Resume of John W. Tapley
SUMMARY / OBJECTIVE
At this point in my career, after 25 years of experience in Project
Management my objective is to remain a service to my field of expertise and
at this time I am seeking positions such as a Project Manager, Senior
Scheduler / Lead Construction Planner/Scheduler / Lead Project Controls
Analyst / Project Scheduling Engineer.
My areas of responsibilities have been based in Project Management, Project
Controls, Evaluating Capital Project Schedules, Planning, Scheduling, EVMS,
Change Management and Critical Path & Risk Analysis of Modification and/or
New Construction from Bidding, Proposal, Engineering & Procurement
Scheduling and Construction through Commission and Turnover to Owner.
Trained personnel on outage scheduling techniques and use of the Primavera
software.
WORK EXPERIENCE
I have had positions at Fossil, Gas Turbine and Nuclear Generating
Stations. These included Senior Technical Assistant, Senior Planner,
Estimator, Sr. Electrical Senior Planner / Scheduler, Sr. Planner /
Scheduler - Engineering, Modification Coordinator, Site Lead Construction
Scheduler, Engineering Work Control Scheduler, Project Controls Work
Analyst as well as Project Proposal Lead for new construction.
. Assignments at recent facilities included: Conceptual Design,
Engineering Scheduling, Procurement Scheduling the follow-on to
delivery for installation at site, Planning and Scheduling of Site
preparation toward vertical completion of Project. Outage and/or
Construction-Modification Scheduling. Project Cost Control Management
and Estimating, final design, preparation of installation packages for
craft, planning, scheduling, installation, radiological controls,
testing and startup at nuclear or fossil electrical generating
stations, combustion turbine (single and combined cycle). Oversee of
new construction and modification activities included cost control
management, craft supervision, design changes, field engineering,
field change notices, quality assurance documentation (adverse to
quality), abandon in place and removal/replacement of retired
equipment.
I have provided planning services for Centerior Energy at their Davis Besse
Power Station. Served as a Planner and Scheduler of: Electrical Upgrades
and Modifications, Instrument and Control Upgrades, Maintenance,
Modification Coordinator and as a Motor Operated Valve Test Field
Technician.
. Also was the original individual involved in the inception of a
Maintenance Planning Group. Assisted or directed the implementation
of procedures, policies, and controls regarding the development and
interfaces of a planning organization. I advised in the design,
development, Configuration Management and implementation of a Data
Based Maintenance Management Planning System. Prepared administrative
procedures including the Control of Maintenance, Plant Modification,
Plant Security Upgrades, Document Control, Project Controls, Outage
Planning and Maintenance Scheduling utilizing ANSI, INPO and EPRI
Standards and Guidelines.
My responsibilities have included:
. Performing Engineering, Procurement and Construction (EPC) Scheduling
. Planning and Scheduling of / Work Planning; Preventive, Predictive and
Routine Maintenance
. Coordinating work orders for refuel outages
. Closure of all deficiency items against NSSS systems which were fuel
load restraints
. Prepared, Researched and reviewed Potential Conditions Adverse to
Quality and Work Orders
. Scoping system test boundaries for Work Planning
. Preparing test packages
. Assuring QA acceptance of completed test packages
. Prepare Documentation for EPC Projects
. Monitored static, dynamic and in-service field testing
. Construction / Modification: Installation implementation costs / Cost
Control Management / EVMS and Resource Loading and Leveling based on
JD Edwards Resource and DOE Planning Standards
. Site preparation, Estimating and Field Engineering for Modifications
and New Construction, including Substations and T&D.
. Critical Path Method (CPM) scheduling
. Preliminary schedules
. Periodic scheduling updates
. Planned and as-built schedule analysis
. Development of work breakdown structures
. Resource and cost loaded schedules
. Construction project acceleration
. Schedule delay analysis and quantification
. Total float management
. Time impact analysis
. "What-if" scenarios
. Project risk management throughout a project's life cycle
My expertise in/or use of client in-house computer systems include:
. Currently utilizing Primavera 6.2 as a Super User in a WBS/EPS/OBS
Node structured presentation
. PRIMAVERA - P3 / Enterprise - P3e/P5/P6 with Digger Analysis &
PertMaster / SureTrak, Open Plan, COBRA, INDUS-PASSPORT Version 7,
PROJECT/2,, XPM, EWCS, CMMS, PIMS-MMIS,
. Micro Soft Project (all versions)
. Familiar with computer Estimating tools such as Timberline,
. Word, Excel, Power Point, ACROBAT 8.0, LOTUS, PREMIS,
EDUCATION/AFFILIATIONS
. Mechanical Engineering, University of Toledo, Toledo, Ohio, USA
. Management Development Seminars, Wittenberg College, Springfield,
Ohio, USA
. Primavera Technical Associate
. Syska and Hennessey Engineers, Seminars on Planning and Scheduling.
