Post Job Free

Resume

Sign in

Project Quality Assurance

Location:
Bastrop, TX, 78602
Posted:
October 27, 2010

Contact this candidate

Resume:

B randon DavisBrandon Davis Brandon Davis

Bastrop, Texas 78602

Phone: 512-***-**** Fax: 512-***-**** E-Mail: abiigr@r.postjobfree.com

BD

Objective

Seeking a position where proven skills, experience and t raining can be utilized to assist the work area while expanding

my knowledge, capabilities, and abilities to assist in the field.

E xperience

May 2009 – Cur rent Day Dynamic I ndustries I nc. A ngola South Africa

Material Supervisor

The Nemba Project, Contracted by Chevron, is to retro-fit and refurbishment to the South Nemba Platform 60 miles of

t he coast of Cabinda, Angola in South Africa.

Over see Load out of containers in Port Of Iberia Louisiana prior to barge loading for shipment to Africa

Run system of checks and balances to insure material is loaded properly and to code, insuring ease of clearance by

Angolan Customs Agents

Control packing and inspection of material by contracted freight forwarder.

Manage deck activity consisting of the tool room and material handlers to meet Chevrons Safety and production

requirements.

Track and report the current locations of project sensitive materials, backorders, and current status of the two barges

waiting to load out and depart New Iberia, Louisiana

Coordinate movement of requested containers from the materials barge via workboat to the work deck of the

construction barge, adjacent to the platform.

Work with all trades and crafts to ease the congestion of needed material in a tough logistical location

May 2008 – February 2009 Delaney Land & Minerals Co. Oklahoma/Texas

Petroleum Landman Supervisor

Sinclair and Provident Oil Companies Projects

I ndependently contracted to Delaney Land to run hard title, complete curative on tracts, due diligence for Provident and

Sinclair Oil Company in South Western Oklahoma.

Hard Title, Draft Title, Cursory Title, Leasehold Title, Curative, HBP Title, D.O.I.

• Mineral interest and surface only

• Maintained proper Court House etiquette to ensure a timely and proficiency of assignments, most runs completed

w ith in 24 to 48 hours.

O.C.C. Regulation Knowledge.

Assist Crew Manager and Infield Trainer of Rookie Landman.

Team leader on Sinclair project

October 2007 – May 2008 Willbros West Africa/Ascot Int West Africa

Logistics/Material Coordinator

West Africa Gas Pipeline (WAGP) project in conjunction with West African Gas Pipeline Company (WAGCO)

a nd Chevron

Pipeline project spanning the countries of Nigeria, Benin, Togo, and Ghana. Installation of one compressor station and

4 Regulating and metering stations. Willbros West Africa is an Affiliate of Willbros Groups Int.

• Managed warehouse and transportation personnel in safe and productive work ethics resulting in a injury free

work environment

• Managed time and daily activities of logistics and warehouse personnel.

• Managed the requisition process as well as the material receiving records to insure they reach purchasing, then on

to accounting to get vendors paid.

• Coordinated with AMT (freight forwarder) to assure timely delivery after freight was cleared through customs and

able to be retrieved from the port in Lagos, Nigeria.

• Managed receipt and storage of project materials delivered from both local and international vendors.

• Managed and maintained fleet vehicle records, licenses and permits needed to operate across the countries of

Ghana, Togo, Benin, and Nigeria.

• Maintained fuel consumption records, levels and deliveries to accommodate the work schedule at various work

locations as well as life support at the living locations.

• Reviewed and Cross Checked material to assure the requirements are met to project and company standards and

specifications. (CONT)

• Coordinated the movement of personnel across the borders to various work locations, from Nigeria to Ghana.

4

• Coordinated the movement of equipment from various work locations back to our main location, or choba the

companies’ home base.

Coordination with project management teams to an effective draw down of employees to successfully complete the job in given

t imeframe

July 2007 – October 2007 Varel International Houston Tx

Logistics/Product Coordinator, Outside Sales

Varel International Produces, Markets and Sales drill bits for the oil and gas industry. From work over, new

exploration, offshore drilling, to water wells they are a leading competitor in today’s industry.

• Managed sales and rental fleet of Mill Tooth and Diamond tooth drill bits for one of the leaders in the gas and oil

i ndustries.

