David Cipollone

**** ******* **., ******, ** 32712 • •

321-***-**** abjckp@r.postjobfree.com

David Cipollone

Summary

I can offer 30+ years of highly experienced, self-motivated leadership in the heavy highway construction

industry. Jobs ranging from one million, to eighty million plus dollars. FDOT, City and County municipality

projects as well as private development. As a Project Superintendent, I can offer a well-managed, safety

conscious environment in the field, and teach the same philosophy to my team.

Experience

Mar. 2006 to Dec. 2008

Cherry Hill Construction, Inc. Bartow, FL

Project Superintendent

Responsible for day to day activities on large highway contracts

Manage multiple crews, plan and schedule work, coordinate subcontractors

Establish equipment requirements and ensure that equipment is properly serviced and maintained in the

field daily.

Maintain budget compliance and ensure that the job is complete at or under budget

Ensure project is constructed according to contract requirements per the specifications

A. Completed $22 million road-widening project for Polk County (County Road 54)

A. Widening an existing three mile stretch of two-lane rural County Road 54 to four-

lane roadway with curb and sidewalk.

B. Installation of concrete retaining walls.

C. Thirty-thousand plus square feet of permanent and temporary sheet pile.

D. Storm pipe and structure installation; full-length of the project.

E. Temporarily relocate, then reinstall of several-hundred feet of 14-inch force main.

F. Re-route and replace water mains throughout the project.

G. De-mucking to right away.

H. Install four retention ponds; two included poly-lining.

I. Lime rock-based pavement.

J. Job performed while maintaining two lanes of traffic throughout the project at all

times.

B. Completed $20+ million FDOT project in Haines City (US27)

A. Complete removal and rebuild of existing four-lane highway to six-lane highway.

B. Removal and replace of single-span bridge of CSX railway.

C. Installation of reinforced earth walls

D. Storm pipe and structure installation; full length of the project.

E. Complete rebuild of several intersections; including traffic signalization.

F. Built five retention ponds.

G. Lime rock-based pavement

H. Job performed while maintaining four lanes of traffic throughout the project at all

times.

321-***-**** • abjckp@r.postjobfree.com

David Cipollone

1978 to Mar. 2006

Hubbard Construction Co. Winter Park, FL

Project Superintendent

Responsible for day to day activities on large highway contracts

Manage multiple crews, plan and schedule work, coordinate subcontractors

Establish equipment requirements and ensure that equipment is properly serviced and maintained in the

field daily.

Maintain budget compliance and ensure that the job is complete at or under budget

Ensure project is constructed according to contract requirements per the specifications

Projects completed include:

Completed FDOT Projects:

I-95 widening and bridge rehabilitation, West Palm Beach, $83 million

Six-lane exiting highway to 8 lanes

Addition of a traffic separator in center of highway – Lime rock base and pavement.

Addition of 4 detention ponds

Widening of 3 existing overpasses

Lighting and landscape work

Addition of storm pipe, both concrete and poly

Complete removal and replacement of 6 on and off-ramps throughout the project. Closed ramps

over the weekend and completed before Monday morning rush.

Mill and resurfacing of 1-95, approximately 4 miles.

All worked performed while maintaining three northbound and three southbound lanes at all

times through the life of the project.

Completed contract three months ahead of schedule.

State Road 44, 2-lane rural to 4-lane (3 miles), Volusia County, $26 million

Complete removal of existing 2-lane rural road

Clearing and grubbing storm pipe

Heavy de-mucking 120,000 yards ranging from 3 to 40-foot depths

Import 800+/- cubic yards embankment

Lime rock base and pavement work

I-4/Florida Turnpike Interchange, Orlando, $21 million

Removal of existing 6-lane overpass at Interstate 4

Replaced with 8-lane double-span overpass

Widening existing turnpike – Storm drainage in ponds

Barrier walls, R.E. walls, and Variable Height Walls

Lime rock base and pavement work

Landscaping to right of way

I-4 Saxon Blvd. Interchange, FDOT, $22 million

Demolition of existing 2-lane, 2-span Bridge over I-4. Replaced with 6-lane, 2-span bridge with

on and off-ramps.

Installation of 3 detention ponds, earthwork with re-enforced earth walls, and storm pipes

throughout the project.

Lime rock base and pavement work.

Lighting and landscaping.

Additional Signature Projects Completed:

321-***-**** • abjckp@r.postjobfree.com

David Cipollone

Nova Road widening, Daytona Beach

Orange County Convention Center, Phase 3

Lake Underhill widening, Orange County, $12 million

Landfill Phase II, Sarasota, $45 million

I-75 Turnpike Interchange, FDOT, $30 million

I-75 widening – Wildwood, FDOT

Center Commerce, private site work, $1.3 million

Sand Lake Rd. and bridge widening, $6 million

Trinity Club School, site work, $250k

World Drive Interchange, Disney World, $27 million

I-4 reconstruction, Plant City, FDOT, $35 million

I-4 Conroy Rd. interchange, City of Orlando, $26 million

Bonnet Creek Pkwy, Disney

Vista Blvd Interchange, Disney

Dixie Landing, land-clearing contract, Disney

The French Connection, Epcot, Disney

1980 to 1988

Hubbard Construction Co. Winter Park, FL

Foreman

Responsible for managing multiple crews in large dirt moving operations.

Excavating ponds for golf courses and rough shape fairways.

Over-seeing of base crews

Excavate and install linings and back-fill of landfills

Over-see a fleet of TS24, 631, 637 scrapers, along with D6, D7, D8, D9 bulldozers.

Over-see American 797 draglines. De-mucking and heavy excavation.

Projects include, but not limited to:

Orlando Metroplex and Infrastructure, City of Orlando, $26 million

John Young Pkwy widening, Orange Country, $6 million

Orange County Convention Center, Phase 2

Disney World Drive Interchange, $25 million

Hunter’s Creek Golf Course and Site Development

US Airforce Dump Restoration/McCoy Airforce Base, Orlando

Education

Edgewater High School Graduated 1978

Military Service

1977-1979; Military Reserve 1980 – 1988

MOS 12 Bravo Combat Engineer Battalion

A. Bridge building

B. Heavy excavation and road building

C. Drove dump trucks and transports hauling heavy equipment

Left military with honorable discharge as rank E5 Sergeant