Post Job Free
Sign in

Engineer Manager

Location:
Topeka, KS, 66614
Posted:
October 29, 2010

Contact this candidate

Resume:

Luis A.Xico Perez

**** ** ******** **. - ******, Kansas 66614 - ******@*********.***

785-***-****, 785-***-****

PROFESSIONAL EXPERIENCE

Goodyear Tire & Rubber Co., Topeka, Kansas

**** - 2009

CONTINUOUS IMPROVEMENT ENGINEER (Nov-2007 to Jan-2009)

. Part of the team to implement a kanban system in compounds storage

areas. Developed layout in the areas assigned, marked locations

and painted locations in the floor, finally trained associates how

the kanban system works correctly. The impact was a reduction of

work in process inventory by 7.5%.

. Participated in TPM team (total productive maintenance) to

overhaul a cure press. I helped with "before and after" status of

the machine, basically the statistics of the project.

. Took part in a VRK (variation reduction by kaizen) team; helped

with data of production in order to monitor the progress of the

project. Tracked the project for 90 days after the implementation.

. Worked in a 5S team to improve a work station. Eliminated

everything but only kept tools and supplies to operate the

machine. Help to allocate tools within reach of the operator's

position.

. Contributed to create the first value stream mapping for

Goodyear's Topeka plant. One for Radial Truck business team and

one for Earthmover business team. Contributed to compile all

process times, changeover times, waste performance index, and in

process inventory for all machines involved in the study.

. Collaborated in standardizing operations using Maynard operation

sequence technique (MOST). Established a standard operations and

time for similar work sequences, making shorter time to produce

similar standard times. At same time, developed 10 standards in

building area which assisted in a 5% increase in production.

. Developed the machines capacity book plant wide leading a group of

three industrial engineers. Designed pages by machine, split the

work with engineers, tracked progress of the project, and combined

all machines pages and production areas into one electronic file.

INDUSTRIAL ENGINEERING MANAGER (Nov-2002 to Oct-2007)

. Worked with management team to produce the annual operation plan (AOP);

coordinated staff and manufacturing areas to integrate the final report

and have the job done on time by September.

. Proposed, analyzed and implemented new jobs in the plant, to improve

manning utilization for new machines, new processes, and job combinations.

. Implemented, tracked, and reported on monthly basis the cost savings in

manufacturing areas based on AOP document and the productivity plan.

. Coordinated, supervised, trained, and evaluated the job of two industrial

engineers. Responsible to produce and control annual budget in the

Industrial Engineering department.

. Assisted with cost data to implement the production bonus for Earthmover

Business team in 2006.

. Calculated manning budget for each area and department based on AOP

requirements.

. Reviewed and set up production capacity of the final finishing machines,

(CvsR spreadsheets).

INDUSTRIAL ENGINEER (May-2001 to Oct-2002)

. Gathered, analyzed data, and then designed and implemented changes

in Mixing and Extruding areas to reduced bottlenecks and meet

production requirements.

. Contributed on developing a new machine standard in building area

based on new operations and new design.

Luis A. Xico Perez page 2

. Tracked Mixing production on monthly basis to informed management

and compared data with all mixers in the corporation.

. Trained hourly associates on implementing changeover philosophy.

Improved the change over time to mixers by 12.5%.

. Audited, reviewed and approved omitted payroll to hourly

associates.

Goodyear-Oxo S.A. de C.V. Mexico City plant, MEXICO

1985 - 2001

OPERATIONS EFFICIENCY ENGINEER (May-1985 to May-2001)

. Conducted internal and external QS9000 audits for keeping quality

certification in Mexico plant.

. Changed the layout to set a couple of machine nests to reduce

carcasses movement, improve floor shop utilization, and increase

passenger tire production by 9%.

. Active IE participation for implementing G3 full stage passenger

tire building machine at Mexico plant in 1999. Established the

standard work for G3 machine and worked in the layout to allocate

the materials storage for the machine.

. Led the Ergonomic team in Mixing department to improve safety

indicator by training, recording, and implementing changes to job

stations in extruders, beads, ply cutters, and belts cutters

machines.

. Standardized open/close time in curing passenger presses by

applying the best practice concept.

. Support plant manager with studies for planning the 3 years

business plan.

SUMMARY OF SKILLS

. Industrial Engineer professional with 30+ years of experience in a

unionized manufacturing plant.

. 20 Years in Industrial Engineering department improving processes,

evaluating equipment & manning capacities, and contributing to

increasing productivity through rapid improvements activities

(RIA's).

. Good skills in cost savings through analyzing, reporting, and

tracking cost improvements.

. Adapted to work in a team environment driven to succeed.

. Good interpersonal communication and presentation skills in

Spanish and English languages.

. Knowledge of MS office, AS400, Lotus Notes, and proprietary

software programs. Standard Pro software experienced for setting

standards based in MOST.

EDUCATION AND TRAINING

BACHELOR OF INDUSTRIAL ENGINEER DEGREE

Instituto Polit cnico Nacional: Certificate # 1911225, M xico City, M xico

QUALITY SYSTEMS TECHNICIAN

Lloyd's Register Cert # VCZ-530007/21

QS9000 INTERNAL AUDITOR TRAINING MODULE

Supplier Quality Requirements Task Force (GP97-0038)

BASIC MOST APPLICATOR

H. B. Maynard and Company Inc. card 16143-Exp. Feb.2005



Contact this candidate