Post Job Free
Sign in

Project Manager Engineer

Location:
Las Vegas, NV, 89118
Posted:
October 05, 2010

Contact this candidate

Resume:

OBJECTIVE

Seeking a challenging, responsible and rewarding position

in an innovative environment where I can utilize my

academic, technical knowledge and managerial skills.

Education

Bachelor of Technology - Nagarjuna University - Major: Civil Engineering

08/96 - 05/00

Master of Engineering - Lamar University at Beaumont, Beaumont, Texas,

Major: Civil Engineering Degree

01/02 - 12/03

Work Experience

Engineering Intern/Project Manager - Geotechnical and Environmental

Services (GES), Las Vegas, Nevada

05/06 -

07/10

Design:

. Worked with multiple project engineers and managed geotechnical

engineering projects in residential, public and commercial sectors

including schools, design of bridges, embankments, detention ponds,

flood control improvements, erosion and grade control structures,

utility facilities, pipelines, pump stations, reservoirs, parking

structures, runways, and commercial developments.

. Performed engineering analyses for the design of drilled shafts, driven

piles, shallow and spread footings, mat foundations, slope stability,

settlements, lateral earth pressures, and flexible and rigid pavement.

. Managed field operations, which included subsurface exploration program,

soil samples procurement, obtaining access to the project locations and

utility clearances, accurate location of exploration sites, safety

health plan, data analysis and interpretation.

. Extensive knowledge of logging of subsurface soils in Las Vegas Valley

and Clark County

. Prepared geotechnical engineering services proposals

. Obtained encroachment permits for City of Las Vegas, City of North Las

Vegas, City of Henderson, Clark County, NDOT, and Bureau of Land

Management (BLM)

. Reviewed all project documents for content, format, typing, and

adherence to company policies, and reviewed all work produced by the

field technicians, and staff engineers within the geotechnical

department.

. Completed over 200 reports for single family residences, residential

subdivisions, public works, and commercial projects.

Construction:

. Managed and supervised multiple residential, public, and commercial

projects during construction.

. Reviewed field daily reports during grading operations and for both off-

site and on-site testing and submitted final letters including select

backfill, suitability of Type II, and trench backfill.

. Managed and supervised QAA and QC projects during and after

construction, submitted umpteen padcert and padrecert letters, final

grading reports, and final QAA letters.

. Attended kick off and construction meetings, assisted contractors during

construction.

. Prepared construction proposals for different projects including

residential, public, and commercial sectors, quantity take-offs, and

work orders.

. Supervised field technicians and also performed observations and testing

during construction including, post-tensioned cable layout, reinforcing,

concrete placement, concrete cylinders, post-tensioned cable stressing,

Hardy frames, and epoxy installations.

Staff Engineer- Arroyo Geotechnical (Willdan Group of Companies),

Anaheim, California

06/04 - 04/06

. Managed geotechnical and drilling services involving subsurface

exploration, logged soil samples by using hollow-stem augers and mud

rotary, interpretation of CPT data, and lab testing.

. Performed geotechnical engineering analysis and design services for a

variety of projects under the supervision of Professional Engineers.

. Performed field and laboratory testing programs to provide the data

needed to recommend the type and depth of suitable foundation systems

for various types of projects, liquefaction, allowable bearing

capacities, lateral earth pressures, seismic site classification, and

assisted in preparing geotechnical evaluation reports.

. Supervised laboratory testing and field inspections, and reviewed all

work produced by the field technicians within the geotechnical and

construction materials testing department.

. Performed soil compaction testing, footing observations, concrete

sampling and testing, reinforcement placement observations.

. Performed several laboratory soil tests, including density and moisture

content, gradation, plasticity, standard and modified proctor,

shrinkage, consolidation, expansivity, direct shear strength, sand

equivalent, hydrometer, and unconfined compressive strength test.

Research/Teaching Assistant - University of Texas at El Paso, TX

08/01 - 01/02

. Worked as research assistant on GIS for community and street layout.

. Worked on AutoCAD and supervised undergraduate students.

Representative Project Experience

. City Hall Parking Garage, Las Vegas, Nevada: Engineering Intern during

design of a 700 space concrete parking garage structure. The parking

garage structure will have an at-grade level with four raised levels. I

located and logged borings and supervised and coordinated to perform

ground penetrating radar to locate suspected buried transite pipes,

excavate potholes along the suspected transite lines. I assigned

laboratory tests and performed engineering analyses and prepared a

design level report.

. Nellis Air Force Base F-35 Flight Simulator Facility, NAFB, Nevada:

Performed a site reconnaissance, obtained an encroachment permit,

coordinated and logged all the borings, reviewed laboratory data,

performed engineering calculations for bearing capacity, spread footings

and slab-on-grade, lateral earth pressures, and non-dedicated asphalt

pavement sections. Prepared a design level geotechnical recommendation

report.

