Frank J. Sorrentino
Boynton Beach, Florida 33435
561-***-**** ( h)
732-***-**** (c)
abia0n@r.postjobfree.com
OBJECTIVE:
To manage complex building systems while utilizing a positive team approach
to facilitate installation through extensive plans analysis and
coordination, strategic planning, and accountability.
LICENSES:
. Master Licensed Electric; New York.
. Master Licensed Electric; New Jersey.
CERTIFICATIONS:
. Department of Defense: IT Communications Manager
. AT&T Network Systems: Wave LAN Technical Support
. AT&T Network Systems: Installation and Maintenance Testing Fiber Optic
. AT&T Network Systems: Installation and Splicing Fiber Optic
. AT&T Network Systems: Systimax Structured Cabling System
. AT&T Network Systems: Systimax Structured Cabling System Design and
Engineering
. AT&T Network Systems: Premises Distribution Systems Installation and
Maintenance
. AT&T Network Systems: Category 3 and Category 5 Product Installation
. OSHA 30 Safety Certificate
. OSHA 40 HAZWOPER SAFETY Certificate
. OSHA Lock Out Tag Out Certificate
. OSHA CSM Candidate 09
TECHNICAL SKILLS OVERVIEW:
. Extensive experience with all phases of MEP & FP coordination and
installation of renovated and new multi-family and commercial high rise
construction. Superior experience with the installation of generators,
fiber optics, low-voltage, data and security systems, UPS systems,
transfer switches and paralleling switchgear and the rating of Tier
Systems for Generator Applications in Data Centers. Extensive Hospital
Experience in low voltage applications and all special systems. Designated
Competent Person for Safety on Major Projects. Administer "Tool Box"
weekly talks. Safety ELECTRICAL EXPERT for Lock Out Tag out . Administer
weekly " work safe first" program to contractors and staff.
COMPUTER SKILLS OVERVIEW:
. All Microsoft Office products emphasis on Excel: Medium level of
expertise creating & monitoring spreadsheets.
. MS project scheduling software
PROFESSIONAL EXPERIENCE:
. TELECOMMUNICATIONS / ELECTRICAL MGR
Clark Construction Group
San Antonio Military Medical Center
Fort Sam Houston, TX
October 2008 - Present
Overall direction and selection for all low voltage systems within the
current hospital renovation and new construction. To
include, but not limited to, all tele-data for voice and data. To include
twisted pair and fiber. Furnish and install the following; Nurse-Call
system, IDS, CCTV, CATV, Security, LAN, WAN, and all Telemetry for
systems. Network integration interfacing with Architects, Contractors,
Engineers, Vendors, and any and all personal dedicated to sub-systems on
this project. This project includes seven-story edition the existing
hospital, central energy plant, new 5000 car capacity parking garage, and
renovation of existing hospital. Project duration and completing is set to
October 2011. The estimated project budget cost 800M.
. ELECTRIC / TELECOMMUNICATIONS MGR.
The Tower Group
Davie, FL
January 2006 - October 2008
Furnish and install ten-story residential/commercial complex to include all
electric, water, gas and any and all utilities to furnish for the complex.
288-room residences and commercial space. To include 6-floor parking
garage with outdoor roof top pool complex.
All site monitoring with trades, C.O.'s and CPM scheduling. Buy-out of all
trades, overall direction of all trades to include electric, plumbing,
HVAC, fire suppression, and any and all low voltage systems. Total S.F.
700,000 SQ. FT., Total est. budget: 73M
. Electrical Construction Manager
Hill International
Palm Island, Jumeriah
Dubai, United Arab Emirates
November 2004 - January 2006
Reporting directly to the Vice President Mr. David Coletti. Duties include
total electrical responsibility for the Palm Island Villas. To include the
installation of water and sewer treatment plants. All incoming electrical
utility at 135kv. The distribution of all Electric power
Sub-stations throughout the island. All street lighting, all LV
communications to include data, telephone, CATV and CCTV. Interface
between all contractors, vendors, and engineers. All site monitoring,
change orders generation and review, and CPM scheduling. Overall direction
of all other mechanical trades to include plumbing, fire protection, and
HVAC systems for the project.
