Hung (Anthony) D. Dao
Houston, TX 77014
Home: 281-***-**** abjkgq@r.postjobfree.com
Cell: 832-***-****
PROFESSIONAL SUMMARY
Senior Design and Engineering Product Specialist Professional with over
fifteen years in the Oil & Gas service industry. Self-motivated and self-
directed. Demonstrated experience in subsea system and down hole tool
design, with ability to develop projects, multi-task and problem solve.
Knowledge of general principles, concepts, theories, and practices of an
oil field. Proficient in AutoCAD, Inventor, Solidworks, SAP, Windows, and
Microsoft Office. Ability to quickly and easily learn and use new software, hardware.
CAREER EXPERIENCE
CAMERON: Houston, TX
2009 - 2010
Engineering Product Specialist - Subsea Systems, Flowline Connections
Prepares engineering drawings of equipment including machine details,
assemblies, and manufacturing
instructions, graphs, and layouts. Drawings are constructed using design
concepts created by the designer or
other individual or from information specified in an engineering sales
request. Creates bills of material, assembly and test procedures and other
product documentation, performs quantitative design calculations, executes
change orders, takes direction from a lead engineer or supervisor,
maintains engineering database information associated with drawings and
their bill of materials using PLM and performs thorough checking of
drawings and design documents.
. Created a sale proposal with standard CHC Connector for: 4"-10k, 6"-10k,
8"-10k, 10"-5k for Chervon, Australia.
. Designed a CHC Connector Pin Alignment Test for in house 12" Hub.
. Designed a Flooding Cap for 10"-5k Flowline Hub with 6x anodes for BP
Angola.
. Designed a Test Cap End for 12"-10k CHC Connector for BP Angola.
BAKER OIL TOOLS, Baker Hughes Division: Houston, TX 1998 - 2009
Sr. Designer - Technical Supports, Sand Control Group
Provided product design drawings and development work for the Product
lines. Produced CAD drawings and associated manufacturing related
documentation in a time sensitive environment. Provided support to
Marketing using engineering or work-related skills to solve technical
design-related problems. Analyzed and interpreted experimental and field
data to make recommendations concerning product design, materials, and
manufacture. Computed mathematical formulas to develop and design detailed
specifications for components using computer-assisted equipment. Modified
and revised designs to correct operating deficiencies or to reduce
production problems. Conferred with customer representatives to review
schematics and answered questions pertaining to installation of systems.
Coordinated and worked in conjunction with other workers to design, layout,
or detail components and systems. Directed work activities of detailer and
conferred with staff and supervisors to revolve design or other problems.
Experienced working in an ISO certified engineering/manufacturing
environment.
. Designed successful first test run CS Crossover Tool with the engineering
team, tool maintains hydrostatic overbalance across the formation during
all phases of the completion, achieved the objective of gravel packing
the horizontal section.
. Developed Equalizer System to create a more uniform production profile of
entire length of wellbore, also delays or eliminates problems caused when
screens plug or erode before wells are depleted.
. Designed Hi-Rate Frac Tool, helped to prevent fluid loss, and also cut
rig time and cost in half.
. Worked with IWS Engineer group to design the Fiber Optic Cased Hole
System requested by customer, to monitor
. the downhole pressure and temperature, flow control of two zones and
control downhole chemical injection.
Created TCP One Trip System, eliminated one round trip in the well,
saving rig time and costs, reduced the amount
. of time that open perforations are exposed to overbalanced completion
fluid pressures.
. Designed Well Bore Tool software for field engineers to create a faster
and more productive proposal layout spreadsheet requested by customer,
using laptops or PDA hand held that able to link to home base network.
BAKER INTEQ, Baker Hughes Division: Houston, TX 1992 - 1998
Designer, Directional Drilling Group
Designed and assembled layout of fixture for testing new prototype tools.
Technical specification and reference data to produce detail drawings.
Tested and analyzed new tools or equipment. Created and maintained bill of
materials (BOM). Provided technical support for floor and client focus
team. Provided support for existing product lines. Assisted in project
planning and review.
. Worked with Drilling Engineer group to design Auto Trak Rotary Closed
Loop system, it combines speeds, precision, and reliability, in one
unique rotary steerable system.
. Designed layout for Multilateral Drilling System, its reduced in uphole
drilling and equipment costs by reducing the number of wells to be
drilled from surface.
. Designed Trutrak Directional Drilling and successful first field test
with field engineer, it helped to maximize drilling
CHROMALLOY HIT, Dallas, TX 1989 - 1992
Engineer Technician
Assembled drawing of turbine engine. Designed layout of fixture. Pressure
tested materials for new part before production. Assist with product
design. Create part numbers and detailed routing in manufacturing system
computer. Technical assistance to manufacturing as required.
EDUCATION
BS, Mechanical Engineer, Oklahoma State University, OK, May 1989
ADDITIONAL TRAINING
Gravel Pack Techniques for High Efficiency Completions. Optimized Sand
Management. Horizontal Gravel Pack Design. Advantage Torque and Drag /
Tubemove software(calculation forces and stresses on tubular strings). SAP
U.S. CITIZEN