Chesley "Chet" May
*** ********** ****** ( San Antonio, TX 78223 210-***-**** (
********@*****.***
Process Design Engineer / Production & Manufacturing Engineer
Process Improvement ( Project Management ( Quality Control Management
Versatile engineering professional with extensive experience installing and
maintaining critical production / manufacturing processes, coordinating,
planning and supporting high-volume, fast-pace business environments.
Repeated success driving support methodologies and leading teams in the
design, redesign, and launch of leading-edge business solutions and quality
control measures. Skilled project leader capable of guiding teams through
installation, testing, and troubleshooting of customized process /
equipment installations. Talented at forging relationships with strategic
partners to ensure smooth, quality-controlled business / product launches.
Areas of Expertise
Work Flow Production / Manufacturing ISO 9001:2000 Standards / Greenbelt
Analysis Strategies
Lean Manufacturing / 5s / Kaizen Process / Safety Requirements
Methodologies Documentation
Synchronous / Cellular Manufacturing Team Leadership / Training / Mentoring
Process Redesign & Root Cause Failure Black Belt & Lean Green Belt
Analysis Methodologies
Professional Experience
the fountain group - CONTRACTED TO DELL ENGINEERING SERVICES - Boerne, TX
05/2011 to 08/2012
Project Engineer
Recruited and charged with aiding Albany Engineered Composites, Inc. on
existing JSF production ISV's. Responsibilities consist of dis-positioning
sub-components and completed assemblies non-conformances to Rolls Royce.
Modifying/updating Production Processes and Work Instructions to eliminate
rework, scrap, revised customer requirements including concession
submittals to customer of non-conforming components.
Longhorn Engineering and Electrical Contracting Inc. - Port Aransas, TX
05/2010 to 05/2011
Partner / Project Engineer - Manager
Utilize engineering expertise and leadership skills to administer all
aspects of new projects and support current remodeling projects. Interface
directly with clients and project managers to evaluate project needs and
devise appropriate schedules / solutions to ensure on time / on budget job
completion. Supervise development and creation of client's project drawings
and change orders to ensure change requests are met. Conduct onsite
inspections and project reviews to ensure all project benchmarks are
achieved.
- Credited for reducing change orders by 38% by meeting with customer
during initial planning phase and prior to project starting to
indentify and resolve any potential issues.
- Reduced rework by 28% by meeting daily/weekly with employees to review
work scope and schedule.
- Improved cycle time by 22% by reducing change orders, rework and
addressing problems quickly.
The Scooter Store - New Braunfels, TX 05/2008 to 05/2010
Business Process Engineer
Provided strategic business process planning and direction, including
identifying current / new opportunities, defining business requirements and
orchestrating solutions that adhered to overall company vision. Analyzed
workflows and recommended new processes that improved current and future
operations. Interfaced directly with business sponsors and key stakeholders
to establish dynamic relationships needed to efficiently define project
commitments, assess specifications and devise solutions to support all
expectations.
- Drove process to create and implement a pilot program that linked
Direct Sale opportunities to seven field locations thus increasing
direct sales by $600K annually.
- Leveraged "hands-on" management style to complete intensive position
study of Mobility Specialist Manager, defining new workflows and
processes for better controlling inventory.
o Realized saving of $107K in one distribution center following
initial implementation.
o Played key role in implementing program across 52
distribution centers, which earned realized annual profit
growth of $5.5M.
Chromalloy Gas turbine- San Antonio, TX 04/1999 to 05/2008
Cell Manager / Production Engineer - Power Services (03/2004-05/2008)
Promoted to manage and direct operations for team of 22 Mechanics that
supported this non-OEM provider specialized in repairing and replacing
parts for gas turbine engines. Led team in disassembling, assembling and
testing Airbus 331-200 and Boeing 767 331-250 Auxiliary Power Units (APU)
for clients such as American and TWA Airlines. Served as primary point of
contact in analyzing root cause issues, researching repair methods, and
improving product flow and assembly build process. Scheduled APU
deliveries, planned work schedules, interviewed, hired and trained
employees to perform above expectations.
- Credited for savings $100K in annual costs by building more efficient
part number tracking system.
- Achieved increased productivity and team efficiencies by cross
training employees, redesigning floor operations and reengineering
facility layout, all which increased overhaul shipments by 20%.
Production Engineer - Component Services (04/1999-03/2004)
Recruited to aid this startup non-OEM gas turbine engines repair and
maintenance firm, and charged with engineering and designing plant
equipment layouts and supervising installation of new equipment. Served as
facility engineer to evaluate, recommend and implement all capital
improvement projects. Coordinated with engineering department in resolving
production problems and controlling workflow process to support TF39 Engine
program. Worked with US Air force Engineering Liaison to document and
update process routing work instructions and departure records for final
approval.
- Played key role in consolidating and relocating equipment from four
buildings into one facility, while maintaining production / repair
schedules.
- Planned and implemented installation plans for Paint and Plasma spray
operations.
- Credited with aiding department in improving Cycle time by 30% and
reducing cost of packaging materials $2.5M by completing lean Green
Belt project.
Mooney Aircraft Corporation - Kerrville, TX 08/1997 to 04/1999
Senior Industrial Engineer
Hired to lead team of three Industrial Engineers in supporting installation
and operation procedures for all new capital improvement projects,
including implementation of work cells in machining, paint, assembly and
final preparation departments. Managed all aspects of high profile projects
from initial planning phase to winning final management approvals. Directed
training of new engineers and team technicians.
- Streamlined manufacturing processes through utilization of Kaizen and
Lean manufacturing techniques and implemented work cells in the
machining, paint, assembly and final preparation departments.
- Improved product cycle time by 30% by developing new layout for main
assembly hanger, sheet metal and machining department.
- Realized annual savings of $90K by installing vinyl plotter, cutter
and engraving machine, which eliminated out-plant purchased materials.
Additional experience as Shift General Manager and as Senior Process /
Product Engineer
for Howmet Corporation in Wichita Falls, Texas.
Educational Background
Bachelor of Science in Engineering Technology with emphasis in Industrial
Production Management
TEXAS A&M UNIVERSITY, College Station, TX
Professional Development:
MBA Degree Credits: Marketing and Cost Accounting; Completed
Seminar/Training: Improving Managerial Skills for the New or Prospective
Manager, Developing Executive Leadership Training.
Technical Proficiencies:
Applications: Proficient in Microsoft Word, Excel, Project, Outlook,
PowerPoint and Visio
Methodologies: Geometric / Dimensioning / Tolerance / Metrology measurement
& testing methods
Hardware: Proficient in using Calipers, Micrometers, Height Gages,
Borescope, Depth Gages