Post Job Free

Resume

Sign in

Engineer Quality

Location:
St Lawrence, NY, 12949
Posted:
September 28, 2010

Contact this candidate

Resume:

MARCOS DE SOUZA AMORIM

Alameda Tico Tico, **. - Atibaia - SP - Brazil

Phone: 843-***-**** Mobile: +55-11-764*-****

Email: abjx1a@r.postjobfree.com Skype: marcosdsamorim

Objective: Position in Quality / Purchasing

Professional Profile

V Industrial engineer with strong background in problem solving and

manufacturing.

V Ability to manage suppliers for consistent results.

V Proven ability to resolve quality issues at supplier level. Experience

includes failure mode effect analysis (FMEA) processing, manufacturing

quality verification processing, fault three analysis (FTA), 8D and 7

steps, Kaizen, supplier proactive audits and ISO TS 16949 standards.

V Experience in productivity projects involving lay out studies, times and

methods analysis, waste reduction, continuous improvement actions and

ergonomics.

V Proven ability to create and balance work cells, improve manufacturing

process and develop new devices

V Six Sigma Green Belt Trained and ISO TS 16949 auditor certified

Experience

? International Engines South America (A Navistar Group) - Sao Paulo,

Brazil

Senior Supplier Quality Engineer - Purchasing

From: September 2008 until today

V Manage suppliers quality indicators

V Responsible for quality assurance of large corporate suppliers such as

Bosch and Delphi

V Responsible for European suppliers quality

V Coordinator of quality department's work environment satisfaction

improvement program

V Focus on supplier process and product audits to improve suppliers'

capacity and supply chain level

V Work with supplier to solve OEM and in plant issues by using problem

solving tools, 8D and Kaizen methodologies

V Implemented customer specific requirements and programs at suppliers

(QSB-GM, GP-12)

V Quality auditor based on ISO TS 16949 and VW VDA audit requirements

? Cummins Brazil - Sao Paulo, Brazil

Junior Supplier Quality Engineer - Purchasing

From: February 2006 to September 2008

V Managed and worked with suppliers on quality issues for fuel system

and electronic parts, including wiring harness, temperature and

pressure sensors, electronic injectors and pumps, mechanical injectors

and pumps, tubes (fuel, water, oil fuel filters, starters and

alternators.

V Qualified potential suppliers and performed on-site quality audits at

facilities.

V Maintained product integrity by ensuring parts provided for

manufacturing met quality standards for engineering specifications

through PPAP (production parts approval process).

V Directed suppliers in new developments through APQP (advanced product

quality planning) process.

V Coordinated quality work with suppliers for global sourcing projects.

V Processed and approved FMEAs, corrective actions and customer quality

concerns.

V Led multifunctional group on warranty problems solving project

(Project over $2 million cost avoidance)

V Improved supplier quality by performing product, process and system

audits.

V Evaluated supplier capacity by using production capability

certification run.

? Robert Bosch Corporation - Charleston, USA

International Trainee - Industrial Engineer

From: January 2005 to January 2006

V Performed work measurement, methods improvement and time studies.

V Performed measurement analysis to improve laser etching process.

V Developed and implemented Operators Work Instructions.

V Carried out machine, process and gauge capability studies on new

machines, lay out changes and process improvements.

V Led Office Housekeeping program.

V Developed and implemented plant staff competence matrix.

V Led injector body machining scrap cost reduction.

V Developed fool proof masters and fixtures for production.

? Parano Industria de Borracha S.A (Parano Rubber Industry) - Brazil

Industrial Engineer - Manufacturing

From: November 2003 to January 2005

V Implemented overall efficient equipment (OEE) control and trained all

plant staff.

V Saved over $500.000 by implementing lean manufacturing initiatives.

V Decreased quality costs by implementing rework and scrap controls

(visibility to address actions).

V Directed Housekeeping program (metrics, audits, follow ups,

improvements).

V Led Continuous Improvement Team which supported plant staff ideas and

prizes to best idea.

V Reduced part cycle time and production costs by developing and

implementing work cells.

V Increased productivity by changing lay outs, implementing alternative

processes.

V Resolved technical and production issues, ensuring adherence to

quality, manufacturing budgets and schedules.

V Implemented new packaging for parts in process to gain productivity

and improve ergonomics

Education

? Bachelor of Science: ? Post Graduation in

Industrial Administration

Mechanical Production Engineering USP - University of Sao

Paulo

FEI - University of Industrial Engineering Brazil (Dec 2008)

Brazil (2004)

Languages

? English - Fluent (Worked in the US for a year)

? Portuguese - Native Language

Professional Development Courses and Recycling

? MSA (4th Edition) ? ISO TS 16949:2002 AUDITOR

EstatCamp - August 2010 RABQSA - November 2008

? SIX SIGMA GREEN BELT ? VALUE STREAM MAPPING

Cummins Brazil - September 2008 Robert Bosch Co. - August

2005

? UNDERSTANDING VARIATION ? APQP + PPAP (3th Edition)

Robert Bosch Co. - July 2005 Cummins Brazil -

February 2007

? DESIGN AND PROCESS FMEA (3th Edition) ? ADVANCED EXCEL

Cummins Brazil - February 2007 S.O.S Computing - August

2002

Computer Skills

V Word, Excel, PowerPoint, MS Project, Oracle, SAP, AutoCad



Contact this candidate