 1989

- 1990

$1MM sheet metal fabrication job shop specializing in aftermarket

automotive parts.

Production Manager - Increased on-time delivery to customers from 10% to

70%. Reduced reject rate by customers from 35% to 5%. Brought new

customer representing a 15% sales increase online.

Perkin-Elmer, Norwalk, Connecticut 1985

- 1989

$300MM manufacturer of analytical instruments used in labs, hospitals and

process industries.

Manufacturing Engineer - Provided technical support to sheet metal,

finishing, and machine shops. Created manufacturing methods for new

product and refined methods for existing product.

EDUCATION

M.B.A., University of Connecticut, Stoors, CT 1988

B.S., Mechanical Engineering, Polytechnic Institute of New York

University, Brooklyn, NY 1985

OTHER PROFESSIONAL TRAINING

Lean Transformation Training, LeanWorks, Knoxville, TN 2002

Management II, University of Michigan Executive Education Center, Ann

Arbor, MI 2002

Quality Improvement Process Management, Crosby Quality College, Orlando,

FL 1997



Contact this candidate