. DOE Project Management Orders, EVMS Applications and Training Course,
Aiken, South Carolina, USA
WORK HISTORY:
Indianapolis Power and Light, Indianapolis, IN - AES Fossil Division
[July 2010 to Present]
Planner / Scheduler / Instructor - Preparing schedules for
Outage(s),Capital Improvements and Modifications in a training mode; for
current planners and schedulers. Performing schedule preparation for 3
sites in Indiana; of forthcoming outages.
Brand Services, Inc, Detroit, MI
[June 2010 to
July 2010]
Planner / Scheduler / Instructor - Performed training of staff in
utilization of Primavera 6.2 v7 in scheduling, manpower loading and earned
value. Prepared schedules interfacing: Marathon Oil, (Client), Fluor
Industries (Contractor) and Brand Services for the Detroit Heavy Oil
Upgrade Project [DHOUP].
Time to relax while unemployed
[Feb 2009 thru
June 2010]
The Shaw Group, Inc., Charlotte, NC - Power Division - Fossil/Nuclear Group
[Oct 2007 thru Feb2009]
P5/P6 Planner / Scheduler / Proposal Lead / Project Controls - Assigned to
Project Development as Proposal / Planning Lead preparing Level I / II
schedules for new project submittal. Temporary assignments: DUKE-Marshall:
Station Unit 3 SCR Project; assisting Lead Scheduler in preparation of
logic driven schedule with Work Breakdown Structure (WBS) for client usage;
DUKE-Allen FGD Project: Provided technical and operational direction to
staff personnel. Perform change control, collection and tracking of
performance, critical path analysis and variance analysis; RELIANCE -
KEYSTONE FGD Project: Provided analysis and recommendations regarding
corrective action measures of changes regarding schedule revisions and
project change revision adjustments. Analyzed validity of schedules
submitted by sub-contractors contributing to the project, and forecast
impacts on the schedule of any proposed changes. Maintain project activity
codes, with respect to commissioning activity, milestones, constraints, and
assignments. Develop and maintain Program schedules and coordination.
Prepare and provide input to client schedule reviews.
Re-assigned to, SHAW Nuclear New-Design-Build Division for the Westinghouse
AP1000 Generation Stations, for Progress Energy Inc. Assist in establishing
construction methodology for Westinghouse AP1000 Standard Plant Site
Execution Plan, Licensing, Commissioning, and Power Operation.
SALT Waste Processing Facility (DOE-Savannah River Site), Aiken, SC,
PARSONS [Jul 2007 thru Sep 2007]
Project Controls / Primavera P5 Scheduler - Assisting in preparation of the
Plan of the Day (POD) and Plan of the Week (POW) schedules and their
distribution. Planning and status updates to the schedule, changes from
update documents, progressing schedule in a manner eliminating out-of-
sequence logic, addition of new project activities and preparation /
distribution of new update forms. Received refresher training, as
applicable under DOE, in Earned Value Management Systems (EVMS), and an
overview course in Integrated Safety Management Systems (ISMS).
EXCEL ENERGY, Monticello Generating Station, Monticello, MN, NMC
[Jan 2006 thru Apr 2007]
P3e/P5 Projects Lead Scheduler - Creating project schedules as assigned.
Assisted Project Mangers in the preparation of schedules for on-line,
outage and non-outage contingencies. Prepared Engineering schedules,
interfaced with Engineering Disciplines, and facilitated 'what if'
contingencies. Included were: change-out of Reactor Recirculating Pump "B",
Generator Re-wedge, Recoating of Torus, Voltage Regulator Replacement,
Instrument Air Upgrade, Improved Technical Specifications Integration for
Extended Power Uprate, Service Water Pump(s) Replacement, New Receiving
Warehouse and Paperless Recorder(s) Modification. Assist in the preparation
of RF-23, 2007 Refueling Outage Schedule. A team member of Fleet Management
Group for Nuclear Management Co. [NMC], managers for nuclear fleet of Xcel
Energy. Performed logic changes, change management, resource
loading/leveling and cost control management.
