321-***-**** • abjckp@r.postjobfree.com
David Cipollone
**** ******* **., ******, ** 32712 • •
321-***-**** abjckp@r.postjobfree.com
David Cipollone
Summary
I can offer 30+ years of highly experienced, self-motivated leadership in the heavy highway construction
industry. Jobs ranging from one million, to eighty million plus dollars. FDOT, City and County municipality
projects as well as private development. As a Project Superintendent, I can offer a well-managed, safety
conscious environment in the field, and teach the same philosophy to my team.
Experience
Mar. 2006 to Dec. 2008
Cherry Hill Construction, Inc. Bartow, FL
Project Superintendent
Responsible for day to day activities on large highway contracts
Manage multiple crews, plan and schedule work, coordinate subcontractors
Establish equipment requirements and ensure that equipment is properly serviced and maintained in the
field daily.
Maintain budget compliance and ensure that the job is complete at or under budget
Ensure project is constructed according to contract requirements per the specifications
A. Completed $22 million road-widening project for Polk County (County Road 54)
A. Widening an existing three mile stretch of two-lane rural County Road 54 to four-
lane roadway with curb and sidewalk.
B. Installation of concrete retaining walls.
C. Thirty-thousand plus square feet of permanent and temporary sheet pile.
D. Storm pipe and structure installation; full-length of the project.
E. Temporarily relocate, then reinstall of several-hundred feet of 14-inch force main.
F. Re-route and replace water mains throughout the project.
G. De-mucking to right away.
H. Install four retention ponds; two included poly-lining.
I. Lime rock-based pavement.
J. Job performed while maintaining two lanes of traffic throughout the project at all
times.
B. Completed $20+ million FDOT project in Haines City (US27)
A. Complete removal and rebuild of existing four-lane highway to six-lane highway.
B. Removal and replace of single-span bridge of CSX railway.
C. Installation of reinforced earth walls
D. Storm pipe and structure installation; full length of the project.
E. Complete rebuild of several intersections; including traffic signalization.
F. Built five retention ponds.
G. Lime rock-based pavement
H. Job performed while maintaining four lanes of traffic throughout the project at all
times.
321-***-**** • abjckp@r.postjobfree.com
David Cipollone
1978 to Mar. 2006
Hubbard Construction Co. Winter Park, FL
Project Superintendent
Responsible for day to day activities on large highway contracts
Manage multiple crews, plan and schedule work, coordinate subcontractors
Establish equipment requirements and ensure that equipment is properly serviced and maintained in the
field daily.
Maintain budget compliance and ensure that the job is complete at or under budget
Ensure project is constructed according to contract requirements per the specifications
Projects completed include:
Completed FDOT Projects:
I-95 widening and bridge rehabilitation, West Palm Beach, $83 million
Six-lane exiting highway to 8 lanes
Addition of a traffic separator in center of highway – Lime rock base and pavement.
Addition of 4 detention ponds
Widening of 3 existing overpasses
Lighting and landscape work
Addition of storm pipe, both concrete and poly
Complete removal and replacement of 6 on and off-ramps throughout the project. Closed ramps
over the weekend and completed before Monday morning rush.
Mill and resurfacing of 1-95, approximately 4 miles.
All worked performed while maintaining three northbound and three southbound lanes at all
times through the life of the project.
Completed contract three months ahead of schedule.
State Road 44, 2-lane rural to 4-lane (3 miles), Volusia County, $26 million
Complete removal of existing 2-lane rural road
Clearing and grubbing storm pipe
Heavy de-mucking 120,000 yards ranging from 3 to 40-foot depths
Import 800+/- cubic yards embankment
Lime rock base and pavement work
I-4/Florida Turnpike Interchange, Orlando, $21 million
Removal of existing 6-lane overpass at Interstate 4
Replaced with 8-lane double-span overpass
Widening existing turnpike – Storm drainage in ponds
Barrier walls, R.E. walls, and Variable Height Walls
Lime rock base and pavement work
Landscaping to right of way
I-4 Saxon Blvd. Interchange, FDOT, $22 million
Demolition of existing 2-lane, 2-span Bridge over I-4. Replaced with 6-lane, 2-span bridge with
on and off-ramps.
Installation of 3 detention ponds, earthwork with re-enforced earth walls, and storm pipes
throughout the project.
Lime rock base and pavement work.
Lighting and landscaping.
Additional Signature Projects Completed:
321-***-**** • abjckp@r.postjobfree.com
David Cipollone
Nova Road widening, Daytona Beach
Orange County Convention Center, Phase 3
Lake Underhill widening, Orange County, $12 million
Landfill Phase II, Sarasota, $45 million
I-75 Turnpike Interchange, FDOT, $30 million
I-75 widening – Wildwood, FDOT
Center Commerce, private site work, $1.3 million
Sand Lake Rd. and bridge widening, $6 million
Trinity Club School, site work, $250k
World Drive Interchange, Disney World, $27 million
I-4 reconstruction, Plant City, FDOT, $35 million
I-4 Conroy Rd. interchange, City of Orlando, $26 million
Bonnet Creek Pkwy, Disney
Vista Blvd Interchange, Disney
Dixie Landing, land-clearing contract, Disney
The French Connection, Epcot, Disney
1980 to 1988
Hubbard Construction Co. Winter Park, FL
Foreman
Responsible for managing multiple crews in large dirt moving operations.
Excavating ponds for golf courses and rough shape fairways.
Over-seeing of base crews
Excavate and install linings and back-fill of landfills
Over-see a fleet of TS24, 631, 637 scrapers, along with D6, D7, D8, D9 bulldozers.
Over-see American 797 draglines. De-mucking and heavy excavation.
Projects include, but not limited to:
Orlando Metroplex and Infrastructure, City of Orlando, $26 million
John Young Pkwy widening, Orange Country, $6 million
Orange County Convention Center, Phase 2
Disney World Drive Interchange, $25 million
Hunter’s Creek Golf Course and Site Development
US Airforce Dump Restoration/McCoy Airforce Base, Orlando
Education
Edgewater High School Graduated 1978
Military Service
1977-1979; Military Reserve 1980 – 1988
MOS 12 Bravo Combat Engineer Battalion
A. Bridge building
B. Heavy excavation and road building
C. Drove dump trucks and transports hauling heavy equipment
Left military with honorable discharge as rank E5 Sergeant
321-***-**** • abjckp@r.postjobfree.com
David Cipollone
References
References are available on request.