Post Job Free
Sign in

Project Manager Construction

Location:
Corona, CA, 92880
Posted:
November 02, 2010

Contact this candidate

Resume:

SUMMARY OF QUALIFICATIONS

Registered Architect in the State of Massachusetts- #20614

NCARB certification for reciprocity licensure throughout US- #65129

Master of Architecture

Bachelor of Fine Arts

Highly skilled person with more than 20 years of progressive experience

from employment in A/E firms and related companies within the Syracuse, NY,

Boston, MA and Orange County, CA metro areas.

Career includes over 13 years of experience in Healthcare Design; specially

trained as a Healthcare Design professional with solid knowledge on a

variety of medical projects including but not limited to Surgery, PACU,

Inpatient bed, Imaging, Support.

Experienced in the regulatory procedures of the California Office of

Statewide Health Planning and Development from design through construction

administration. Versed and familiar with California Title 22 and Title 24

codes, specifically the 2007 and 2010 California Building Codes.

Experienced in the regulatory procedures of the Massachusetts Department of

Public Health review; process is parallel to California OSHPD, New York

State Hospital Review and Planning Council, and other state healthcare

agency guidelines throughout the US.

Versed and very familiar with a variety of other building codes and

standards such as the 2006 AIA Healthcare Design Guidelines, International

Building Code, NFPA 101 & 70, Massachusetts 780 CMR 6th & 7th Edition

Building Codes and Massachusetts 521 CMR Architectural Access Board

Regulations.

Experienced in several AutoCAD platforms (Revit, Autocad 2009, 2011,

Architectural Desktop 2007, 2008, 2009) and Microstation SE; proficiency in

Adobe Photoshop, Microsoft Excel and PowerPoint; familiarity with

Microsoft Project, Adobe Illustrator and InDesign.

Experienced with Primavera, Expedition, Constructware and Submittal

Exchange software used in construction management.

Possess a diverse knowledge of other building types including laboratory,

educational, hospitality, corporate, industrial and commercial.

Ability to create, coordinate and execute a complete project from initial

planning/ programming through design/production and to construction

supervision/ closeout.

Solid knowledge of green and sustainable practices as outlined by

Leadership in Energy and Environmental Design guidelines established by the

US Green Building Council; working toward LEED certification. Solid

knowledge of evidence-based design practices as outlined by The Center for

Health Design; working toward EDAC certification.

Cited in numerous performance reviews and letters of reference for my

strong interpersonal skills, organization, diligence and ability to both

lead and collaborate in a team-based environment

PROFESSIONAL EXPERIENCE

TAYLOR Newport Beach, CA

06/09-10/10

Project Manager assigned to the following projects:

Hoag Hospital Irvine, CA- Formerly the Irvine Medical Center with primarily

women and infants and emergency services. Jointly purchased by Hoag

Hospital and Hoag Orthopedic Institute, the 2-story medical services

building was completely renovated to provide orthopedic, cardiovascular,

emergency and ambulatory services. In addition, patch, paint and

furnishing renovations took place throughout the rest of the hospital.

The project was divided into 14 packages, 11 of which were submitted to

OSHPD for review and approval. My direct and extensive involvement were

with the following:

Package 1- renovation of existing second floor space into a 24-bed PACU and

Pre-Op recovery unit to serve Hoag Orthopedic Institute.

Package 2- renovation of selected first floor areas into a new Imaging unit

that included MRI, CT, Nuclear Medicine and Fluoroscopy, as well as a 2-

unit Cardiac Catheterization suite; renovation of a selected second floor

area into a new Central Sterile Supply that included 3 new sterilizers and

3 new washer/ disinfectors. Services were shared by both Hoag Hospital and

Hoag Orthopedic Institute

Package 2A- renovation of existing 8-OR suite on second floor with

expansion of 3 for orthopedic services to serve Hoag Orthopedic Institute

Package 3- renovation of selected first floor space into 2 operating rooms,

7-bay PACU/ Pre-Op recovery, sterile processing and support for Hoag

Hospital; renovation of selected second floor space adjacent to existing OR

suite into 2 additional operating rooms for Hoag Hospital.

Package 9- renovation of (1) existing room on each floor of 5-story patient

tower into Isolation Rooms

Package 14- coordination of all medical equipment being installed

throughout above packages; assistance with coordinating equipment being

installed elsewhere

I was responsible for the teams producing the documentation for the above,

coordinating all engineers and equipment vendors involved, direct

communications with the client's facilities and construction teams,

preparation of all submittals for OSHPD 1 review, architectural responses

and coordination of engineer's responses to all OSHPD review comments,

construction administration.

