Miles E. Simmons
Home: 678-***-**** Cell: 678-***-**** abjqpy@r.postjobfree.com
[pic]
Qualifications summary
A creative and driven engineering and operations manager with P&L
responsibility and comprehensive expertise in the following areas:
Manufacturing and Process Engineering ( Lean Methodologies ( Kaizen (
Just in Time ( Kan Ban ( Total Quality Management ( Inventory Control
( Logistics
Distribution ( Production Scheduling ( Materials Planning ( Purchasing
Maintains consistent and reliable performance of products, supply
chains, and assembly lines according to specifications. Investigates
the root cause of problems and provides cost-effective resolutions.
Enables real-time access to data and information to dissolve barriers
between departments and empower multi-functional teams.
A self-motivated and enterprising leader who provides clear direction
to coworkers and facilitates strong relationships between all levels
of an organization. Secures stability through periods of transition
by focusing on outstanding service. With a compassionate perspective,
embraces multiple viewpoints to deliver well-informed decisions. As a
logical and enthusiastic achiever, demonstrates an insatiable drive
for growth and profitability.
[pic]
experience
ACUITY BRAND LIGHTING Cochran, Georgia
2007- 2008
Director of Engineering
Responsible for all technical resources within the Georgia Production
Facility. Manage assets, material routings, product and process
improvements. Member of the core team to convert a batch flow manufacturing
environment to a lean, value stream production facility.
. Managed 22 hourly maintenance associates, 5 clerical, and 4
engineers.
. Controlled a $1.6mm annual budget
. Successfully directed Engineering Change initiatives
. Member of product design team
. Introduced necessary manufacturing process changes to accommodate
product design changes.
. Analyzed and recommended process changes to streamline manufacturing
flow and assist the organization in implementing Lean Methodologies.
. Created RFP, selected vendor and initiated project to install plant
wide HVAC.
Yazaki - Nacom Corporation Griffin, Georgia
2001-2006
Service Products Manager,
TQM Manager
Engineering Manager
Directed all aspects of manufacturing, quality, planning, scheduling, and
logistical systems within service parts group. Met customer's service
parts requirements following original equipment manufacturer's mass
production. Managed customer service part needs and ensured on-time
delivery of all service parts orders. Directed finish goods inventory
turns as well as purchased part and WIP "Work In Process" inventory
quantities. Coordinated and improved transition of original equipment
manufacturing and assembly to low-volume, high-mix fabrication and assembly
processes.
. Enabled $3,100,000 in revenue from liquidation of obsolete raw materials
and purchased parts.
. Grew service part sales from $1,000,000 in 2004 to $2,200,000 in 2005.
. Oversaw launch of Chrysler Pacifica program within all five departments
at Nacom facility.
. Successfully reduced engineering department's turnover from 50% annually
to less than 3% within first 12 months.
. Coordinated automated assembly, stamping, and molding departments.
. Established structure engineering departmental goals and aligned them
with manufacturing productivity targets.
. Leveraged technical resources for departmental lean initiatives.
. Led total quality management program, including TS16949 initiative.
. Converted QS 9000 quality system to TS16949 quality system at Griffin,
Georgia facility.
. Condensed five programs into one production line.
Emerson Appliance Controls Frankfort, Indiana
1999-2001
Business Unit Manager
Planned, organized, and executed manufacturing of dishwasher and laundry
timers for original equipment manufacturer applications. Held profit and
loss responsibility for $25,000,000 business. Managed manufacturing supply
chain and final assembly, producing 10,500,000 units annually. Directed
execution of production system to meet just-in-time delivery commitment to
customer. Implemented systems to enable production to transition from
quality control organization to quality assurance organization.
Developed measurables as well as reporting system to enable real-time
production data at time of execution. Created multi-functional, multi-
departmental teams to investigate and resolve barriers to efficient
manufacturing of original equipment manufacturer products. Integrated
succession planning system to add depth to organization's management.
. Increased output of Delta production line from 11,000 units daily to
over 18,000.
. Installed Kan Ban system to reduce WIP "Work in Process" and schedule
overtime of stamping and over-molding production associates without
management's intervention.
. Instituted metrics reporting and tracking system to develop self-
empowered work teams and drive attainment of labor/material cost
targets.
. Consolidated four separate pay scales into two, achieving labor savings
of over 15%.
Woods Industries Carmel, Indiana
1997-1999
Director of Engineering
Planned, organized, and directed projects to modify and improve existing
injection molding, continuous extrusion, and assembly equipment. Designed
and developed new equipment utilizing Kaizen and lean manufacturing
concepts. Directed corporate manufacturing and process engineering
activities for $200,000,000 international company. Managed prototype
fabrication and assembly equipment, from conceptualization to automated
processes, producing $80,000,000 in finished goods. Created real-time
process control and data logging systems to make production data available
to manufacturing network.
Instituted successful engineering group. Achieved $2,000,000 in measurable
process efficiencies using lean manufacturing principles. Performed
research to justify all major productivity improvements. Provided
informational materials for corporate and holding company presentations.
Worked closely with marketing and sales departments to create customer
satisfaction and cost-effective engineering focus.
. Modified extrusion system for insulated wire, achieving annual savings
of $60,000 per machine.
. Increased daily wire output of machines from 1,600,000 feet to 2,200,000
feet.
. Co-developed over-molding process to reduce amount of PVC per part,
saving $500,000 annually.
. Instituted several processes utilizing soft logic controls, defining
soft logic as standard skill set to build in-house equipment.
ADDITIONAL EXPERIENCE
BKD LLP Indianapolis, Indiana
1995-1997
Quality Division Manager
Managed national activities of quality consulting group, developing
symmetry between operations and manufacturing within client companies.
Directed and performed process and systems improvement engagements.
Assist with QS and ISO registrations.
Alpine Electronics Greenwood, Indiana
1988-1995
Production Engineering Manager
Developed and maintained robotic and automated production systems
utilizing continuous flow and cell manufacturing techniques to produce
original equipment manufacturer car audio products.
Cybotech-Ransburg CorpORATION Indianapolis, Indiana
1982-1988
Senior Field Service Engineer
Integrated and critiqued non-standard computerized robotic welding and
painting systems to decrease costs and increase productivity.
Developed computer interface system to enable existing computer
systems to interact with robotic controller.
LINK DIVISION SINGER INC. Binghamton, New York 1977-
1982
Engineering Contractor
Maintained and enhanced multiple aircraft simulation systems to train
pilots for visual and instrumentation flying regulations.
[pic]
education
Ohio Institute of Technology
Columbus, Ohio
B.S., Electrical Engineering
[pic]
computer skills
Microsoft Office Suite
JDE R7.3c6
SAP
[pic]