OLIVER M. VALENCIA
****W Westhaven Drive
Anaheim, CA 92804
E-mail:abiv9r@r.postjobfree.com
PROFESSIONAL EXPERIENCE
March 2007 to May 2010: AL ARRAB TRADING AND CONTRACTING COMPANY
Designation: Electrical Quality Control
Project Handled: The Pearl Qatar
Porto Arabia, Tower 9A (27 Storey), Doha, Qatar.
Scope of work: Installation of Electrical Lighting, Power and Extra Low
Voltage System
Job Description: In-charge as Quality Control inspector and Coordinator for
the supply and installation of Electrical Lighting,
Power and Extra Low Voltage System. Reviewed shop
drawing submitted by sub-contractor and provide a
comments prior for Consultants approval. Issued
progress inspection report (PIR) to the sub-
contractor to for those installations with poor
workmanship or delivered materials which are not in
accordance with the project specification. Attending
the request for inspection (RFI) submitted by the sub-
contractor and see to it that the installation are in
accordance with the approved shop drawing issued for
construction and the materials are approved for
installation. Prepare a weekly
progress/accomplishment report. Organize a
coordination meeting with the sub-contractor for the
proper implementation of work.
March 2004 to May 2006: TAMAS ELECTRO MECHNICAL COMPANY
Designation: Project Engineer
Project Handled: Construction of MTD Workshop Package, (Al Kafji) K.S.A.
Scope of work: Principal Contractor of SAUDI OGER LTD for the Supply and
Installation of Plumbing works and Fire Protection
System.
Job Description: Directly reporting to General Manager of the company.
Prepare a quantity take off and request for quotation
for bidding and deliver purposes. Organize materials
submittals and shop drawings prior for consultant
approvals. Fully responsible for execution of all
plumbing and fire protection works at the
construction site and ensure that these works are in
accordance with the specification and latest drawing
issued for Construction and meets the highest quality
standard. Organize a manpower loading and daily work
activities. Attend daily inspection/coordination
meeting on site to ensure that the work are properly
implemented and on progress. Prepare a weekly and
monthly accomplishment report and transmit to Saudi
Oger planning engineer for their project assessment
and report.
Project Handled: Saudi Telecom Company K.S.A.
Scope of work: Supply and Installation of Fire Detection and Alarm System
Job Description: Prepare a material specification and generate a Fire
Detection and Alarm System Design and transmit to
client for approval. Prepare a quantity take- off and
purchase order prior for installation. Organize a
manpower loading, daily work activities and project
report. Conduct a testing and commissioning together
with the client representative and prepare as-built
drawings, operation and maintenance manual to be
transmitted to the client upon completion of the
project.
Project Handled: Saudi Telecom Company K.S.A.
Scope of work: Installation of Access Control and Security
System
Job Description: Responsible for the proper implementation of for
Construction drawing. Supervising and inspecting the
actual site condition and see to it that the plans
and specification are properly implemented
Aug. 2000 to Feb. 2004: EMERALD SALES CENTER CORPORATION
Designation: Project In-charge
Project Handled: New Medical City (14 Storey Nursing Tower, 18 Storey
Medical Tower) Ortigas, Pasig City
Shangri-La Mall (6 Storey) Mandaluyong, Pasig City, Character
Monument, Tagaytay City
Philam Life Tower (level 33 & 34) Paseo de Roxas, Makati City
Power Plant Mall (3 Storey) Rockwell Center, Makati City,
Philippines
Scope of work: Supply and Installation of Lighting Fixture and Dimming
System
Job Description: In-charge for the project execution of dimming system and
different types of exterior and interior lighting
fixture. Prepare proposal, catalogs, specification
sheet and actual samples subject for Architect
approval. Prepare purchase order and delivery
schedule upon approval. Prepare a shop
drawing/mounting details and installation procedures
for approval prior for installation. Conduct a
training and orientation to our subordinate to
identify the different types of lighting fixture and
installation method. Attend coordination meeting with
the general contractor from time to time. Conduct
daily internal coordination meeting for proper
execution of work concerning planning and forecast,
daily work activities, manpower loading, manpower
work schedule, safety, material request, inventory,
hiring and termination of manpower and other crucial
issue concerning General Contractor Owner
representative announcement, rules and regulation.
Provide a monitoring chart/accomplishment report to
be presented to General Contractor for project
assessment and billing purposes. Transmit a reply
letter against General Contractor and other trade
correspondence concerning back charges, behind
schedule, priority area and other major issues.
Conduct preliminary and final testing and
commissioning together with the owner representative
Prepare and transmit hand over documents to the owner
upon completion of the project.
Jun. 1999 to Jul. 2000: RIDER HUNT LIACOR, INC.
