Christopher Michael Nijakowski
Swanton, Ohio 43558
Job Objective
In search of a Executive position: Operational Excellence, Director of Operations,
Plant Manager and/or Project Manager/Manufacturing/Process Engineer/Quality
Engineering Management position in a competitive and demanding environment
which will allow me to share my education, experience, knowledge, and
background with adjacent working personnel as well as learning from each
individual.
Employment History
Dana Corporation, Maumee, Ohio – August 2006 – present
Global Weld Process Owner
Engineering Manager
Sr. Engineer Process
Responsible for all welding technologies and processing for Dana
Torque and traction division globally, 1.9 billion dollars annually.
Responsible for all standard processes and capital investments
globally, for Driveshaft, axle, and frames divisions. Specialist in
Magnetic Arc Welding, Friction Welding, MPW, Operations, Lean
Manufacturing, and all aspects of facility operations.
Responsibilities included OEE maximize uptime, Lean Manufacturing
Process R&D implementation. Runoff and all associated aspects.
Management and creation of a world class Engineering department
at Dana Corporation’s largest North American Manufacturing Facility,
500+ employees. Experience designing specialty equipment, state
of the art processes, and contract negotiations with suppliers and
UAW.
Vast experience with program management, completing the jobs.
Motivating people, developing and leading teams, test plans, etc…
Launched cradle to grave 5 million dollars of new equipment,
retrofits, controls, and automation in one year along with transferring
and installing 10 assembly lines and 160 new team member
positions. Experience with manufacturing equipment and processes
of all kinds.
ArvinMeritor CVS, Heath, Ohio – March 2004 – August 2006
Manufacturing Engineer
In this position, I was responsible for Manufacturing Engineering
For Axle Manufacturing operations. Engineering work related to
Planning, devising, and adapting methods to improve
Manufacturing production is critical. The examination of
Equipment, processes, operations, and assembly are all functions
As are quality, project management, safety, and any other revision
For improvement.
I evaluated manufacturing processes by designing and conducting
Research, applying knowledge of product design, fabrication,
Assembly, tooling, materials and conferring with equipment
Vendors.
Intense studying of customer requirement is required for project
Planning. Evaluations of competitor’s products, identifying and
Analyzing trends in technology, and collaboration with other
Members of management all enhance this process.
I improved manufacturing efficiency by analyzing and planning work
flow, space requirements, and equipment layout, as well as
Enhancing current techniques and optimizing each situation.
I determined feasibility of projects by identifying and forecasting
Costs and total requirements. I assist and often lead problem
Solving practices with suppliers for nonconforming product and
Support supplier development.
Critical competencies include, but are not limited to, good
Communication skills, proficiency with Auto Cad, Master Cam and
Faro Technologies and computers in general, customer sensitivity,
And awareness, and quality programs such as ISO:2002, TS16949
And more.
Project Management/Labor & Burden Performance Project Leader:
I was responsible for identifying, tracking, and reporting out to
Corporate executives, the overall status of all labor and burden
Performance projects for the facility. Ie...over 100 active projects
At any given time. Tied in with this is the facility Capital Plan.
This is the negotiated annual budget to accomplish predetermined
Goals. Managing this budget is directly related to the projects.
Appropriation Manager: I managed all appropriation requests in
Conjunction with finance departments. I ensured that all approved
Funds were utilized in accordance with Sarbanes Oxley and
Capitalized as assets. This also included any transfers to or from
The facility.
Business Excellence Team Leader: I lead the engineering group
In a corporate wide Continuous Improvement program. This
Program covers 20 keys and promotes creativity.
Swanton Welding & Machining Company, Inc. Swanton, Ohio 1990 2004
General Manager – CNC Machining Division (2000 2004)
Managed overall plant operations, all aspects, completed profit
And loss responsibilities. I managed all aspects such as sales,
Estimating, quality, production, personnel, processing,
Purchasing, etc.. but listened to problems from all areas and
Offered solutions and suggestions.
Maintained and maximized production levels. Working hand in
Hand with personnel to maximize efficiency through creative
Problem solving techniques and the natural ability to be creative.
Employees – managed, scheduled, and motivated all employees.
I work well with communicating and motivating people. I
Understand frustrations and waste no time with attempts to
Eliminate them. I build trust on a daily basis and work to make
Even the best employees better.
Scheduling – managed all aspects of scheduling and material
Planning. Correspond with customers and their requirements,
Plan the manufacturing schedule and personnel.
Purchasing – implemented the company wide purchasing
Procedures. I oversaw all purchases within the division,
Authorizing each individual purchase and track them until they
Are received, inspected, utilized, invoiced, and closed.
Implemented supplier relationship policies, and cost reduction
Policies into the purchasing procedures.
Future Planning – I always stress to my team members a
Common goal. Many times this is to service, better every day,
Our customers, be fair to all and to always be conscious of
Quality, integrity, and efficiency. Introduced six sigma to our
Different divisions, implementing several training strategies.