MidAmerican ENERGY, COUNCIL BLUFFS, IA, AKER/KVAERNER/SONGER
[Jun thru SEP 2005]
Scheduler/Consultant/Lead - Correcting subprojects, in Primavera project
schedule, for construction of 750 Mw Council Bluffs Energy Unit 4. Modified
Flu Gas Desulfurization, Bag house and SDA Cell schedules impacted by civil
delays. Updated quantity and resource values, resource leveled the same,
received from engineering updates for Piping Subcontractor. Performed logic
changes, resource loading/leveling, cost control management, duration and
critical path(s) analyses to create project baseline schedule.
DOMINION GENERATION, RICHMOND, VA
[Jan 2005 to June 2005]
Scheduler/Consultant - Develop outage schedules for Dominion Generation
fossil stations using SureTrak Project Manager. Develop schedules to be
templates for fossil fleet with work breakdown structures (WBS & WBSE).
NEW YORK POWER AUTHORITY, 500MW CC PROJECT, ASTORIA, NY
[Nov 2004 - Jan 2005]
Scheduler/Consultant - As a member of a project team, assisted in the
redevelopment of design and construction schedules and budget data. Other
duties included collecting, interpreting and inputting missing past
schedule data into the project control database and providing output to the
project team, project managers and engineers. Identified schedule impact
with other related project planning and controls documentation due to
construction errors of omission.
MONROE POWER STATION - DETROIT EDISON, MONROE, MI
[September 2004 - October 2004]
Lead Outage Scheduler - Administrative Lead Scheduler and Super User for
Scheduling Staff in the preparation of Unit 2 2005 outage schedule
planning, utilizing Primavera Enterprise 3.5 (P3e). Defined, corrected or
modified Work Breakdown Structure as well as Start/Finish Milestones to
plant system windows. Downloaded and imported new tasks and globally
corrected activity coding structure Developed critical path(s) for shutdown
and startup, logically tieing through entire schedule critical path to
perform critical path analyses. Resource loaded project for resource
leveling and cost control management. Prepare reports/schedules/graphs to
Project Managers, Supervision and Staff by hard update copy and web access.
MOUNT STORM POWER STATION - DOMINION GENERATION, Mt. Storm, WV
[July 2004]
Onsite Training/Mentoring - Mentored staff in the preparation of outage
project(s) planning, utilizing SureTrak-V3.0b. Provided "lessons learned"
in resource leveling, best practices, critical path analyses, logic
analysis, project risks, update responsibility / methodology and
presentation.
LOWER MOUNT BETHEL ENERGY, LLC. - PP&L, MARTINS CREEK, PA
[March 2004 - June 2004]
Project/Outage Scheduler/Planner - Preparation of first LM2500. Combined
Cycle outage schedule using Microsoft Project to correct construction
deficiencies and to complete punch list items. At Corporate direction,
converted schedule to Primavera. Scheduled Startup of Unit Substantial
Completion to Provisional Completion. Prepared Preventive Maintenance
Schedule for plant operation. Mentor preparation of Corrective Maintenance
Work Packages in Passport; both for constructor and client personnel.
Involvement in correcting original valve/equipment instrumentation set
points.
MARTINS CREEK SES - PP&L, MARTINS CREEK, PA
[August 2003 - October 2003]
Project/Outage Scheduler/Consultant - Prepare outage schedules for Unit 1
(coal fired) and Unit 3 (oil/gas fired) utilizing Primavera P3 v3.1. The
assignment was the mentoring of the conversion from Microsoft Project to
the use of P3 as the scheduling tool for the Fossil Generating Stations of
PP&L. Interfaced with management, staff, craft and contractors to
facilitate the use of that scheduling tool. Downloaded and integrated work
order data from Passport (CMMS) to P3 schedule(s).
FAIRLESS ENERGY PROJECT - JOSEPH JINGOLI & SON, Fairless Hills, PA
[April 2002 - May 2003]
Site Lead Construction Scheduler - Prepare construction schedule with
resource loading and project controls, including takeoffs for reporting,
for underground civil infrastructure to support 4 GE 7FA Turbines/7FH2
Generators w/HRSG Reheat Units and 2 Steam Turbines. Coordinate and
interface with client and subcontractors for placement of foundations,
electrical duct banks and underground piping activities assuring timely
completion. Planned placement of Substation through easements, erection and
operative construction of transmission line(s) to grid.