Designation: EE Quantity Surveyor
Project Handled: Nestle Administration Building (13 Storey), Rockwell
Center, Makati City, Philippines
Scope of work: Installation of Electrical Lighting, Power and Auxiliaries
System
Job Description: Reviewing contract and documents for those awarded
packages. Prepare an evaluation, recommendation and
contract to be presented to Project Manager for
awarding the package to those qualified
Contractor/Supplier with competitive proposal.
Conduct a plant or warehouse inspection for billing
purposes. Monitoring of Electrical works and provide
an assessment report to be presented to Project
Manager. Organized a coordination meeting and conduct
an actual quantity survey/inspection of
contractor/suppliers for delivered materials,
variation claims and billing prior to recommend
payment. Evaluate and negotiate the Contractor &
Supplier quotation, variation claim and request for
time extension. Secure all requirements prior to
recommend releasing of final payment.
Aug. 1998 to Feb 1999: SUMISETSU PHILIPPINES, INC.
Designation: Electrical Project Engineer
Project Handled: Tosoh, Lima Apartment, Manila Bulletin, SB Flex, Santech,
NEC, Rex, Showa, Dowa, Eiwa, CNSI, P-Imes and CMCP
Industrial Bldg. Batangas City, Cavite City & Manila.
Philippines
Scope of work: Installation of Electrical Lighting, Power and Auxiliaries
System
Job Description: Direct and Indirect supervision. Prepare Electrical design
and interpret all technical details on plan to be
implemented during constructions period. Prepare
budgetary estimate and make alternative scheme that
would keep over all cost within reasonable budget
while attaining the intended performance of the
project. Responsible for manpower report and manpower
required to finish the project on time. Prepare cost
estimate for additional and deductive Electrical
works. Evaluate supplier quotation and prepare
delivery schedule chart for both local and imported
items. Prepare specification sheet, sample of
materials for approval and hand over documents such
as spec sheet/catalog as-built, test reports,
operational and maintenance manual.
Apr. 1994 to Aug. 1998: CPS ELECTRIC CORPORATION
Designation: Electrical Project Engineer / Junior Designer and
Estimator
Project Handled: Antel Seaview Tri-Tower (20 Storey each), M. Roxas Blvd.
Pasay City
Antel 2000 (27 Storey), Valero St, Makati City,
Alpha Salcedo (29 Storey), Alpharo St. Makati City,
Philippines
Scope of work: Installation of Electrical Lighting, Power & Aux System /
Design and Estimate Electrical Lighting, Power & Aux. System
Job Description: Directly reporting to the President of the Company. Fully
responsible for execution of all Electrical works at
the construction site and ensure that these works are
in accordance with the specification and latest
drawing issued for Construction and meets the highest
quality standard. Organize a manpower loading; daily
work activities, procurements of materials, tools,
equipment. Formulate S-Curve, Bar Chart, Cash Flow,
PERT-CPM, Shop Drawings, As-Built Plan, Progress
Billing and cost estimate for additional and
deductive Electrical works. Ensure proper testing and
commissioning procedures. Attend regular meetings
together with the Client, Architect and Owner
representative and with all Engineers of various
trades/disciplines as to the needs and requirements
of the project. Coordinate closely with MERALCO and
PLDT CO. concerning their requirements, application
and service connections. Secure Electrical permit and
Certificate of Electrical Inspection. Review
plans/drawing, specification and prepare a
proposal/quotation, bill of materials, and cost
estimate for bidding and delivery purposes. Evaluate
bidder/supplier quotations and prepare comparison
sheet. Organize a complete Electrical design and
material specification for residential and commercial
buildings. Represent our Company in pre-bid
conference.
Jan. 1993 to Apr. 1994: HANIL DEVELOPMENT CO., LTD.
Under Management of Advance Engineering Corp.
Designation: Junior Project Engineer
Project Handled: Royal Saudi Air Base. Tabuk, Kingdom of Saudi Arabia
Scope of work: Installation of Electrical Lighting, Power and Aux. System
Job Description: Responsible for the proper implementation of for
Construction drawing. Supervising and inspecting the
actual site condition and see to it that the plans
and specification are properly implemented.
Coordinate closely to General Contractor regarding
the execution of work. Organize daily work activity
and distribution of manpower. Conduct testing and
commissioning and prepare various significant
documents/reports.
Jan. 1991 to Jan. 1993: ADVANCE ENGINEERING CORPORATION.
Designation: Field Engineer
Project Handled: Makati Shangri-La Hotel (28 Storey), Ayala Ave., Makati
City, Philippines
Scope of work: Installation of Electrical Lighting, and Power System
Job Description: Responsible for the proper implementation of Electrical
works presented by Senior Electrical Engineer.
Organize daily manpower and work schedule. Prepare
accomplishment report. Coordinate with other trade
contractor concerning obstruction, permits etc.
EDUCATIONAL ATTAINTMENT
College Education: Holy Angel University October 1990
Degree: Bachelor of Science in Electrical Engineering
SKILLS
1. Supervision
2. Computer Literate