Timothy J. McDonald

*** ********** ******

Huntington, WV 25705

304-***-****

E-mail: abipc4@r.postjobfree.com

Objective: To obtain a position in operations / manufacturing management

utilizing my Chemical Engineering background.

Education: Bachelors Chemical Engineering, University of Dayton, 1990

Engineer in Training, State of Ohio

Experience:

2007-Present AK Steel - Coke, Ashland, KY

. Unit manager of Sulfiban and Byproducts with daily responsibility for

productivity, safety, environmental compliance, and plant operation.

. Maintain production standards of light oil, tar, and sulfur in byproduct

recovery of coke oven gas. Conducted training for hourly employees.

. Organized annual maintenance outages of $1.3 million.

. Conducted safety meetings for hourly employees.

. Conducted daily safety orientation for contractors.

. Plant received national recognition for safety performance and program.

. Participation in quality system and SRI accreditation.

1999 - 2007 Pregis Corporation, Wurtland, KY

Technical Manager / Process Engineer

. Plant Engineer of polypropylene sheet foam extrusion manufacturer.

Responsible for all technical aspects of plant operation, safety,

environmental, productivity, maintenance, quality, training, and

efficiency.

. Maintained requirements within Title V air permit and NPDES outfall.

. Process operations included plastic extrusion, solvent recovery utilizing

carbon adsorbtion, heat transfer, material handling, and single unit

process operations. Improved recovery efficiency of blowing agents while

significantly reducing energy consumption of process. Many processes

were controlled either via Yokogawa DCS or Allen Bradley PLC. Completed

modernization of DCS in 2007.

. Maintenance manger responsible for scheduling and assignment of

maintenance project schedule. Achieved greater than 95% on-stream while

significantly reducing maintenance expenditures. Implemented TPM

program.

. Project management from scope, design, acquisition, fabrication, and

implementation. Projects included capital projects to $100K.

. Created technical database of operations and procedures available to all

employees via plant computer network. Documents were presented as

electronic training materials. Trained all extrusion and solvent

recovery operators. The format of the program was modeled after ISO9000.

. Provided direct supervision of extrusion operators and relief supervision

of shift production. Presided over safety instructional meetings.

1994-1999 A, C, & S Inc., Nitro, West Virginia

Operations Engineer

. Operations Engineer of a small independent specialty chemical

manufacturer. Production capacity of organic dye unit was increased over

33% due to installation of new units, improved training and procedures,

maintenance and reduced downtime.

. Provided technical support to plant operations, utilities and analytical

laboratory.

. Developed new processes and procedures for chemical production unit.

. Project management included all stages of project development. Project

identification, scope, design, acquisition, construction, procedure

development, start up, and operation.

. Projects included powder grinding and blending unit, raw material tank

farm, finished product tank farm, specialty chemical unit expansion,

waste water treatment plant expansion and packaged ice plant.

Construction was accomplished using plant maintenance.

. Supervised all maintenance activities including; daily work schedules,

project design, construction, fabrication, vehicle maintenance, plant

breakdown, facility preventive maintenance, part specification and

acquisition, and technical direction of ten maintenance personnel.

. Wrote or updated company safety policy manual, safety procedures and

three process safety manuals compliant to OSHA PSM standards.

. Conducted training on all company safety policies and procedures.

. Wrote and developed quality assurance program to meet the requirements of

Association of American Railroad Specification M-1003 for a Class E

facility to meet DOT HM-201 requirements. Conducted training on all

quality procedures.

. Managed production of custom powder grinding and blending unit, including

daily interface with customer.

. Responsible for computer maintenance

. Maintain current Auto-CAD drawing database.

1994 3V Inc., Georgetown, South Carolina

Production Supervisor

. Supervised shift production of 15 people on several batch and semi-batch

processes in specialty chemical plant.

. Maintained plant emphasis on quality control, productivity, safety, and

environmental compliance.

. Provided engineering and production assistance in start-up and

troubleshooting on new production processes.

. Responsible for achieving calculated batch yields and raw material usage.

1990 to 1993 Calgon Carbon Corporation, Catlettsburg, Kentucky

Production Engineer

. Process Engineer in the production, sizing and regeneration of granular

activated carbon. Assignments related to productivity, safety,

environment, quality, or communication. Developed continuous improvement

of production through statistical problem solving techniques. Project

responsibilities included the implementation of ideas through the

training of personnel in production operations.

. Supervised shift operations crew of five of more in the reactivation

process of activated carbon. Maintained compliance with RCRA and

environmental regulations. Set job priorities for shift. Stress safe

work practices in the assigning of jobs.

. Performed safety audits recommending safe work practices and developed

corrective action of unsafe situations.

. Developed a training manual for the fine mesh sizing operation and

trained operators in the operation. Performed process engineering duties

relevant to daily production demands to meet maximum production and

maintain product quality.

. Specified process operating conditions for the production of different

grades of activated carbon on a prime manufacturing line and fine mesh

tower screening process.

. Created database on plant network to improve communication on product

optimization and records.

. Provided engineering assistance and trouble shooting for daily

manufacturing problems, which increased efficiency in other departments.

. Received two plant certificates of appreciation: one for a Waste

Reduction Project and a second for the Development of the Network

Database.

Summer 1989 FMC, South Charleston, West Virginia

Summer Intern

. Conducted material balance for continuous process of the manufacture of

hydrogen peroxide. Maintained performance data for catalyst study.

. Updated PID for existing plant.

. Maintained environmental compliance of plant NPDES discharge. Performed

necessary lab work.