Lee W. French, P.E.
Nine Mile Falls, WA. 99026
abk2bo@r.postjobfree.com
OBJECTIVE:
Obtain a position with an employer where I can use my strong analytical,
detail-oriented and interpersonal skills along with my exceptional problem
solving ability to provide outstanding service to clients.
PROFESSIONAL PROFILE:
A highly innovative and ingenuous individual having more than eleven years
experience performing structural calculations for the design of commercial
and residential building projects up to 100,000 square feet.
. Design and detailing experience in wood, steel, concrete tilt-up, CMU
and post-tensioned concrete construction materials.
. Recognized as a troubleshooter who manages multiple responsibilities
simultaneously, successfully and efficiently resolving issues, and
consistently meeting and exceeding goals and objectives.
. Quick learner who is accustomed to fast paced conditions.
. Able to easily grasp and apply new ideas, concepts, methods and
technologies.
. Supervised six engineers/drafters and scheduled man hours for
projects.
My experience in the construction field has taught me of the importance of
consistent communication between different parties from the project's
inception through its completion. Details that are left out come back
around at a later date and therefore I rarely overlook anything. I have
aimed at always solving difficult problems with ingenuity and creativity
while keeping public safety the top priority.
REGISTRATION
P.E.: Washington, Idaho
EDUCATION
B.S., Civil Engineering, Washington State University, 1997
M.S., Civil Engineering, Washington State University, 1998
PROFESSIONAL SOCIETIES
*Structural Engineers Association of Washington
*Cold -Formed Steel Engineers Institute
*American Institute of Steel Construction
SELECT PROJECT EXPERIENCE
. Davenport Hotel Renovation, 14 story complete renovation of 1908
hotel, Spokane, WA
. Safeway Expansion, Expanded 32,000 SF existing Safeway grocery store
to 52,000 SF. Removed all exterior bearing walls and expanded on every
side. Whitefish, MT.
. Regal Place Office Building, Two story with full basement concrete on
metal deck, steel framed structure, Spokane, WA
. Super 1 Foods, 58,000 square foot CMU grocery store, Sandpoint, Idaho
. Pinecroft III, V, VI, Concrete tilt-up, Spokane Valley, WA
. Hilton Garden Inn, Six story post-tensioned hotel, Chandler, Arizona
. Marriot Courtyard, Two levels underground post-tensioned parking, post-
tensioned podium slab and three levels of wood framing above,
Bremerton, WA
. LDS Stake Center, Wood framed church facility, Spokane Valley, WA and
Moscow, Id.
. Peirone Produce, 65,000 SF concrete tilt up warehouse, office and
repair facility, Airway Heights, WA
Additional project experience and references available upon request.
Technical Skills:
RAM Concept
RAM Structural Systems
RAM Smart Beam
RAM Advanse
Risa 3d
Enercalc
TJ Beam
Microsoft Office - Outlook, Word, Excel
Prior Employment:
*TLCP Galvin Structural
Project Engineer
Jan 1999 to Feb 2001
*DCI Engineers
Project Manager
Feb 2001 to April 2010
* Whipple Saywers Consulting Engineers - Structural Manager. April; 2010
to present