Los Angeles County South Health Center Los Angeles, CA- new 2-story, 30,

000 SF medical center in the Wilowbrook district that replaced the existing

facility in Compton. An OSHPD 3 project, services included STD, TB

examination and treatment, general screening and preventative medicine;

additionally, space for neighborhood outreach and physicians' offices were

provided.

The project was a design-build collaboration. I was responsible for

the architectural team producing documentation, efforts for project to

achieve LEED Gold certification, coordinating all engineers, direct

communications with both construction company managing project and LA

County user groups, drawing production, and submittals for LA County OSHPD

3 review.

PROFESSIONAL EXPERIENCE (cont.)

Cannon Design Boston, MA

03/05-3/09

Began as Project Architect, assigned to the following and other projects

throughout Brigham and Women's Hospital in Boston, Massachusetts:

CWN Level 7 Room Service Kitchen- completed all architectural documents,

specifications; conducted client and consultant coordination activities;

assisted with construction supervision.

Tower Level 14 Room Service Kitchen- finished Construction Documentation

set; conducted client and consultant coordination activities and

Massachusetts Department of Public Health review applications; assisted

with construction supervision.

Main Campus Kitchen Renovation/ Expansion- 15,000 SF of renovation with

$1.5M construction budget; completed all architectural documents,

specifications and Massachusetts Department of Public Health review

applications; conducted client and consultant coordination activities;

assisted with construction supervision.

Servicecenter Building Renovation- 10,000 SF of renovation into Dietary

Dept. offices, lockers, IT Data Center with $2M construction budget;

completed all architectural documents, specifications, and Massachusetts

Department of Public Health review applications; conducted all client and

consultant coordination activities; responsible for all construction

supervision activities.

Lower Level Backfill Projects- in conjunction with new Shapiro

Cardiovascular Center construction PACU expansion, OR renovations and

relocation 15,000 SF of renovation with $5M construction budget; assisted

with initial planning/ programming and client coordination.

Tower Level 7 ICU Renovations- 1,000 SF of renovation with $500,000

construction budget; completed all architectural construction documents.

Main Entrance Lobby Expansion/ Renovation- 4,000 SF of renovation/ new

construction with $8M construction budget; led 7-person team that completed

the design and construction documentation; completed architectural

specification and Massachusetts Department of Public Health review

applications; responsible for all consultant coordination.

Promoted to Project Manager and assigned to the following projects:

Elliot Hospital- assisted with 2005 Master Plan effort for new Bed/ Patient

Services Tower; later projects were addition of Pediatric Wing for existing

Emergency Department, then planning and programming for major renovations

to Emergency Department for 3 to 8 new trauma bays.

Children's Hospital Boston- assisted in 6 laboratory renovations throughout

the Enders Laboratory for a variety of research specialists investigating

pediatric illnesses. Projects ranged in size from 1500 SF to 5000 SF.

Detroit Medical Center- proposed 8-story, 150,000 SF Heart Hospital with

$125M construction cost comprised of Invasive and Non-invasive services,

Emergency Department consolidation,

PROFESSIONAL EXPERIENCE (cont.)

new specialized inpatient cardiovascular bed floor and physicians

office space; Assisted with initial planning/ programming and client

coordination.

Karmanos Cancer Center at Detroit Medical Center- Proposed 3- story, 30,000

SF of new construction and 15,000 SF of renovation of existing cancer

center with $30M construction budget; Comprised of dedicated 8-OR surgical/

recovery unit, 12-bed inpatient floor, and public/ ambulatory services,

project later included complete renovation of DMC patient recovery services

area that is part of the Surgery Department.

Led project team spread throughout 5 different US cities (Boston, NY,

St. Louis, Buffalo and Detroit) including collaborating architect;

Responsible for all team coordination and oversaw all planning/ production

efforts; Assisted with client and construction manager coordination;

Conducted both virtual and on-site project meetings for entire team.

King Faisel Specialist Hospital & Research Center- throughout Programming

and Concept phase, managed team designing and planning new Emergency

Department/ Family Services/ Outpatient Services Building and Royal/VIP

Building; anticipated 135,000 SF of new construction, construction budget

unknown; oversaw initial planning and programming efforts; assisted with

logistical efforts in support of larger overall project encompassing 2M SF

and anticipated construction cost of $700 million.

Hartford Hospital- consolidation of existing Pharmacy Department services

on High Building Levels 3, 7 and Basement to High Building Level 13;

approximately 11, 000 SF of area with $3.1M construction budget; led 8-

person team completing all documentation; completed architectural

specification; solely responsible for client and contractor coordination

and construction supervision.

Made an Associate in December 2006; Trained as healthcare design specialist

through Cannon Healthcare Fellowship program which ran from November 2006

to March 2008.

