D.Krishnamurthy.
Saint Peters
Missouri-63376
abiz33@r.postjobfree.com
OBJECTIVE
To pursue career in industrial automation and training in hi-tech
environment with increasing responsibilities
At present attending school in .Net platform.
PROJECT EXPERIENCE
SENIOR CONTROL SYSTEM SPECIALIST
Joined Maverick Technologies in Jan 2008 as senior control system
Specialist
Programming Rockwell control Logix5000 V13,14,15,16,17,Function block
programming, ADD ON instruction Programming, Control Configuration, VFD
Power Flex commissioning Net, Factory Talk SE, HMI, SCADA, DCS, IFIX
Applications. The Process involves Narrative Review, Corrections, HMI
development, Customer Approval of Screens, Logic development, In house
Factory Acceptance Test, FAT with Customer, Site installation, Startup,
Device Checkout, sequence Checkout, Debug lf needed, Update narrative,
Train Customer and operators. I have done startup for Fermentation,
Alcohol, Ethanol, Wet mill, Refinery, Waste Water treatment, Biothane,
projects for TATE&LYLE Loudon TN. Project includes Configuring Factory Talk
Server, HMI servers, Data Servers, OSI PI Server, and factory talk SE 5.0
(CPR9), Alarm Servers. Prepare data from Process to a Readable format for
MES applications which are used for inventory, Federal state local
compliance, Downtime analysis, cost, customer, vendor, information and
process continuous improvements tasks.
.
Tier one Machine Tool
2007
(Vendor for Ford and Chrysler in Canada)
CONTRACT PROGRAMMER
Duties involve RSLOGIX 5000, SIEMENS HMI WinCC Flexible, TCP/IP
configurations and Device net configurations.
Device Net for Control Logix and Guard Logix. Program Guard Logix
Debugging, implementing and installing at customer site, providing start-up
support.
Prepare tags for MES applications such as FIS (Factory Information System)
Reason for Leaving: Contract Completion
Beta Raven div of California Pellet Mills (C.P.M.)
St. Charles, MO 2006-2007
(The world's leading supplier of processing equipment to the animal feed,
oilseed, biofuels, food processing, and plastics compounding industries)
CONTROL SYSTEM Project manager & tech.
Program process control machinery using RSLOGIX 500, RSVIEW32, and Control
Logix 5000
. Six Feed Mill Projects creating touch screens using the list of
machines in production, and writing the programs used by the
Operators and Control Room:
1. ADM
2. NOVUS - Unique Prosperity Technology used in their reactors,
incinerators, and chemical processes
3. FORSYTH
4. GOLDKIST
5. PURDUE
Reason for Leaving: Contract Completion
Ford Motor Corporation
Hazelwood, MO
1994-2006
JOURNEYMAN ELECTRICIAN
Maintain and install industrial electrical equipment.
. Trouble shoots Robotic Controllers, Programmable Controllers,
Variable Speed Drives, Body Shop Welding Equipment, and AC/DC Motor
Controls.
. Program PLC 5, SLC 500 Controllers in RS LOGIX 5.500.
. Also functioned as Launch Team Member and Team leader
Reason for Leaving: Plant Closure
Independent Contractor
St. Peters, MO
1992-1994
CONTROL SYSTEM PROGRAMMER
. Auto Flex integram Modified their PLC
program for Cycle time (automotive interior)
. Borden Pasta Programming and
start up of new plant.
. Davidson Interior Start up of new
plant (automotive interior)
. Trade Waste Incinerators Start up of new incinerator.
SIRI Enterprises Grocery Store
DesPeres, MO 1989-1992
OWNER
I have owned and operated an ethnic grocery store in St.Louis community.
. Analyzed the market and its needs for products, which gave a great
boost to the business.
. Innovative ideas of providing products that were not available at
that time.
. Personal innovative contribution of growth of start-up of new
products introduced to USA
. Of Indian produce market here in the Midwest by leasing and growing
produce in the Midwest, which at that time was not done.
. Marketing and Merchandising skills attributed Washington University
education
Reason for Leaving: Sold business at a profit
GM Corporation
Freemont, CA and Wentzville, MO 1976 to 1989
MAINTENANCE SUPERVISOR
JOURNEYMAN ELECTRICIAN
WELDING AND EQUIPMENT REPAIR
Maintain controllers and all associated machinery. Also worked as team
coordinator.
. Supervisor of thirty (30) skilled workers.
. Responsible of the new construction and installation of multimillion
dollar project, which I completed before schedule.
Reason for Leaving: Company downsize, accepted a Buy-Out Package
Pacific State Steels Corporation
Union City, CA 1974 to 1976
JOURNEYMAN ELECTRICIAN
Maintain AC/DC overhead cranes, repairing motors, starting balancing
shutting down powerhouse machinery and maintain locomotive diesel engines.
EDUCATION
Pre engineering Annamalai University
Electrical Engineering
University of Madras (BE)
Documentation available upon request
Extensive Training in: Programmable controllers, Robotics, Hydraulics, and
Welding Machinery Extensive Training and Certification in: Automation and
Industrial Safety