M. Khaled Hassan *** Regency Square.
Kalamazoo, Michigan
E-mail:
abjhmj@r.postjobfree.com
____________________________________________________________________________
_________________
OBJECTIVE: A challenging position in Lean
Manufacturing/Industrial Engineering.
EDUCATION: BS in Industrial Engineering.
Western Michigan University. 1997
PROFESSIONAL EXPERIENCE:
DENSO Manufacturing Inc. Battle Creek, Michigan. Nov. 2002 - Present
Automotive components manufacturer supplying air conditioner, Radiator to
Chrysler, Toyota & Honda.
Advanced Industrial Engineer Dec. 2003 - Present
. Facilitate lean manufacturing, JIT/Toyota production system
(TPS). Lead KAIZEN event to improve product flow, net time &
changeover by eliminating non-value added operations.
. Determine Tact time, cycle time, manpower requirement, Set labor
standard, Establish standardized work, line balance & flexible
manpower for assembly lines.
. Develop material & information flow diagrams (value stream
process mapping).
. Design line layout, ergonomic workstations with improved motion,
over-head structure & component flow racks ensuring safety,
quality & productivity.
. Improve 5S, material flow, Kanban calculation & implementation
of KANBAN system.
. Determine optimized lot siz, inventory & standardize material
conveyance method
. Justify, specify, order, and install processes, tooling and
equipment.
. Prepare detailed reports and analysis for use by management in
measuring overall production efficiency.
. Train TPS tools to subordinates & production management
Sr. Quality Engineer Nov. 2002 to Dec. 2003
. Handle all issues related to TOYOTA-Kentucky (TMMK) plant,
identify the root cause of problems, verify countermeasure
effectiveness, report corrective action back to customer.
. Visit customers and suppliers as necessary to resolve
problems/concerns.
. Coordinate engineering and process changes and all other
customer requirements.
. Track and report key company performance data. Support Toyota &
TS16949 requirements.
.
Federal Mogul Corporation. Hampton, Virginia, Oct. 1999 to Nov. 2002
Tier 1 automotive manufacturer of exterior lighting systems, engine
bearings supplying to domestic automakers, commercial vehicle OEM's.
Quality Engineer
. Organize the implementation of Statistical Process Control for
the purpose of product & process conformance to specifications,
and providing manufacturing associated feedback relative to
process conformance and improvements.
. Initiate corrective actions and provide follow up on PR&R, 7-
step corrective actions implemented.
. Provide manufacturing with continuous auditing of quality,
preventive maintenance and work instructions system to assure on-
going conformance to ISO/QS-9000 standards.
. Participate in periodic visits to customer assembly plants for
review of quality related issues.
. Supervise & train 7 internal quality auditors.
NWB USA Inc. Petersburg, Virginia, USA Oct. 1997 to Oct. 1999
Automotive component manufacturer of winshield wiper
Quality Engineer
. Develop & update control plan, root-cause analysis, prepare
corrective action report
. Continual improvement, Statistical process control of
nonconforming product, Process monitoring, operator
instructions.
. Develop & update control plan, root-cause analysis, prepare
corrective action report. Implement & maintain Toyota, Honda &
Chrysler Corp's quality system requirement.
. Process sign-off (PSO) documentation. Production Part approval
process (PPAP), train inspection & calibration procedures to
inspectors.
TRAINING
Quality Assurance Training:
. Global Quality Assurance: Saitama, Japan: 4 week : training on
Root cause, Fish-bone analysis, corrective action & problem
solving methodology.
. ISO 9000:2000 Lead auditor: by Perry Johnson Inc: Herndon, VA: 1
week : Succesfully completed & passed Certified lead auditor
exam.
Safety & Ergonomics training:
. Ergonomic Design Guidelines for engineers by Humantech: 3 day
long training on Occupational and human performance ergonomics,
risk factor & NIOSH equation, OSHA guidelines.
Management Training :
. Dale Carnegi: 48 hrs training by on how to win friends, conflict
resolution, and communication.
. Other Training: Train the trainer, Effective management.
Lean/TPS Training:
. Step-1 Training: Denso, Michigan plant: 3 week long hands on
training/activity on Material information flow diagram (value
stream process mapping), MUDA (waste control), Time & motion
study analysis, Efficiency analysis, 11 step directional KAIZEN,
JIDOKA (load leveling), 5 'S', standardized work, manpower &
machine capacity calculation, 'basic control tool utilization,
one piece flow, line balancing.
. Step-2 Training: Denso Tennessee plant: 3 week long hands on
training/activity on Parts Conveyance, Efficient layout design,
Changeover improvement, KANBAN system implementation.
. TPS Training: Toyota, Kentucky plant, 3 days long training on
TPS and Toyota business practice.
.
COMPUTER SKILLS:
Software: Microsoft Excel, Access, PowerPoint, Project, Visio &
AutoCAD