ODEC PROJECT - FRUCON CONSTRUCTION, Rock Springs, MD
[August 2001 - April 2002]
Site Project Lead Scheduler - Monitored installation of GE MS 7001FA Gas
Turbines with 7FH2 Generators (4). Developed and maintained project through
Engineering, Procurement, Construction (EPC) and start-up utilizing
Primavera to assure company profitability. Managing all phases of
construction scheduling including cost control management monitoring, tie
in of T&D / Switchyard to transmission to grid and acquisition of long lead
items assuring and expediting delivery to site.
WATERFORD PROJECT - Duke/Fluor Daniel, Waterford, OH
[February 2001 thru July 2001]
Site Project Lead Scheduler - Develop Combustion Turbine Simple/Combined
Cycle EPC schedule with Primavera v3.0 for 3 GE 7FA Turbines/7FH2
Generators w/HRSG reheat units for 400Mw turbine/generator. Scheduled
construction detailed activities, maintained and status the same, analyze
critical path(s) and coordinate with the Project Controls / Management
Team. Interface with Design Engineering, Procurement, Contracts, Sub-
Contractors and Construction. Performed site walk down progress estimating
and inputting the same
PICKERING "A" RETURN TO SERVICE, Ontario, Canada
[September 2000 thru January 2001]
Sr. P3 Scheduler - Preparation of Primavera v3.0 Functional Outage Group
[FOG] schedules for restart of Pickering "A"-Ontario Hydro (BWR) utilizing
Primavera & Passport. Assigned as Engineering Single Point of Contact for
scheduling. Assisted CANEC BOP Manager in status of design change matrices.
Prepared long range and near-term planning of FOG windows. Maintained
detailed work schedules and incorporated the same into the integrated
outage schedule through the Work Control Process.
VERMONT YANKEE NUCLEAR POWER STATION
[April 2000 thru September 2000]
Engineering Work Control Scheduler - Using Primavera v3.0, performing the
engineering design change schedules for outage, non-outage, minor
modifications, configuration management and nuclear engineering; resource
loading and leveling the same. Coordinated with all engineering disciplines
statusing design change matrices. Establish targets and revise as required
to indicate major revisions. Prepared the Outage schedule by export/batch
of driving activities. Interfaced with AmerGen during transition phase of
sale of Vermont Yankee NPS.
ALLIANT ENERGY/COLUMBIA ENERGY UNIT 2
[Jan 2000 into April 2000]
Project Scheduler - Project Controls - Short term assignment, using
Primavera, scheduling complete removal and modification of the economizer,
replacement of both induced draft fans and installation of 13.8kv MCC's,
bus, cable and raceway. Prepared quantifiable reports as project
performance indicators reporting to partner Morrison Knudsen.
TVA CUMBERLAND CITY GENERATING STATION
[Aug 1999 thru Oct 1999]
Work Analyst / P3-Scheduler - Short term assignment scheduling TVA Fossil
Supercritical Plant maintenance, construction modifications and schedule
maintenance during Unit 1 Outage.
DC COOK NUCLEAR POWER STATION
[May 1999 to Aug 1999]
Senior Planning Specialist - Preparation of outage window schedules
utilizing P2. Providing project coordination with System SRO(s) &
Engineer(s), Work Control and all interfacing organizations. On staff to
assist in conversion from PSDI/P2 Scheduler to Primavera/P3 concentric
planning.
LaSalle COUNTY GENERATING STATION
[Jan 1999 to May 1999]
Work Analyst / Scheduler - Short term assignment scheduling electrical
maintenance, prepared takeoffs for ordering materials, planning
construction modifications and work package preparation using Passport
(CMMS) during Unit 2 Outage. Prepared work packages for fall Unit 1 Outage.
CLINTON POWER STATION
[July 1998 to Dec
1998]
Sr. P3 Scheduler - Preparation of all ECCS system schedules for restart
effort utilizing Primavera/P3. Assisted Work Week Managers in scheduling
their week specific. Long range and near-term planning of system windows.
Reassigned as Lead Scheduler for "Plan for Excellence Project Team"
controlling the Clinton Power Station Integrated P3 schedule for restart.
