Commercial Construction Experience

I am looking for a position as a Project Superintendent. I have over 29

years experience in commercial construction and 15 years as a Project

Superintendent. I have experience in many different types of construction

from Hospitals, Bio-Safety Research Laboratories, University Academic

Buildings, and Occupied School Campuses.

Currently I am also the Safety Director for FA Nunnelly besides being the

Superintendent at the City of San Antonio Main Library Weatherization

Project. (During this past year I took the outdated Safety Program and

completely redid the Safety Program to meet requirements for an OSHA SHARE

Project.)

Responsibilities and Training

My principal responsibilities have included:

* Overseeing all subcontractors and on-site work force

* Building layout, administrating contract scopes

* Approve Monthly Pay Applications for all Subcontractors

* Verifying that work adheres to contract documents assuring

quality

* Monthly updates on schedule and budget projections

* Establish and maintain jobsite schedule using Primavera

Contractor

* Help develop pricing and review drawings for constructability

during pre-construction process for CM@Risk work.

* Safety Training and record includes;

* Member of the AGC Safety Committee

* Safety Director for FA Nunnelly Co.(During the past year I took

the outdated safety program from FA Nunnelly Co. and revamped it

so it could meet all the requirements for a SHARE project.)

* 30 hour OSHA training,

* First Aid and CPR certified

* SHARE Project Coordinator for the COSA Main Library Project.

* Monthly jobsite inspections of all FAN Co. projects.

* Fall Protection Equipment Competent Inspector

* Flagman trained course

*

Work History

City of San Antonio Main Library Weatherization Project 12/2009-

present

CM@ Risk

I am currently working on the replacement of the EIFS exterior skin of the

Downtown Main Library. Replace the old 64 domed section skylights with 4

new 30'x30' pyramid skylights all Resume -Buentello page 2

work done while keeping the library open for regular business. Replacement

of all roof sections

Northeast Independent School District, San Antonio, Texas 09/2007

- 11/2008

Science Lab Additions

Hard Bid

Eight (8) stand alone additions that include new mechanical and

HVAC systems. Each one story addition containing eight (8)

lab/classrooms per addition. Contract amount $33,627,000,

Project Superintendent

Robert E. Lee High School, San Antonio, Texas 05/2005

- 07/2007

New Addition Phase II

* Hard Bid

* A four story 155,000 sq. ft. multi-use facility including 25

science labs, library, administrative offices and general

classrooms. (Occupied Campus project Due to fire exit routes

from the existing buildings we had to build covered walkways to

protect staff and students as they walked just 15' away from the

building footprint)

Contract amount $22,500,000.00 *, Project Superintendent

Sam & Ann Barshop Institute for Longevity and Aging Studies

San Antonio, Texas 04/2003 -

05/2005

* CM@ Risk

* The Barshop Institute is part of the University of Texas Health

Science Center of San Antonio, Texas. A three level 45,000 sq.

ft. molecular research facility. Special features included

world class animal research laboratories,

climate/sound/vibration controlled animal holding facility

(vivarium), bio-safety Level 2 research laboratories, and

lecture halls.

Contract amount $23,500,000.00 *, Project Superintendent

*

University of Texas San Antonio (UTSA)

Recreation and Wellness Center, San Antonio, Texas 07/2001

- 12/2002

* Design Build

* This project was a design build method consisted of a total of

two (2) buildings. A single story 11,000 sq. ft. child care

center and a two (2) story 70,000 sq. ft. recreational and

wellness center. The center consisted of an out-patient medical

clinic for students and facility, gymnasium, racquet ball

courts, multi-purpose aerobic areas and weight training.

Contract amount $21,750,000.00 *, Project Superintendent

Macarthur High School, San Antonio, Texas

New school 11/1999 - 12/2002

* CM@ Risk

* Originally established in 1951, MacArthur High School was the

first high school facility in the Northeast ISD. The task at

hand was to replace the oldest high school campus in the

district with a completely new campus while the school remained

Resume-Buentello page 3

*

* Operational. The 260,000 sq. ft. campus included 60 regular

classrooms, 32 specialty classrooms, 18 computer labs, 15

science labs, new vocational labs, new athletic building with

new sports field.

Contract amount $68,000,000.00 *, Project Superintendent

Brook hollow Office Building, San Antonio, Texas 11/1998 -

11/1999

* Hard Bid

* A 107,000 sq. ft., four story office building shell with precast

parking garage.

Contract amount $11,000,000 *, Project Superintendent

Methodist Healthcare Consolidation, San Antonio, Texas 10/1996 -

10/1998

CM@ Risk

This project consisted of a 253,000 sq. ft.; five story children

hospital addition, one-story addition to the labor, delivery and

recovery department and the floor by floor renovation of an

occupied 10 story hospital. The project was completed on time

and under budget in nearly 24 months while the hospital remained

operational.

Contract amount $66,750,000.00 *, Project Superintendent

UTSA Business Building, San Antonio, Texas 01/1995 -

10/1996

* CM@ Risk

* A 4 level 200,500 sq. ft. state of the art academic building

includes lecture halls, a 200 work station student computer lab.

Contract amount $66,700,000.00 *, Project Superintendent

* Present Day Value Estimate

Other notable projects:

(Estimated project values at time of construction)

Citicorp Phase II, San Antonio, Texas.

Office building.

Contract amount $33,400,000, Bartlett Cocke - Field Engineer

Nelson Wolff Stadium, San Antonio, Texas

6,000 seat baseball stadium.

Contract amount $23,100,000, Bartlett Cocke - Field Engineer

Jack Jordan Middle School, NISD San Antonio, Texas

2 story 170,000 sq. ft.

Contract amount $18,950,000, Bartlett Cocke - Field Eng.

/Assist. Superintendent

Texas Medical Association, Austin Texas

12 story Medical office building. 120,000sq.ft class ''A'' type

office building with 3 levels of covered parking built in 1991.

Resume- Buentello page 4

Contract amount $10,000,000, Austin Commercial - Field

Eng/Assist Superintendent

* USAA - HOBX/BRCC Expansion, San Antonio, Texas

1.7 million sq. ft. 4 story office building with 2 levels of

underground parking. Expansion project included office space,

cafeteria, and new workout area. Contract amount $ 170,000,000,

HCB Contractors - Senior Field Engineer

* American Airlines Reservation Center, San Antonio, Texas

60,000sqft building completed in 7 months.

Contract amount $ 7,000,000, Austin Commercial - Assist

Superintendent

* IBM/Westlake Project, Westlake, Texas

New Westlake campus, Project consisted of (6) new 4 story office

buildings including one cafeteria/central plant building and a

new state of the art 4 story computer center.

Contract amount $ 63,000,000, HCB Contractors - Field Engineer

* Bayside Market Place, Miami, Florida-Built in 1987 this

indoor/outdoor market place has over 230,00sq ft of retail area

and a covered parking garage.

Contract amount $ 40,000,000, HCB Contractors - Assist.

Superintendent

* North star Mall Additions with parking garages, San Antonio,

Texas

Contract amount $ 15,000,000, HCB Contractors - Field Engineer

* Interfirst Plaza, 28 story office building, 533,000 sq. ft. it

is one of the largest office buildings in San Antonio, Texas

built in 1983

Contract amount $ 40,000,000, HCB Contractors - Field Engineer