BARRY A. SIEGEL abirkj@r.postjobfree.com ***-***-
**** ************ ********** ******* **********
Accomplished manager with diverse project experience and the ability to
anticipate and resolve challenges.
. Significant experience in working from pre-construction services through
final project turnover.
. Substantial experience in large site development, major dewatering, mass
excavation shoring and rock stabilization projects.
. Accomplished in successful design-assist/design-build and fast track
projects.
. Cost conscious with the ability to offer value added analysis to projects
without compromising the owner's desired program.
. Successful in working with local, state and federal agencies; such as
local historic preservation committees, Colorado Department of
Transportation, Colorado Department of Public Health and Environment,
United States Army Corps of Engineers.
. Ability to communicate with trade workers, project superintendents and
owner representatives.
Objective
Project/Operations Manager in an organization seeking an individual with an
extraordinary record of on time and under budget performance while
maintaining significant client satisfaction.
Summary
I have many years of successful hands-on experience in construction, and
have solved many difficult site specific issues. As project manager, I am
acutely cost conscious with proven abilities to complete projects on time
and under budget, resulting in client trust and future work or an
exceptional reference. I have a strong capability to smoothly transition
between preconstruction services and project management.
Education
Cooper Union, B.S. - Civil Engineering
Training
LEED Accreditation Class
OSHA Ten-hour Class
AGC Safety Awareness Class
Software Capabilities
. Excel
. Word
. Outlook
. Microsoft Project
. Windows
. Sure Trak
. Adobe Photoshop Elements
. OST - On-line takeoff
.
Professional Highlights
Murray & Stafford, Inc., General Contractor, Denver, CO - Project Manager,
2005 - 2010
Key Accomplishments
. SMA USA SOLAR - Tenant fit out of one of the Enterprise Park buildings
for the manufacture of Solar Inverters. Specific task was management
of the M & E design/build for the 140,000 SF manufacturing floor.
$5.0M
. ENTERPRISE PARK-Three site cast tilt up warehouse buildings, approx
452,000 SF on two separate sites on 27 acres, including full site
development. $17.6M
BARRY A. SIEGEL Page 2 abirkj@r.postjobfree.com 303-465-
4864
. LIMA RIDGE PROFESSIONAL CENTER-Eight site cast tilt up one-story
office buildings, approx 107,000 SF, on 18 acres of full site
development. $9.4M
. ARVADA MARKETPLACE EAST-Remodel of approx 50,000 SF of existing retail
space into a Floor-N-Decor retail tile warehouse. $0.75M
. DALLAS STREET EXTENSION-New street including utilities and paving,
$0.3M
. NOBEL SYSCO WAREHOUSE-Remodel of an existing dry and cold storage
warehouse back to a core & shell condition, including removal of
existing interior and exterior coolers and conversion of the main
electrical service from a primary to secondary system. $2.0M
. LARKRIDGE POWER RETAIL CENTER-Core & Shell building approx 180,000 SF.
I took this project over from the original manager due to many
unresolved issues that could have caused significant delays and cost
overruns. All these delays and overruns were mitigated. $4.4M
Pinkard Construction Co., General Contractor, Lakewood, CO - Project
Manager/Lead Estimator, 2001 - 2004
Key Accomplishments
. Preconstruction services for the following projects
. GOLDEN MAINTENANCE & ADMINISTRATION FACILITY-New maintenance and
administration facility, including site selection.analysis. Six new
buildings, two materials storage structures and complete site
development. The new administration building is a 12,000 square foot
two-story building.
. THE CENTER FOR DEPENDENCY, ABUSE AND REHABILITATION-New dependency
abuse rehabilitation center. The project consists of five new
buildings and the renovation of one existing historic building on a 12
acre site with all new infrastructure at the Fitzsimmons Medical
Campus.
. BELMAR BLOCKS 4A AND 4B-Two new core and shell buildings. Building 4A
is an 80,000 square foot big box, multiple tenant retail building.
Building 4B is a 12,000 square foot strip retail building.
. GUANELLA RESERVOIR WATER STORAGE FACILITY-New water storage earthen
dam facility, including a slurry wall cut off structure, up to 100'
deep, beneath the dam.
. LONE TREE MAINTENACE FACILITY-8,000 square foot pre-engineered
maintenance facility.
. PROJECT MANAGEMENT FOR THE FOLLOWING PROJECTS
. GOLDEN RECREATION CAMPUS-The Splash Outdoor Aquatic Park and the
Fossil Trace Golf Course Clubhouse, including a zero depth entry
leisure pool with two 100'+ slides, multiple aquatic play features, a
spray park, a locker building, a concession building and an eight-lane
competition lap pool of diving depth. The clubhouse includes a full
service kitchen with dining facilities, snack bar, pro shop and golf
cart storage in the basement. The contract for the Splash was
finalized in December and the park opened in late May. $8.0M
. FOOTHILLS AQUATICS PARKS-Two new outdoor aquatics parks, Weaver Hollow
and Deer Creek, built simultaneously. Each site includes a zero depth
entry leisure/lap pools, 100'+ slides, many aquatic play features and
concession/operation and locker buildings. $5.0M
. BERKELEY LOFTS-New four-story concrete and wood frame building, with
retail on the ground floor and 30 for sale loft type units on the
upper floors. Rather than frame on site, we panelized all the framed
walls off site and trucked to the site, thus solving a site logistics
problem in a very cost effective manner. $5.0M
Colorado First Construction Co., General Contractor, Silverthorne, CO -
Project Manager/Estimator/Operations Facilitator, 1992 - 2001
Main duties consisted of managing projects and estimating, from conceptual
to hard bid. I was instrumental in the company's separation of its project
management and superintendent duties. I wrote their first operations
manual and first strategic plan. I purchased a new voice mail phone system
and a Novell LAN with associated hardware.
Key Accomplishments
. LAKECREST @ GATEWAY PARK APARTMENTS $25.7M
. GATEWAY PARK RETAIL BUILDING #1 $1.0M
. ORCHARD CROSSING APARTMENTS $16.9M
. THE LODGE CASINO/HOTEL $35.0M
. SUMMIT COUNTY US FOREST SERVICE REGIONAL HEADQUARTERS $1.0M
. HARVEY'S CASINO/HOTEL EXCAVATION, SHORING & STABILIZATION $3.5M
Core Competencies
Negotiated Work
Hard Bid Work
Ground Up Work
Renovation Work
Subcontract Negotiation
Subcontract Administration
.
?
Hard Bid Work
?
Ground Up Work
?
Renovation Work
?
Subcontract Negotiation
?
Subcontract Administration
?