Post Job Free
Sign in

Manager Design

Location:
Moody, AL, 35004
Posted:
October 07, 2010

Contact this candidate

Resume:

DENNIS LETCHER

** ********* ****

MOODY, AL. ****4

205-***-****

SUMMARY OF EXPERIENCE

Twenty 23 years plus experience using automated drafting systems to

prepare design drawings for nuclear power plants, pulp and paper

mills, foundries, wastewater treatment plants, and steel fabrication

of equipment. Experience includes time on APPLICON, CALMA, AutoCAD,

MICRO STATION, PRIMAVERA, and INTERGRAPH systems. Drafting experience

includes electrical, mechanical, civil, concrete, and structural

steel, steel detailing, piping and ductwork drawings as well as flow

charts, manpower charts, mapping and surveying.

Design experience includes steel detailing, shop drawings, field

design, cable tray layouts and cable sizing, routing and lighting,

civil site layout and 3-D analysis of steel constructed buildings.

Design 3-D steel drawings, structural steel detailing, piping layout

and design, mechanical equipment layout, and ductwork details. Design

and assemble target drones for air force governments around the world

and design and detail valves and operators for commercial use. Design

conveyors and foundry equipment layouts.

Extensive experience doing walk downs at nuclear power plants and

some fossil fuel and paper mill plants.

PROFESSIONAL EXPERIENCE

M & J MATERIALS - Trussville, Alabama (DIRECT)

MARCH 2001 - PRESENT

Checker and steel detailer on

miscellaneous buildings and add-ons on existing buildings. Checked all

drawings for approval with customer and correct as needed.

Check shop drawings and work with customer on installation of

steel pieces. Job is fast pace with quick turn around time. All work was

done using Windows 98 and AutoCAD 14.

BIRMINGHAM DRAFTING - Trussville, Alabama (CONTRACT)

JANUARY 2001 - MARCH 2001

Steel detailer and designer on miscellaneous buildings and add-

ons on existing buildings. Checked customer drawings and

corrected as needed per customer comments. Job was fast pace

with quick turn around time. All work was done using Windows

98 and AutoCAD 2000LT.

VULCAN ENGINEERING - Helena, Alabama (CONTRACT)

MAY 2000 - NOVEMBER 2000

Steel detailer and designer on conveyors and foundry

equipment. Checked on all equipment and conveyors for fouls

and resolved the problems. Did civil site work for new

addition of plant. Worked with shop to resolve any problems on

conveyor or steel drawings. Job was fast pace and with 60 to

70 hours a week. All work was done using Windows 98 and

AutoCAD 2000.

THOMPSON FABRICATING - Tarrant, Alabama (DIRECT)

OCTOBER 1999 - MAY 2000

Steel detailer on wastewater treatment plants. They used

steel and aluminum to fabricate stairs, platforms, and

handrails along with miscellaneous steel supports. Also did

layout of some plant equipment requiring civil site work. All

work was done using Windows NT and AutoCAD 2000.

CRANE VALVES - Tarrant, Alabama (DIRECT)

FEBRUARY 1998 - OCTOBER 1999

Senior designer in production and engineering

department on wedgeplug valves. Crane bought Stockham valves

and rolled me over as a direct employee. I'm responsible for

all drawings, material test reports, x-ray, and bill of

material checking. Work with customers detailing steel frames

and supports for valve installation. All work was done using

Windows NT and AutoCAD14 and 2000.

STOCKHAM VALVES - Birmingham, Alabama (CONTRACT)

APRIL, 1997 - FEBRUARY 1998

Senior designer in production and engineering

department on all types of valves and fittings. I worked

closely with the foundry to resolve any problems they may

have. I did all detailed steel for customer drawings for bid

or purchase and revised the way Stockham did drawings. All

work was done using Windows 95 and AutoCAD 13.

PEMCO INC. (HAYES TARGET) - Leeds, Alabama (DIRECT)

DECEMBER 1996 - MARCH 1997

Design and detailed parts for target drones on

AutoCAD 13 then fabricated parts and fit tested them on

targets to develop new and more cost effective ways to make

targets. I was temporary here while the strikers were out on

strike. I worked in the cad room, machine room, testing lab

and assembly room.