. Vice President Major Projects
Cumberland Electric Company New York, N.Y.
July 2002-November 2004
. Project Executive
Norwegian Nursing Home
January 2003- July 2004
Furnish and install 10-story building, new construction to include all new
electrical service, 4,000 amp, 3 phase 4 wire service to include risers,
panels, wiring, terminations throughout. One hundred and twenty patient
care facilities with nurse call station, CCTV, CATV, security and all
lighting, indoor and outdoor. Responsibilities included coordination of
all electrical staff with GC, CPM schedule, all vendor purchases, P&L
control of total project. Project budget, 48.9 million.
. Project Executive
Manhattan Transportation Authority
1 and #9 train lines
Furnish and install all new power DC 600V for lines from downtown Battery
Park to Canal Street to include all new signal wiring (control room
terminations), all coordination with T.A. personnel for outages, purchase
of equipment, C.P.M. schedule. Project budget, $3.4 million.
. Project Executive
Coney Island Hospital
September 2002 - October 2004
Furnish and install 120,000 SF 8-story build out to include 100 room
patient care operating rooms, all new 4,000 AMP electrical service,
emergency generators, nurses call station, Fire Alarm System (Pyrotronics,
MXL/CXL system), all new risers throughout, security system, card readers,
all wiring for light, heat, power. Project budget, $76.8 million.
. Vice President - Major Projects June 1998 - July 2002
ALLCOM ELECTRIC, INC., New York, NY
June 1998 - July 2002
. Project Executive
Lennox Hill Hospital
August 1998- Sept ember 1999
Furnish and install (4) four operating rooms to include all new panels
throughout to include all Siemens Allis radio graphic equipment, all light,
heat and power. Responsibilities included coordination of electrical staff
with GC, CPM schedule, all vendor purchases, total P&L control of total
project. Project budget, $1.6 million. Furnish and install 2000 S.F. video
conference operating room to include light, heat and power to allow live
broadcast of open-heart operations for The Learning Channel broadcast live.
Project budget, $780k
. Project Executive
Manhattan Eye, Ear and Throat Hospital
September 1999 - October 2001
Furnish and install 1,000 KW generator to include all new panels for
normal, critical and emergency power. All risers, wire and connections
throughout. New nurse call station for 250 bed patient care Project budget
4.3m
. Project Executive
3 Times Square, Conde Naste
Furnish and install state of the art security system to include all card
readers, entry ports, video and audio throughout 65-story complex.
Responsibilities included coordination of electrical staff with GC, CPM
schedule, all vendor purchases, total P&L control of total project.
Project budget, $1.6 million.
. Project Executive
Radio City Music Hall
Renovation of the world's most famous music hall. Rehabilitation of
historic lighting fixtures, all data & voice. Project budget $3M.
. Project Executive
New York Public Library at Lincoln Center
Total rehabilitation including new electric service, all risers, light,
heat and power to all buildings including Vivian Beaumont Theatre. All
voice and data as well as a new Class E addressable fire alarm system.
Total Budget $5.2M
. Project Executive
Globix Corporation
Total renovation of Greenwich Street facilities for Data/Voice to include
new M.D.F. and C.D.R. throughout all cable tray layout and wire
installation Cat 5, Fiber, patch panels. Total Budget 3.7M
. Project Executive
Goldman, Sachs & Co.
Restack of various floors throughout the facility to include all electric
for light, heat, power and voice/data to include fiber Cat 5, Cat 6,
standard twisted pair. Budget 600K - 2 M
. Electrical Supt. /World Trade Center
PORT AUTHORITY OF NEW YORK, NEW JERSEY
May 1996 - June 1998
Duties Include Project Management from design inception through
construction. To include C.P.M. schedule of all trades, purchase of
equipment, contract administration, all interface between trades and
architects and General Contractors. Projects include, Class E fire alarm
systems, Elevator Recall, Class E, Fiber optics, Tenant Electrical Service
upgrade, Building Electrical Service Upgrade. Total Sq. Ft. 3.1M projects
range from 500K - 25M.
Responsible for major projects in the Building Services Group.
. Electrical Manager/ Second Vice President- Facilities
Project Manager/Facilities Management
THE CHASE MANHATTAN BANK, N.A.
