Michael Schreckengost
B.S. Architectural Engineering (Structural / Civil Emphasis), EIT
University of Wyoming, 1998
San Mateo, CA 94403
WEBCOR CONSTRUCTION dba WEBCOR BUILDERS
May 2009 - Present Cost Manager (CM / GC): San Francisco, CA
. Project: San Francisco General Hospital
. Construction Cost: $690,000,000.00
. Project Description: The new San Francisco General
Hospital will have 284 beds, 14 operating rooms,
and provide the only Level-1 trauma care in the
city. The 448,000 sq ft steel moment frame
structure will have two levels below grade and
eight levels above grade including a mechanical
penthouse. Ties to the existing hospital will be
made by means of a tunnel at the B1 level and a
bridge at the 2nd floor.
. Responsibilities: Process Owner Change Orders /
Work Release Letter (WRLs). Track allowances,
budgets, and Purchase Orders. Manage Cost Meeting
with Ownership. Manage Force Account System (Time
& Materials); ensuring that the Project Management
team processes Tags and pricing in a timely
manner. Manage Project Labor both Salary (GC) and
Field hourly labor Costs.
March 2005 -April 2009 Assistant Project Manager (GC Core & Shell):
San Francisco, CA
. Project: Millennium Tower, 301 Mission Street
. Construction Cost: $350,000,000.00
. Project Description: 60 story high end residential
high-rise with 14 story high end mid-rise over 2
stories of amenities and mixed use and a sub-grade
five level parking garage. Concrete structure
with glass and aluminum curtain wall.
. Responsibilities: Preconstruction GMP Buyout /
Budgets. Scopes Bought out / Managed Closeout :
Tower Cranes, Crane Erection and Take down, Man
lifts, Miscellaneous Metals and Structural Steel,
Temporary Construction / Rentals, Hardscape,
Landscape, Pool, Spa and Water feature, Valet
Elevator, Exterior Pavers, Ipe Decking, Parking
Garage Striping and signage, Permanent Valet
Fence, Caissons, Demolition of City Bridge,
Temporary Power. Cost Management through
conversion from Prolog into CMiC construction
software.
February 2004 - February 2005 Estimating Engineer (GC Core & Shell):
San Mateo, CA Corp. Office
. Responsibilities: Plan review and quantity
takeoffs by scale and from AUTOCAD. Organized
budget quotes from approved Subcontractor List.
Pre-bid jobsite meetings and review for logistics.
Timberline estimate set-up and input with quality
review by lead Estimator.
August 2003 - January 2004 Concrete Engineer (Webcor Concrete): San
Francisco, CA
. Project: Lucas Digital Arts Building #2, SF
Presidio
. Construction Cost: $250,000,000.00
. Project Description: Four 4 Story Office buildings
all on a podium over a sex level sub-grade parking
garage. All done with concrete structure, precast
panels, and unitized glass.
. Responsibilities: Check Subcontractors
Submittals, Generate Soffit and slab Submittals,
and write RFIs. Schedule concrete, concrete pumps,
flat work Subcontractors, and manage placement
during pours. Track concrete quantities and cost.
May 2003 - July 2003 Layout Engineer (Webcor Concrete): San
Francisco, CA
. Project: Lucas Digital Arts Building #2, SF
Presidio
. Construction Cost: $250,000,000.00
. Project Description: Four 4 Story Office buildings
all on a podium over a sex level sub-grade parking
garage. All done with concrete structure, precast
panels, and unitized glass.
. Responsibilities: Layout footings, columns, walls,
depression, place grid lines, grades, elevations
and assemble Forms as needed under mentorship of a
Union Carpenter.
July 2002 - April 2003 Estimating Engineer (Webcor Concrete): Hayward, CA
Concrete Div. Office
. Responsibilities: Figure construction joint
formwork logistics. Quantity and logistical
takeoff. Gathered budget quotes from formwork and
material suppliers.
