Accomplished manager with diverse project experience and the ability to

anticipate and resolve challenges.

. Significant experience in working from pre-construction services through

final project turnover.

. Substantial experience in large site development, major dewatering, mass

excavation shoring and rock stabilization projects.

. Accomplished in successful design-assist/design-build and fast track

projects.

. Cost conscious with the ability to offer value added analysis to projects

without compromising the owner's desired program.

. Successful in working with local, state and federal agencies; such as

local historic preservation committees, Colorado Department of

Transportation, Colorado Department of Public Health and Environment,

United States Army Corps of Engineers.

. Ability to communicate with trade workers, project superintendents and

owner representatives.

Objective

Project/Operations Manager in an organization seeking an individual with an

extraordinary record of on time and under budget performance while

maintaining significant client satisfaction.

Summary

I have many years of successful hands-on experience in construction, and

have solved many difficult site specific issues. As project manager, I am

acutely cost conscious with proven abilities to complete projects on time

and under budget, resulting in client trust and future work or an

exceptional reference. I have a strong capability to smoothly transition

between preconstruction services and project management.

Education

Cooper Union, B.S. - Civil Engineering

Training

LEED Accreditation Class

OSHA Ten-hour Class

AGC Safety Awareness Class

Software Capabilities

. Excel

. Word

. Outlook

. Microsoft Project

. Windows

. Sure Trak

. Adobe Photoshop Elements

. OST - On-line takeoff

.

Professional Highlights

Murray & Stafford, Inc., General Contractor, Denver, CO - Project Manager,

2005 - 2010

Key Accomplishments

. SMA USA SOLAR - Tenant fit out of one of the Enterprise Park buildings

for the manufacture of Solar Inverters. Specific task was management

of the M & E design/build for the 140,000 SF manufacturing floor.

$5.0M

. ENTERPRISE PARK-Three site cast tilt up warehouse buildings, approx

452,000 SF on two separate sites on 27 acres, including full site

development. $17.6M

BARRY A. SIEGEL Page 2 abirkj@r.postjobfree.com 303-465-

4864

. LIMA RIDGE PROFESSIONAL CENTER-Eight site cast tilt up one-story

office buildings, approx 107,000 SF, on 18 acres of full site

development. $9.4M

. ARVADA MARKETPLACE EAST-Remodel of approx 50,000 SF of existing retail

space into a Floor-N-Decor retail tile warehouse. $0.75M

. DALLAS STREET EXTENSION-New street including utilities and paving,

$0.3M

. NOBEL SYSCO WAREHOUSE-Remodel of an existing dry and cold storage

warehouse back to a core & shell condition, including removal of

existing interior and exterior coolers and conversion of the main

electrical service from a primary to secondary system. $2.0M

. LARKRIDGE POWER RETAIL CENTER-Core & Shell building approx 180,000 SF.

I took this project over from the original manager due to many

unresolved issues that could have caused significant delays and cost

overruns. All these delays and overruns were mitigated. $4.4M

Pinkard Construction Co., General Contractor, Lakewood, CO - Project

Manager/Lead Estimator, 2001 - 2004

Key Accomplishments

. Preconstruction services for the following projects

. GOLDEN MAINTENANCE & ADMINISTRATION FACILITY-New maintenance and

administration facility, including site selection.analysis. Six new

buildings, two materials storage structures and complete site

development. The new administration building is a 12,000 square foot

two-story building.

. THE CENTER FOR DEPENDENCY, ABUSE AND REHABILITATION-New dependency

abuse rehabilitation center. The project consists of five new

buildings and the renovation of one existing historic building on a 12

acre site with all new infrastructure at the Fitzsimmons Medical

Campus.

. BELMAR BLOCKS 4A AND 4B-Two new core and shell buildings. Building 4A

is an 80,000 square foot big box, multiple tenant retail building.

Building 4B is a 12,000 square foot strip retail building.

. GUANELLA RESERVOIR WATER STORAGE FACILITY-New water storage earthen

dam facility, including a slurry wall cut off structure, up to 100'

deep, beneath the dam.

. LONE TREE MAINTENACE FACILITY-8,000 square foot pre-engineered

maintenance facility.

. PROJECT MANAGEMENT FOR THE FOLLOWING PROJECTS

. GOLDEN RECREATION CAMPUS-The Splash Outdoor Aquatic Park and the

Fossil Trace Golf Course Clubhouse, including a zero depth entry

leisure pool with two 100'+ slides, multiple aquatic play features, a

spray park, a locker building, a concession building and an eight-lane

competition lap pool of diving depth. The clubhouse includes a full

service kitchen with dining facilities, snack bar, pro shop and golf

cart storage in the basement. The contract for the Splash was

finalized in December and the park opened in late May. $8.0M

. FOOTHILLS AQUATICS PARKS-Two new outdoor aquatics parks, Weaver Hollow

and Deer Creek, built simultaneously. Each site includes a zero depth

entry leisure/lap pools, 100'+ slides, many aquatic play features and

concession/operation and locker buildings. $5.0M

. BERKELEY LOFTS-New four-story concrete and wood frame building, with

retail on the ground floor and 30 for sale loft type units on the

upper floors. Rather than frame on site, we panelized all the framed

walls off site and trucked to the site, thus solving a site logistics

problem in a very cost effective manner. $5.0M

Colorado First Construction Co., General Contractor, Silverthorne, CO -

Project Manager/Estimator/Operations Facilitator, 1992 - 2001

Main duties consisted of managing projects and estimating, from conceptual

to hard bid. I was instrumental in the company's separation of its project

management and superintendent duties. I wrote their first operations

manual and first strategic plan. I purchased a new voice mail phone system

and a Novell LAN with associated hardware.

Key Accomplishments

. LAKECREST @ GATEWAY PARK APARTMENTS $25.7M

. GATEWAY PARK RETAIL BUILDING #1 $1.0M

. ORCHARD CROSSING APARTMENTS $16.9M

. THE LODGE CASINO/HOTEL $35.0M

. SUMMIT COUNTY US FOREST SERVICE REGIONAL HEADQUARTERS $1.0M

. HARVEY'S CASINO/HOTEL EXCAVATION, SHORING & STABILIZATION $3.5M

Core Competencies

Negotiated Work

Hard Bid Work

Ground Up Work

Renovation Work

Subcontract Negotiation

Subcontract Administration

.

?

Hard Bid Work

?

Ground Up Work

?

Renovation Work

?

Subcontract Negotiation

?

Subcontract Administration

?