. Las Vegas Blvd Neon Signs Project- Phase I and II, Las Vegas, Nevada: As

part of the Project six neon signs were installed in the median island

along Las Vegas Blvd and the signs were up to 43 feet in height. I

obtained encroachment permit and oversaw traffic control plan, and

performed USA locate and logging of all boring and oversaw potholing

services by using an air-knife to 5 feet below the pavement surface.

Assigned and reviewed laboratory test results, provided engineering

parameters including axial shaft capacities, bearing capacity and soil

corrosivity, and prepared a design report.

. Anthem at Mesquite, Mesquite, Nevada: Project consisted of the design

and construction of a large-scale, approximately 2,000 acre master-

planned community of single lots residential subdivisions and associated

improvements such as golf courses, club houses, soccer field complex,

commercial site improvements, retaining walls, rockery walls, right-of-

way improvements, and installation of underground utilities. As an

Engineer Intern, performed a site reconnaissance, staking and by using

Underground Service Alert (USA), obtained clearance to the proposed

borings. In addition, I performed all the logging activities for all the

borings and assigned laboratory tests on collected soil samples and

reviewed related geologic maps, laboratory test results, and drafting. I

also performed engineering analyses/calculations for bearing capacity,

lateral earth pressures, allowable and differential settlements, slope

stability analysis for slopes retaining up to 60 feet, swell potential,

seismic site classification, and flexible and rigid pavement sections.

Upon completion of the laboratory tests and engineering analyses, I

prepared the design level geotechnical evaluation reports for each

subdivision.

. CCWRD AWT Membrane and Ozonation Plant, Clark County, Nevada: Project

consisted of a 30 mgd membrane filtration and ozone disinfection

facility. The 30 mgd pilot facility also consisted of flash mix,

influent flow metering, and influent control vaults, screens and an

emergency bypass structure, and two 84-inch diameter and two 96-inch

diameter underground pipes and associated improvements. I performed a

site reconnaissance, coordinated and logged all the borings, assigned

and compiled laboratory data and finally prepared a design geotechnical

report.

. Groundwater Analyses for the Pittman Wash between Valle Verde Dr and

Sandwedge Channel, Henderson, Nevada: As an Engineering Intern

supervised installing three temporary monitoring wells, purging and

sampling of groundwater in three (3) 2-inch diameter wells. Prepare a

summary letter of field activates and laboratory analyses.

. Anthem at Mesquite, Wagon Trail Subdivision, Mesquite, Nevada: The

Wagon Trail subdivision is a portion of the large-scale, 2,000 acre

master-planned community. Supervised and coordinated the field

technicians during construction and mass grading observations of this

project. I reviewed field daily reports for both off-site and on-site

testing. The off-site testing included field moisture and density

testing of trench backfill for underground utilities including sanitary

sewer, storm drain, waterline, and gas line. I submitted weekly activity

reports to the City of Mesquite during the construction activities and

prepared a final off-site report at the conclusion of the project. The

on-site testing and observation included observation of structural fill

placement, structural steel reinforcement, and concrete placement of

masonry retaining walls, and rockery walls. I submitted a final grading

report, a final masonry retaining wall report, and a final rockery wall

report with all pertaining data to the client and the City of Mesquite.

. Southern Nevada Water Authority (SNWA) Pipeline Groundwater Development

Project along Clark, Lincoln and White Pine Counties: The project was to

locate the proposed borings locations and perform a site reconnaissance

to SNWA along the proposed approx. 250 miles pipeline. I was responsible

for reviewing related geological maps, GIS drawings along with preparing

the reconnaissance report and assisted SNWA in obtainment of a BLM

permit for the proposed pipeline.

. Tropicana Mega Resort, Las Vegas, Nevada: The proposed project consists

of the construction of 4 new hotel and condominium towers between 30 and

40 stories high built around the two existing Tropicana Hotel towers. I

reviewed boring logs, reviewed engineering evaluations to determine pile

load, depth of foundation and performed calculations for drill shaft

material foundation and assisted in the preparation of the geotechnical

investigation report.

CERTIFICATIONS/REGISTRATIONS/TECHNICAL TRAINING

. Professional Engineer (Nevada)

. ACI Concrete Field Testing Technician- Grade I

. American Society of Civil Engineers and Young Members Forum

. Air Quality Dust Control Certification, Nevada

. Nuclear Gauge Use & Radiation Safety Training, Certified

. OSHA 40 Hour Hazwoper Training, Nevada, 2009

. 10-Hr OSHA Training Course in Construction Safety and Health, Nevada,

2009

COMPUTER SKILLS

Microsoft Office, AutoCAD, Gstabl, Winpas, Gpile, GeoSystems, gINT, STABL,

EQLique & Settle, ARCGIS, and Windows Operating systems.

REFERENCES

. Available up on request.



Contact this candidate