February 2002 - June 2002 Quality Control Manager (Webcor Concrete): CA,
All Projects
. Concrete Quality Control / Quality Assurance
. Responsibilities: My job was to statistically
derive a method to measure placed concrete elements
in reference to ACI and Webcor Company Policies. I
was also charge with implement for means and
methods for random selection and measurement of
concrete elements.
April 2001 - January 2002 Concrete Engineer (Webcor Concrete): San
Francisco, CA
. Project: Foundry Square Building #2 & #4, 405 &
500 Howard Street.
. Construction Cost: $80,000,000.00 & $45,000,000.00
(Repetitively)
. Project Description: 10 Story Concrete Office /
Mixed Use Building with precast panels, unitized
glass, frame build glass
. Responsibilities: Write RFIs, schedule concrete,
concrete pumps, flat work Subcontractors, and
manage placement during pours. Track concrete
quantities and cost.
KIEWIT COMPANIES
October 2000 - February 2001 Traffic Engineer / Labor Foreman (Gilbert
Western): Park City, UT
. Project: I-80 / US 40 Silver Summit Interchange
Reconstruction
. Construction Cost: $25,000,000.00
. Project Description: Demolish one bridge and
construct two bridges with approaches and
collectors.
. Responsibilities: Plan work for Maintenance of
Traffic; signage placement, closures, organize
Highway Patrolmen supervision. MSE Walls track,
report cost and quantities. Supervise night work,
and set up day shift labor forces - self
performing.
December 1999 - October 2000 Cost Engineer (Wasatch Contractors): Salt Lake
City, UT
. Project: Joint Venture Salt Lake City I-15
Reconstruction
. Construction Cost: 1,300,000,000.00
. Project Description: Complete Design / Build
reconstruction of Interstate 15 corridor through
Salt Lake City including all arterial intersection
and I-80 junctions. Redesign and upgrade all
infratructor.
. Responsibilities: Track and report daily costs,
quantities, cut / fill material mass flow, time
cards, and permanent materials tickets.
November 1998 - December 1999 Engineer (Wasatch Constructors): Salt
Lake City, UT
. Project: Joint Venture Salt Lake City I-15
Reconstruction
. Construction Cost: $1,300,000,000.00
. Project Description: Complete Design / Build
reconstruction of Interstate 15 corridor through
Salt Lake City including all arterial intersection
and I-80 junctions. Redesign and upgrade all
infastructor.
. Responsibilities: Drainage / Wick Drains /
Structure Excavation / track cost, quantities,
write FDM / RFIs, track and order Permanent
Material.
July 1998 - November 1998 Cost Engineer (Wasatch Constructors): Salt
Lake City, UT
. Project: Joint Venture Salt Lake City I-15
Reconstruction
. Construction Cost: $1,300,000,000.00
. Project Description: Complete Design / Build
reconstruction of Interstate 15 corridor through
Salt Lake City including all arterial intersection
and I-80 junctions. Redesign and upgrade all
infrastructures.
. Responsibilities: Finish Grade / PCCP / Import;
order materials and haul trucks, track cost &
quantities, supervise night shift import; field
measure and compare quantities, order and pay
Permanent Materials.
May 1998 - June 1998 Punch-List Engineer (Gilbert Western): Salt
Lake City, UT
. Project: Bangerter Highway
. Construction Cost:$15,000,000.00
. Project Description: New highway construction.
. Responsibilities: Supervise Subcontractors for
final punch list of work, and reclamation of
aggregate pit. Perform minor labor tasks to
complete minor punch list items.
USDA Forest Service
June 1997 - August 1997
June 1996 - August 1996 Engineering Technician (G8) (Internship):
Medicine Bow / Route National Forest, Kremmling, CO
. CAD Work
. Structural Rehabilitation
. Total Station - Quarry Survey
. Logging Road Rough In
. GPS verification
. Minor Labor Tasks
. Red Card - Class B Saw
Wyoming Department of Transportation
May 1994 - August 1994 Engineering Technician (Internship):
Engineering Department, Laramie, WY
. Hot Mix Batch Plant Inspector
. A/C Pavement Inspector
. Aggregate Inspector
. Traffic Signal Survey
. Survey Verification of Bench Marks