KERCHEVAL ENGINEERS - Birmingham, Alabama (DIRECT)

MAY 1994 - OCTOBER 1996

Design, detailing, and layout of

telecommunication towers for BellSouth, Sprint, GTE, and

Southern Company Services, and others. Site grading, building

location, towers location, steel detailing, and cable routing

using AutoCAD 13 for windows 95. All sites completed on a

fast pace turn around time.

BROWN & ROOT - Pamana City, Florida (CONTRACT)

SEPTEMBER 1993 - APRIL 1994

Field designer and detailer at Stone Container

paper mill plant. Retrofitted chemical pipelines with new

stainless steel lined pipe. Field measurements were made then

transferred to CAD for shop and fabrication drawings. Other

field updates were done from rewiring MCC's to supervising

welding on the debarkers.

MACO INDUSTRIES - Pell City, Alabama (DIRECT)

JULY 1992 - AUGUST 1993

Design, detailing and review of all sawmill

equipment for lumber companies. Worked with client and/or

vendors to develop general design. Worked closely with

fabrication shop to resolve problems as the arose.

Responsible for all system maintenance, plotting and back up

procedures related to AutoCAD 12.

COMBUSTION ENGINEERS COMPANY - Birmingham, Alabama (CONTRACT)

FEBRUARY 1990 - JUNE 1992

Worked in Mechanical department on cad using

CALMA to create and revise piping drawings for Old Dominion

Electric Company. Duties include design piping, checking, and

vendor drawing review. Also worked in electrical department

using CALMA and AutoCAD to revise logic drawings and to

create terminal block connection diagrams, single line,

digital and analog logic diagrams, and P&ID drawings for

Montana-Dakota Utilities.

FORD, BACON & DAVIS - Monroe, Louisiana (CONTRACT)

MAY 1989 - DECEMBER 1989

Worked in Electrical department on cad using

MICRO STATION to create motor connection diagrams, single

lines, motor control centers, conduit and cable tray

schedules, and field connection diagrams for Georgia Pacific

paper mill.

SOUTHERN COMPANY SERVICES - Birmingham - Alabama (DIRECT)

APRIL 1978 - MARCH 1989

January 1988 - march 1989 on site at Plant Hatch

Vidalia, Georgia

Solely responsible for clearing request for additional used to

close as built notices. The job required knowledge of

equipment and system locations within the plant as well as

knowledge of sources of documentation needed to close the

ABN. All work resulted in reports to the Nuclear Regulatory

Commission, Inpo, Georgia Power, and Southern Company

Services so as to resolve their request of open ABN. I worked

alone on this project without direct supervision and

unlimited access to the plant with full security clearance.

February 1987 - January 1988

Learned AutoCAD and INTERGRAPH CAD systems. Mapped and labeled

Georgia Power Company transmission lines using a CALMA CAD

system. Participated in walk downs of distribution panels and

motor control centers, prepared as-built notices to document

the results, and produced flow charts, single line, and

piping drawings for the Plant Hatch project.

May 1984 - February 1987

Learned CALMA system and used it to produce 3-D structural

steel, ductwork, and piping drawings from specification

sheets. This required a working knowledge of three-

dimensional modeling and stress analysis.

April 1978 - May 1984

Learned APPLICON 870 and 880 systems. Prepared electrical,

structural steel, piping, and instrumentation drawings.

Trained other new operators on how to use this system.

HARLEY DAVIDSON OF BIRMINGHAM - Birmingham, Alabama (DIRECT)

FEBRUARY 1976 - MARCH 1978

Responsible for inventory control of parts and

vehicles for the dealership. Moved for Parts Manager to

Inside Sales Manager during this time.

RUST ENGINEERING COMPANY - Birmingham, Alabama (DIRECT)

JULY 1973 - JANUARY 1976

Worked in Electrical and Mechanical departments

as a manual board drafter revising motor control centers,

single lines, and piping drawings. Laid out lighting in plant

and control room for various paper mills. Duties included

back checking and interfacing with other departments.



Contact this candidate