SUSQUEHANNA SES
[March 1998 to
July 1998]
Refueling Floor / Future Projects Scheduler - Prepared critical path refuel
floor schedule using Primavera-P3 to ensure maintenance of overall schedule
timeline. Participant in scheduling meetings and plant-wide daily status-
progress meeting. Directed interface of work authorizations with PMIS and
P3. Performed daily analysis of schedule adherence and update of work in
progress. Initiated, developed and maintained detailed work schedules and
incorporated the same into the integrated outage schedule. Scheduled near
and long term non-outage (BWR) work for the maintenance department.
GENERAL MOTORS-FLINT METAL CENTER
[Aug 1997 thru March 1998]
Scheduler - Preparation and maintenance of the MS Project Master Schedule
of press line rehabilitation and relocation to meet future project line
development. Utilized MS Project for future Line Development at Metal
Center and Primavera/P3 at Assembly Plant. Performed training of new
schedulers on utilization of P3, converting and merging multi-level
projects from MS Project at Flint Assembly Center.
LaSalle COUNTY GENERATING STATION
[July 1996 to April 1997]
Outage Coordinator/Asst. Master Scheduler/Work Control Preparation of
outage/non-outage safety related window schedules utilizing P2 to MS
Project 4.0 downloading into Passport (CMMS). Preparation of plant Plan of
the Day [POD] for all units as well as issuing Performance Monitoring
Reports. Utilized EWCS (Modified Passport) to perform task scheduling.
GENERAL MOTORS-GMT 600, WENTZVILLE, MO
[November 1995 to May 1996]
Scheduler - Body Shop Modification Upgrades Onsite Representative for
Morrison-Knudsen, scheduling Body Shop Action Plan with MS
Project/Primavera/P3 to meet completion goal for production. Determined
resource requirements, presentation of cause and effect for priority
changes.
SALEM/HOPE CREEK, GENERATING STATION - PSEG
[1995: February & July-August]
Project Scheduler - Installation/Test Engineer Planned 230VAC breaker
upgrade and change-out for motor operated valves. As Installation Test
Engineer, was project leader/coordinator for scaffolding and temporary
power and lighting for all units (PWR/BWR). Performed cost scheduling and
prepared cost reports to senior management.
INDIAN POINT 3, GENERATING STATION
[Nov 1993 -Jan 1995]
Outage Management Planned and scheduled plant restart activities using
Primavera/Finest Hour. Project Leader scheduling 480V modifications,
security badgering system, material expediting and engineering input.
Reassigned to Outage Scheduling modifying outage schedule, entering turn-
around information, preparing Plan of the Day [POD] Reports, participating
at POD, providing risk assessed system window schedules and reports.
PILGRIM GENERATING STATION
[Oct 1992 to Nov
1992]
Planning/Field Engineering - As Project Team member, prepared construction
work packages for modifications during 9th mid-cycle outage. Performed
planning, blueprint material take-off, estimating and engineering interface
for Erosion/Corrosion Piping Replacement program.
INDIAN POINT 3 GENERATING STATION
[Dec 1991 to June1992]
Planner/Scheduler/Administrative Lead - Performed as Project Manager,
planning, scheduling (utilizing Prestige) and estimating component cooling
water heat exchanger change-out that was performed during 8/9 cycle (BWR)
outage. Coordinated heavy equipment contractor activities. Reassigned to
Outage Management Department scheduling 8/9 cycle outage utilizing XPM.
MAINE YANKEE GENERATING STATION
[Oct 1991 to Dec1991]
Project Superintendent-Mechanical - Prepared construction installation
instructions, bills of material from takeoffs, weld maps, welding program
(including qualifications), cost control management, and
planning/scheduling replacement of station electrical generator.
TOLEDO EDISON COMPANY [Retired]
DAVIS-BESSE NUCLEAR POWER STATION
Lead Modification Coordinator
Sr. Planner/Scheduler - Engineering
Sr. Electrical Planner/Scheduler
Senior Planner
Senior Technical Assistant
Chemistry and Health Physics Supervisor
Sr. Chemistry, Health Physics Tester, & Group Leader
EDUCATION:
University of Toledo, College of Engineering
Math Major, Chemistry, Physics, Engineering, Drafting, and Liberal Arts
CONTINUING EDUCATION:
Three months on-site training, Chemistry and Health Physics, Ginna
Electrical Power Station,
Babcock and Wilcox Chemistry and Radiochemistry Seminars.
Wittenburg College, Management Development Seminars.