Other professional locations noted in project list. More detailed

information provided upon personal contact

PROJECT LIST

The following is a comprehensive list of architectural firms I've been

employed, clients that I've been associated and projects that I've been an

integral member to development and delivery since 1986:

HEALTHCARE

Scripps Memorial Hospital Encinitas- Encinitas, CA

TAYLOR 2010

Second Floor Remodel and Patient Room Additions

Hoag Hospital Memorial Presbyterian- Newport Beach, CA

TAYLOR 2010

West Tower 9th Floor Neuroscience Inpatient Consolidation

PROJECT LIST (cont.)

Brigham and Womens Hospital- Boston, MA Cannon Design

2005-2007

75 Francis Street Lobby Renovations

Lower Level 1 Renovations

PACU and Surgical Support Expansion

ORs 7,8,9,10 Renovation

6-Bay Phase II Recovery

Endoscopy Room Construction

Lower Level 2 Renovations

Main Campus Kitchen Renovation/ Expansion

Radiology/ Oncology Department Renovations

Cardiology Offices Relocation

CWN Level 7 Room Service Kitchen Installation

Tower Level 7 ICU Renovations

Tower Level 14 Room Service Kitchen Installation

Elliot Hospital- Manchester, NH Cannon Design

2005, 2008

Master Plan for new 6-story Bed/ Patient Services Tower

4-Bay Pediatric ED expansion

Emergency Department Renovation/ Expansion Master Plan

Eastern Maine Medical Center- Bangor, ME

Cannon Design 2007

Proposed Bariatric Center installation

Detroit Medical Center/ Karmanos Cancer Center- Detroit, MI Cannon

Design 2006-2007

Proposed 9-story Heart Hospital addition

Proposed 3-story Karmanos Cancer Center addition

Lower Level Surgical Support Renovation/ Expansion

King Faisal Specialist Hospital & Research Center

Cannon Design 2008

Planning and Programming for one campus package (New Emergency Department/

Family Services Building, New Royal/ VIP Wing) in larger 2M SF expansion

project

Jordan Hospital- Plymouth, MA The Ritchie

Organization 2002

3-story 100,000 SF addition for new entrance, Surgery and Recovery Services

York Hospital- York, PA The Ritchie

Organization 2002

New Bed/ Patient Services Tower and main entrance lobby additions

Dartmouth-Hitchcock Med. Ctr.- Lebanon, NH Shepley Bulfinch Richardson

Abbott 2001-2002

600,000 SF Addition and 400,000 SF Renovation project to existing 13-year

old medical center campus

Fresenius Medical Care NA- Lexington, MA

1997- 2000

Planning and programming for approximately 100 ground-up and turnkey

dialysis facilities throughout the US ranging in size from 10-patients/

3,000 sq. ft. to 40-patients/ 14, 000 sq. ft along with providing QA/QC

reviews of CDs prepared by all architects-of-record

PROJECT LIST (cont.)

Chenango Memorial Hospital- Norwich NY Hueber

Hares Glavin 1990

$7.1M (now $11.6M) renovation project to existing 1928, 1958 and 1970

buildings to upgrade ED services, Radiology, Ambulatory services, Inpatient

and Newborn areas and general circulation.

Community General Hospital- Syracuse, NY Hueber

Hares Glavin 1990

Capital improvements throughout primary campus building- staff function

areas expansion/ renovation, ED renovation, main entrance and lobby upgrade

Community Health Center- Syracuse, NY Crissey

Architectural Group 1988

Expansion of existing 4-story, 16,000 SF urban community health center to

32,000 SF of ambulatory and patient services space.

PSYCHIATRIC

Center for Addiction and Mental Health- Toronto, ON Cannon

Design 2008

Creation of Performance Output Specification of Phase II Campus Expansion

for Ministry of Health

Soldiers & Sailors Mental Health Center- Penn Yan, NY King & King

Architects 1994-1995

New 10,000 SF outpatient facility for acute psychiatric services

Pilgrim Psychiatric Center- Islip, NY Beardsley Design

Associates 1987

$10 M (now $17M) capital improvement project throughout campus buildings

LABORATORY

Hartford Hospital- Hartford, CT Cannon Design

2007-2008

$3.1M 11,000 SF consolidation/relocation of Pharmacy Department from High

Building Levels 3, 7 and Basement to High Building Level 13

Childrens Hospital- Boston, MA Cannon Design

2005-2006

Renovations throughout existing Enders Laboratory for 6 new research

endeavors

Aventis Pharmaceuticals- East Bridgewater, NJ

PFI Design 2000

New 4-story 50,000 SF laboratory and production facility building

CORPORATE

Blue Cross/ Blue Shield- Hingham, MA Margulies/ Perruzzi

Architects 2004

New 300,000 SF corporate office construction

AthenaHealth- Watertown, MA Margulies/ Perruzzi

Architects 2004

Relocation of existing corporate headquarters to new 120,000 SF tenant

space

PROJECT LIST (cont.)