Engineering Manager/CNC Programming: 1998 2000
Accomplished training classes on CAD/CAM software which
Allows the CNC programming of nearly all CNC machining
Centers and lathes. Effectively completed complex programs.
Worked through the job set up programs successfully.
Successfully completed job set up and CNC programming at
The machining centers themselves – punch in programming.
Also utilized CAM software for programming complicated
Functions and parts off line.
Offered suggestions to customers (US military) on design of
Products, again around existing variables and feasibility.
Designs were successful throughout all production stages –
Castings, machining, Casting designing, Fixturing designing,
And assembly the first time.
Developed Product Evaluation Study basic program and
Followed through to top management the results, all
Characteristics considered. Similar to time studies, though
Much more intense and part specific.
Assisted in the development of the production scheduling
Standard. Created all computer spreadsheets and calculations.
Created for data input only. Currently a production “Bible”
This documentation ensures on time delivery.
Quality Control/Quality Assurance Manager: 1996 1998
Developed new documented concepts for a quality department.
After multiple presentations to company executives, I was
Authorized the necessary tools to open a quality department.
Continually strive to offer best in class product and service to
Customers. This leads to the development of a tracking system,
Problem solving process, and process control abilities.
Pursued the ISO 9000 program until the company became 100%
Compliant. Developed and wrote all necessary policies,
Procedures, and work instructions. Upon successful completion,
I transferred to our adjacent division and began the process of
ISO 9000 registration over again and was successful.
Developed an extensive training program for all company
Employees. Program detailed training options, qualifications,
Criteria, and both completion and re train dates.
Worked on Caterpillar specific requirements for the CNC
Production machining of products. This system is designed
Only to protect the customer, offering top quality products with
100% on time delivery. During the first 6 months of
production, my present company has experienced zero
customer rejections.
Engineering/Drafting Technician 1995 1996
Assisted in the design of products around both existing
Variables and feasibility of project. Worked extensively
On Auto Cad, creating new drawings and editing existing
Drawings.
Welder/Fabricator 1992 1995
Fabricated multiple shapes, both simple and complex per
Customer specifications. Such shapes as conveyors,
Machine bases, frames, and forms. Developed an elite
Style of blue print reading through multiple readings and
Excessive practice. Extremely proficient at the operation of
All available equipment, both manual and NC controls.
Maintenance/Janitorial 1990 1992
Job duties included general maintenance on various machines
Such as band saws, press brakes, steel shears, welders and
Vehicles. Also maintained cleanliness of company environment
And surroundings.
Additional Experiences:
Experience in purchasing, quality, engineering, problem solving,
Employee relations, and sales. I provide to employees and co
Workers extensive training on computers (Word, Excel, CAD,
CAM, Master Cam and Faro Technologies. I offer best in class
Communication abilities with co workers and customers. I am
A very aggressive self motivated person. I always maintain a
Positive, hard working, and honest attitude with all persons.
Due to my effectiveness on all duties, I have been assigned to
All functions within the company at one time or another with
Total success.
I have extensive experience with problem solving and objective
Evaluations which leads to precise decision making. I am very
Hands on and mechanical due to assisted work with a local racing
Team. This mechanical ability allows me to understand
Complications and offer solutions.
I volunteer at local schools to assist young students with their
Reading and mathematical skills. I also volunteer with multiple
Community projects such as parades, playgrounds and fund
Raisers. I assist the Toledo Metro Parks with general maintenance
Of the park, such as tending trails, picking up litter and maintaining
Tree signs for public information. I also did volunteer work with a
Semi local sculptor/artist in writing a personal profile to assist him
In building a foundation for his reputation – sales of his
Performance.
Education
University of Toledo, Toledo, Ohio
Associates of Applied Science, Mechanical Engineering Technology
Bachelors Degree, Business Management & Mathematics – Degree
On hold – Junior status
Faro Technologies, Lake Mary Florida
CAM 2 measure training for Platinum 8 foot Arm, Certificate of
Completion for basic and advanced classes.
Brown & Sharp Aftermarket Services, Novi, Michigan
Micro Measure III Software for Coordinate Measuring Machines,
Certificate of Completion
Micro Measure IV for DCC (Direct Computer Controlled) Coordinate
Measuring Machines, Certificate of Completion
Rodgers Maryland International Ltd. Maumee, Ohio
Certificate of Completion for Executive Overview Training Course
For ISO/QS 9000
Midwest Management Systems, Maumee, Ohio
Certificate of Achievement for ESM (Effective Supervisory Management)
FASTech, Inc. Findlay, Ohio
Certificate of Achievement for Mastercam Mill Version 7.
(CNC programming software0
Penta County Vocational School, Toledo,Ohio
Adult Education Class – Basic Welding, Certificate of Completion
Gidding & Lewis Inc. Chicago, Illinois
Certificate of Achievement for Numeripath 8000 Controls and
Programming
Swanton High School, Swanton, ohio
Graduated 1993, High School Diploma
References available upon request