Primavera Technical Associate
Syska and Hennesy Engineers, Seminars on Planning and Scheduling.
PSDI, PROJECT/2 Schedule Manager. PIMS. Kepner-Trego Decision Making
DOE Project Management Orders, EVMS Applications and Training Course
ADDENDUM TO RESUME': [A continuation and defining of Resume Summary]
Progressed from fossil plant activities to; nuclear plants; to automotive
assembly/stamping; to combustion turbine construction facilities and
returned to fossil power. Currently in Nuclear New-Build, continuing to
develop interfacing ability between engineering/construction divisions and
facilitating groups such as document control, material acquisition, site
layout, construction, work package planning, installation, testing /
commissioning, and startup of systems or structures. Knowledge of OSHA
safety rules and safe work practices.
Many functions filled for clients were estimating/construction/modification
activities at electrical generating stations, fossil/nuclear/combustion
turbine, and automotive fabricating plants.
Developed system analysis including piping & instrumentation, fire
protection per NFPA (Series 800) Standards, electrical controls, system
interaction & support, prepared technical & administrative procedures and
as well the ability to perform the same.
Expertise in use of client in-house computer systems including:
PRIMAVERA - P3 / Enterprise - P3e/P5.0/P6.1//P6-V7, with Digger Analysis &
PertMaster / SureTrak, Open Plan, COBRA, INDUS-PASSPORT Version 7,
PROJECT/2, MS Project, XPM, EWCS, (CMMS)
Familiar with Civil Estimating Tools such as Timberline,
Microsoft Office Suite: Word, Excel, Access and PowerPoint, ACROBAT 8.0
Professional, LOTUS, PREMIS, PMIS-MMIS, DBASE, DBMMS, MMMS among others.
Developed Project Controls and Configuration Management skills increasing
involvement in outage coordination and turnarounds, construction site
development, supervision of crafts, planning and scheduling at all levels.
Scheduled resource loaded/leveled EPC Projects and modifications from
conceptual design through to start-up, commissioning, and implementation
for all aspects of concern, including Design Concepts Alternatives.
Conceptual Design Preparation, Engineering Scheduling of All
Disciplines,
Lead project staffs to ensure timely development of baseline schedule,
monthly updates and recovery schedules
Material costs - long lead impact as well as short-term availability,
Procurement Interface between Engineering and Material Handling,
Site preparation, Administratively and Field Engineering,
Perform field walk-through to determine "will it work?",
Prepared material list(s) from takeoffs for bidding of contracts and
purchase,
Established controls for Document Control.
Establish Communication from all Levels to all Levels.
Prepared detailed material take-offs/specs for Bills of Material and
work activity labor estimates,
Cost analysis "what ifs" leading to alternatives, Baseline
preparation, Digger Analysis,
Knowledge and experience of DOE 413.(x) DOE project management orders.
Knowledge of and experience with INPO, EPRI, ANSI, ASTM and
Reliability Improvement Standards.
Training in and preparation of Installation Work Packages for craft
personnel,
Experience with Work Control package technical review,
Prepared, reviewed and issued corrective maintenance work packages,
Developed and issued preventive maintenance records and work packages,
Preparation of and Performed Functional / Acceptance Testing and
Turnover,
Do not have a Bachelors degree,
Have more than 25 years of experience in Work Planning / Project Control,
Materials Management, Elec & I&C / Mechanical maintenance or related
areas,
Active clearance not active, but the ability to obtain one is achievable,
Engineering costs including design change expectations,
Prepared Project Controls Team Concepts; Mentoring, Training and
execution of the same,
Radiological, Health Physics and Environmental impact,
Construction / installation implementation costs / Cost Control /
Configuration Management / EVMS,
Providing implementation estimate, reports to work scope
committees/corporate offices.
Supervisory Capacity,
During project implementation, continuous interface was maintained between
Architect Engineer, Engineering Design, Procurement, Project Controls
Management, Operating Groups, Quality Control, Licensing Concurrence,
Government Permitting, Implementing Department, Startup/Testing and
Constructors. In all of the above, comply with industrial safety
requirements and practices as well as identify and respond to encountered
challenges to safe workplace conditions.
DISCIPLINES:
Mechanical, Piping, Valves, Electrical, Instrumentation and Controls,
Civil/Structural, Engineering/Procurement, Environmental - Including Waste
Water Treatment, HVAC, IT Services