New York, New York
May 1992 - April 1996
Duties Include Project Management from design inception through
construction. To include C.P.M. Schedule of all trades, purchase of
equipment, contract administration, all interface between trades and
architects and general contractors. Project includes, fiber optics
installation, Class E fire alarm systems. 1.6 Million Sq. Ft. Trading Room
design and installation 525 position. Responsible for all electrical within
The Chase Manhattan Bank properties in the United States.
- Telecommunication/Data Infrastructure Upgrade
Scope - Includes total upgrade of 1.6 MM S.F. of Prime Office Space.
Creation of a dual riser shaft to prevent "single point of failure". Fiber
Optic cable for voice as well as standard copper. Creation of a new main
distribution frame room as well as cable distribution frame room.
Responsibilities include all design, space requirements, vendor selection,
and contract negotiations as well as overall direction of contractors and
engineers. Project Budge $25M.
- Trading Floor
Scope - Design & Development of a new 525 position floor 75,000 S.F. New
electric service for the site includes total U.P.S. and redundancy for all
trading positions, generator back up totaling 3, and 1500 k.w. units.
Responsibilities also included vendor selection, remote site field tests,
design and total development from inception to going on line. Project
Management duties also included overall direction of all electrical trades
as well as consulting engineers for project. Project Budget $84M.
- Green Light Upgrade Program
Scope- Install Energy Efficient Lighting Fixtures in all Chase Manhattan
Bank Owned properties. Includes over 220 Branch locations in New York
City. Responsibilities include, budget for total project, vendor selection,
lighting design, contract negotiations with contractors and engineers, and
site monitoring. Project Budget $5.5M.
- Class 'E' Fire Alarm System - 1 CMP & 2 CMP
Scope- Install a new state of the art programmable Class 'E' system in 2.6
S.F. of occupied space. Responsibilities include Design & Development of
drawings and specifications, bidding of project, vendor selection, contract
negotiations, overall direction of all trades, and site monitoring.
Project Cost $5.5M.
- Facilities Upgrade Study
Scope- Identify all services within building structure (i.e. electric, gas,
water, steam, HVAC, BMS System. Create "as Built Conditions" to current
working drawings & specifications. Create a Master Plan for improvement of
any and all services over a five year period. Responsibilities include
vendor selection, contract negotiations, and overall direction of all
personnel. Project Cost $35M.
. Electrical /Project Manager
BURNS & ROE
Oradell, New Jersey
August 1990 - May 1992
Duties include Project Management, from design, construction, and
inspection of all trades. Familiar with C.P.M. scheduling, estimating, and
cost analysis. Also change order supplements to the project. Client
interface, consulting with all vendors and construction personnel.
Projects included: Helen Hayes Hospital, West Haverstraw, and N.Y.
Hospital Construction and Renovation, Cogeneration Plant, Cooling Tower
Installations, Sub-Stations 5KV -13.5 KV, Commercial & Industrial Building
Design and U.P.S. Systems. Project cost 22M.
. Electrical Project Manager
CONTROL-SPECTRUM ASSOCIATES ELECTRIC CORPORATION
Staten Island New York
October 1984-August 1990
Responsible for all major electrical design, engineering, and consulting
with all major clients. Also all field site visits with any and all
vendors, and electrical personnel. Responsibilities included: Scheduling
and cost implementation of all major A/E, R/E projects. Projects range
from 100K-16M.
. Electrical Project Head
Staten Island Hospital
Responsibilities included overall direction and installation of New
Electrical Service, FACP, Nurse Call, CCTV, CATV, Security System, Magnetic
Doors, and Locks.
. Electrical Project Head
Coast bar Soap Project
Responsibilities included total electrical rehabilitation on 4 (four) high
speed packing lines, from raw product to finished package to warehouse
storage.
. Electrical Project Head
Major Tower Renovation
Project: PROJECT TIDE
Responsible for major changes on all Motor Control Centers located in the
tower area. Duties included all Major Control Centers relocations with
minimum production downtime.
EDUCATION:
. Bachelors Degree
Science and Electrical Engineering
. Masters Degree
Construction Management
FLUENT LANGUAGES:
. English
. Spanish ***