Scott Buker, CMRP
Home 865-***-**** Cell 423-***-****
Greenback, TN 37742
abjk08@r.postjobfree.com
CAREER FOCUS
Pursuing Title position utilizing my broad and extensive
experience in maintenance management and successful
implementation of Preventive Maintenance and Predictive
Maintenance programs which achieved performance and corporate
goals in a fast paced, results-driven environment.
PROFESSIONAL EXPERIENCE
DENSO Manufacturing Tennessee, Maryville, TN (Jul. 1990 to
Present)
DENSO - Production Maintenance and Equipment Design Manager
(Jan. 2001 to Present) - Directly responsible for the management
of Production Maintenance and Equipment Design departments which
design and maintain manufacturing equipment involved in the
manufacture of various automotive electronic control units.
. Reduced breakdowns by 80% and downtime by 75% over five
years
. Upgraded MAXIMO CMMS to version 7.0
. Developed and implemented a TPM promotion committee
. Reduced costs and manpower by developing and implementing
condition monitoring
. Implemented Predictive (PdM) Technologies infrared,
ultrasonic, and vibration analysis
DENSO - Electronics Maintenance Assistant Manager (Jan. 1997 to
Jan. 2001) - Directly responsible for management of Electronic
Maintenance department which constructs and maintains all types
of product testing equipment involved in the manufacture of
various automotive electronic control units. Also, managed the
instrument calibration department.
. Upgraded Selected and implemented MAXIMO CMMS
. Developed and implemented TPM activities including principles
class
. Developed departmental policy for QS-9000 certification
. Had full budget responsibility ($1.2M)
DENSO - Electronics Maintenance Supervisor (Jul. 1990 to Jan.
1997) - Directly responsible for supervision of Electronic
Maintenance Technicians that maintain all types of product
testing equipment involved in the manufacture of electronic
engine control units.
. Selected and implemented Mainsaver CMMS
. Developed and implemented TPM activities
. Designed and constructed automated equipment for completing
preventive maintenance (PM) tasks
. Organized a calibration lab for all electrical and
mechanical measuring equipment
. Had full budget responsibility
RCA CONSUMER ELECTRONICS, Bloomington, IN (Sept. 1980 to Jul.
1990)
RCA - Maintenance Supervisor (Oct. 1988 to Jul. 1990) - Directly
responsible for the supervision of 30-35 technicians.
. Developed and implemented preventive (PM)/predictive
maintenance (PdM) processes
. Identified root causes of equipment failures and repetitive
repairs
. Recommended cost reductions and engineered improvements to
existing equipment to improve production capabilities and
product quality
RCA - Process Control Engineer (Apr. 1987 to Oct. 1988) -
Directly responsible for the analysis of product quality
deficiencies through the use of SPC.
. Engineered changes to products and processes
. Lead task force groups, developed to solve long term
manufacturing problems
. Helped to improved product quality by 11% in one year
RCA - Maintenance Supervisor (Jun. 1984 to Apr. 1987) - Directly
responsible for the supervision of 30-35 technicians and
implementation of:
. Preventive Maintenance (PM) programs
- Maintained equipment performance records
- Ordered and maintained spare parts inventory
- Scheduled construction projects
- Scheduled production support staff
. This position covered many different types of equipment including PLC's,
robots, and vision systems
RCA - Assembly and Test Supervisor (May 1983 to Jun. 1984) -
Directly responsible for the supervision of 30-45 hourly
employees and additionally responsible for the first line
supervision of production test, assembly, and repair areas in
videodisc operation.
. Maintained quality, production, and timekeeping records
. Responsible for final product quality
RCA - Electro-Mechanical Specialist Group-leader (Jan. 1981 to
May 1983) - Directly responsible for the supervision of Electro-
Mechanical Specialists and repair groups.
. Taught troubleshooting techniques classes
. Followed up with other departments on assembly deficiencies
RCA - Electro-Mechanical Specialist (Sept. 1980 to Jan. 1981) -
Directly responsible for the troubleshooting and repair of CED
video disc players and televisions.
ROSTONE CORPORATION, Spencer, IN (Aug. 1977 to Sept. 1980)
Plant Maintenance Technician - Directly responsible for
plant maintenance work including:
- 3 phase wiring
- Hydraulics
- Pneumatics
- Welding
- Production process equipment maintenance
- Electronics
- AC / DC drive systems and motors
- Boilers
- Plumbing
- Microwave ovens
- Water chillers
EDUCATION
IVY TECH (May 1987) Associates Degree - Electronics Technology
Rostone Corporation (September 1980) - Plant Maintenance
Apprenticeship
Society for Maintenance and Reliability Professionals - SMRP
(Dec. 2007) - Certified Maintenance and Reliability Professional
(CMRP)
ADDITIONAL TRAINING AND CERTIFICATIONS
- Statistical Process Control (SPC)
- Total Productive Maintenance (TPM)
- Allen-Bradley Programmable Logic Controllers (PLCs)
- Quality Leadership
- Mainsaver Computerized Maintenance Management Systems (CMMS)
- MAXIMO CMMS Administrator
- MAXIMO 6
- Designing Experiments
- Refrigerant Transition and Recovery
- Calibration Laboratory Management
- Gagetrol gage calibration software
- HAZMAT
- Reliability Centered Maintenance (RCM)
- Condition-Based Monitoring (CBM)
- SCUBA diving
ADDITIONAL ACCOMPLISHMENTS
Presenter at The International Maintenance Conference 2007 -
Root Cause Analysis
Presenter at MARCON Maintenance Conference 2009 - Choosing and
Using KPI's
Presenter at MARCON Maintenance Conference 2010 - Condition
Monitoring of Production Assets