MULTI-FAMILY RESIDENTIAL

Charlestown Lofts- Everett, MA Neshamkin French

Architects 2003

Conversion of 3-story, 14,000 SF 19th Century mill into 24 'loft-style'

condominium units

Simrah Gardens- Hudson, MA The Architects' Studio

2003

New $15M 3-building, 163-unit apartment complex

HOSPITALITY

Country Inns and Suites- Brockton, MA The Architects'

Studio 2003

New $5M 3-story, 53- room hotel with conference amenities and swimming pool

Royal Sonesta Hotel- Cambridge, MA Cambridge Seven

Architects 2003

$1.2M renovation project to all public spaces and main reception lobby

Syracuse University Shaw Dining Center- Syracuse, NY Share &

Associates 1993

Complete renovation of existing 800-seat campus dining hall to update and

improve all services

Riveredge Resort and Hotel- Alexandria Bay, NY Crissey

Architectural Group 1988

New 4-story, 129-unit resort and hotel

PROCESS FACILITIES

Minute Maid- Hightstown, NJ

PFI Design 2000

20,000 SF expansion of existing process facility for new product lines

MUNICIPAL

Franklin County Courthouse- Malone, NY Beardsley Design

Associates 1987

3-story, 30,000 SF addition that expanded existing courthouse by 200%

Town Hall- Mount Morris, NY Eshbaugh

Consulting Engineers 1986

Conversion of 2-story 3,000 SF early 20th Century fire station into new

town government offices

ELEMENTARY AND SECONDARY EDUCATION

Hamilton Central Schools- Hamilton, NY King & King

Architects 1997

1-story 12,000 SF addition to house 8 new classrooms and renowned choral/

music program

Baldwinsville Central Schools- Baldwinsville, NY King & King

Architects 1996- 1997

$5M (now $7M) capital project to address various upgrades and improvements

to all school properties within district

PROJECT LIST (cont.)

Mohawk Central Schools- Mohawk, NY King & King

Architects 1995-1996

Gregory Jarvis Jr/ Sr High School- 4-story, 40,000 SF addition housing new

gymnasium, locker rooms and Sciences Department with extensive renovations

throughout existing 1929 and 1953 buildings to relocate and expand library/

media services and cafeteria/ dining services

Harry M Fisher Elementary School- 2-story, 16,000 SF addition housing 10

new classrooms and locker space

Saquoit Valley Central School- Saquoit Valley, NY King &

King Architects 1994-1995

Addition to house 6 new classrooms and locker rooms with renovations

throughout existing school for entrance relocation, circulation

Liverpool Morgan Road Elementary School- Liverpool, NY Hueber Hares

Glavin 1990-1991

$5M (now $7M) additions and renovations project for new classrooms, media

center and circulation/ entrance improvements

COMMERCIAL

Pyramid Companies- Syracuse, NY

1989

Employed in the Tenant Coordination Department, which oversaw design and

installation of new retail businesses throughout the company's then-18

different mall locations

ACADEMIC EXPERIENCE

Adjunct Professor Mount Ida College Newton,

MA 2007- 2009

At Chamberlayne School of Design, taught both Commercial Design studio and

Adaptive Reuse/ Renovation studio to Bachelor of Interior Design candidates

in CIDA accredited Interior Design program.

EDUCATION

Master of Architecture Boston Architectural College

Boston, MA 2004

Focus of thesis was how archeology can inform architectural design, termed

by me as Archaetectology. My thesis site was downtown Syracuse, NY along

the corridor where the former Erie Canal ran through the city.

2004 Thesis Commends; O'Marah award finalist

2003 Ames Scholarship nominee; Herb Kronish Award finalist

2002 Wotjuk Scholarship nominee

2000-2001 Glassman Award winner; Steffian Bradley Award runner-up;

Portfolio Review Award finalist

Bachelor of Fine Arts University of Arizona

Tucson AZ 1991

Primary studies were studio arts with an emphasis on drawing and painting

through a variety of media. Other studies included illustration, graphic

design, photography, sculpture and art history.

LIST OF REFERENCES

D Randy Regier

President TAYLOR

949-***-****

Rick Savely

Principal

TAYLOR 949-***-****

Michael McLane

Principal

TAYLOR 949-***-****

David Blouin

Associate Vice President Cannon Design

617-***-****

Leonard Charney AIA

Director of Practice Boston

Architectural College 617-***-****

Rose Mary Botti-Salitsky Ph.D., ASID IIDA

Director Interior Design Mount Ida

College 617-***-****



Contact this candidate