• Managed and Maintained records of the repair of rental bits, which included re-dispatch to locations along the

Gulf coast from Texas to Louisiana.

• Created a tracking process to better assist the tracking of the bits as they moved through the re-fabrication process

at the manufacturing plant.

• Maintained Quality assurance records as well as Drill reports for all bits sold, as well as the rental fleet that were

sent down hole

Responsibilities were inclusive to 24/7 on call, re-order and maintenance of consumables, as well as general housekeeping to

ensure a safe and productive work environment.

February 2007 – July 2007 P IJV GRD Oil Program I raq/Kuwait

Material Coordinator

Another venture with the US Army Corps. Of engineers and Worley Parsons, the project was compiled of the

reconstruction to many war torn oil and gas facilities in southern I raq. Consisted of oil and gas facilities such as cluster

pump stations to ABOT offshore oil loading platform.

Managed material warehouse in Kuwait to supply offshore loading platform upon submitted request.

4

Coordinated Material movement in and out of our secondary location in Iraq VIA chartered aircraft.

Assisted in material turnovers to Iraqi oil entities upon project completion

Maintained inventory and records in MCDS to comply with government and company regulations.

Oversaw the Forklift and crane operations to comply with company safety policies.

Weekly updates of database inventories to maintain 100% accountability of material in our possession.

Worked in coordination with sub contractors to ensure timely delivery of material to keep construction efforts on

schedule.

General house and grounds keeping of the warehouse yard and facilities.

Gained knowledge in the operation of Parsons DMCS and CITDON material and document control Data bases.

Conducted business with local vendors for returns and exchanges to ensure the correct material is supplied to the end

users.

Conducted close out procedures and ensured all material upon completion of the project was disposed of in

accordance with standard operating procedures.

Sep 2003 – Februa ry 2007 KBR R IO/PCO Oil I r aq/Kuwait

Warehouseman

With the US Army Corps of Engineers, This was a reconstruction effort of war torn oil and gas facilities in

I raq. Consisted of gas production, compression plants, power generation facilities and cluster pump stations.

Assistance was often given to Halliburton ESG in the there effort in the work over r igs spanning southern

I raq, along with oil pipeline repair.

Shipping and Receiving of material between Kuwait, I raq, and job sites.

Maintain complete and orderly t ransaction warehouse documents, and records.

Familiarization with the procurement from the requisition stage thru to the receiving stage.

Ongoing contact with vendors and services support personnel.

Familiarization with government compliance and general exporting / importing regulations.

Gained vast material knowledge pertaining to water injection pump stations.

Kept running / tracking logs of material movements on the project.

Marking, sorting, and keeping excess material organized and easily accessible.

Worked hand in hand with TCN’S and HCN’S.

4

Government property control and accountability for durables and assets

Turn in of excess to U.S. DRMO for disposable and re-issue

Government compliance pertaining to issuing and storing government property

Safety award for two years of no lost time accidents operation equipment, and supervising HCN’s, along with

100% TSTI (Total Safety Task Instruction) before every activity

Sep 2001 – Sep 2003 J.C. I ndustrial Baytown, TX

Warehouse Attendant

Part time CO-OP during school and full time During the summer

Kept tools and material organized

Loaded out gang boxes and tool trailers for particular jobs.

Maintained running log of locations of trailers and contents.

Gained vast knowledge of industrial construction and electrical material and Tools

Receiving material from local venders and delivering to hands on site.

Education

1999-2003 Ha rdin H igh School H a rdin Texas

Graduated with Distinguished Academics Diploma.

T raining/Skills

Certified Forklift Operator through KBR as well as Worley Parsons

Training on the Job;

4

Chevron Incident and Injury Free Workshop

Chevron Hazard Recognition Plus Workshop

Halliburton SAFE Training

Proper use of ladders, and Lifting techniques

Import and Export Regulations

MDCS (Material Data Control System)

MSDS Reading and proper use

DMCS Material control Database

CITADON Document control Database

Computer Strong Points

Word Processing- MS Word 2000

Spreadsheet – MS Excel 2000

Presentation – MS PowerPoint 2000

References avai l able upon request.

4



Contact this candidate