Post Job Free

Resume

Sign in

Project Manager Quality Control

Location:
Coppell, TX, 75019
Posted:
October 17, 2010

Contact this candidate

Resume:

PhillIP R. SCHRAG, LEED AP

*** ******** **. *******, ** 75019 469-***-**** abi5jz@r.postjobfree.com

CONSTRUCTION PROJECT MANAGER

Construction Project Manager with over 17 years experience in managing a variety of construction project types ranging

from quarter million dollar tenant finish out projects to twenty five million dollar processing facilities. Experience includes

negotiating and managing General Contracts and Subcontracts, project scheduling, permitting and overall project

coordination.

Key Skills

Retail, Commercial & MOB Bidding/Estimating/Proposals Design/Build Experience

• • •

Projects

Shell Building Projects Pre construction activities

• Contracting/Subcontracting

• •

Medical Office Finish out Budgeting & Cost Controls Permitting

• • •

Projects

General Office Finish out Projects Change Order Management Structural Background

• • •

Process Installation Projects Scheduling and Coordination • SureTrak & P3 Fluency

• •

Warehouse/Big Box Projects • •

LEED Accredited Professional Prolog & Oracle Fluency

Professional Experience

ABSTRACT CONSTRUCTION COMPANY (Carrolton, TX) Project Manager, 9/07 to 12/09

Managed multiple renovation projects including office building lobbies and a building retrofit for loft

condominiums. Managed ground up Medical Office Building plus four of the doctor office finish outs

in the building.

The Whiting turner contracting co. (Dallas, TX) Project Manager, 5/97 to 9/07

Managed all phases of ground up and renovation projects including a total of more than one million

sqft of warehouse facilities for GRAINGER, Frito Lay and Pepsi Cola; retail buildings for JCPenney,

process facilities and process installation for BAR S Foods, Coors Brewing Co., Frito Lay and Fresh

Express; as well as several varied finish out projects from basic office space to the artistic finish out

of Sega GameWorks.

Rogers O’Brien Construction (Dallas, TX) Quality Control Manager, 5/96 to 5/97

Managed MEP Quality Control on an $85 million Clean Room computer chip facility for Texas

Instruments. Ensured adherence to design documents from contracting through installation via a

strict Quality Control Program.

The Whiting turner contracting co. (Baltimore, MD) Project Engineer, 6/92 to 5/96

On Site management of subcontracts, changes, scheduling and quality control for project types as

referenced in Whiting Turner listing above.

Education

VIRGINIA TECH (Blacksburg, VA)

Bachelor of Science, Building Construction, 1992

Bachelor of Science, Civil Engineering, 1992

References

• Available Upon Request

Project Listing

Available Upon Request

PhillIP R. SCHRAG, LEED AP

227 Edgewood Dr. Coppell, TX 75019 469-***-**** abi5jz@r.postjobfree.com

Phil Schrag Resume Page 1

PROJECT EXPERIENCE

– Representative Sample of Managed Projects and Project Types

Caddis Partners

• 32,000 SF Medical Office Building shell space, Plano, TX $2.6M

• Four - 4,500-8,500 SF Medical office lease space finish out, Plano, TX ~ $1.2M total

CWS Capital Partners

• Nine-story renovation of office building into Loft Condominiums, Austin, TX, $9M

Office Building Renovation of Public Areas.

• GRANITE Properties – Lobby, basement, roof and site upgrades for two towers, Dallas, $7.5M

• CBRE – Lobby & Elevator upgrades, Irving, TX $750K

Sega GameWorks

• High level tenant finish-out of new entertainment facility with intensive show lighting and

sound systems, Grapevine, TX, $5.2 million

AEGON

• Multiple phase renovation of office space, Plano, TX, $1.4 million

o Various similar office lease space finish outs for Lord Baltimore Properties, Lincoln Properties,

and others.

JCPenney

• Two - 100,000 SF retail store shell and finish out, Rockford, Ill; Sherman, TX ~$4.5M

W.W. Grainger

• 248,000 SF high-spec distribution center with 37,000 SF support office space, Southaven, MS, $14M

• 384,000 SF high-spec distribution center with 36,000 SF support office space, Roanoke, TX, $16M

• 30,000 SF Grainger retail store w/ warehouse storage, Carrollton, TX $2.2M

• Three 13,000-20,000 SF renovations retail stores/warehouses including office and retail areas.

Fresh Express

• Add Data Room to existing cold storage facility office;

• Add new rooftop make-up air unit to existing cold storage facility, Grand Prairie, TX

Coors Brewing Company

• Three phase refrigeration upgrade. Installation of a 1500 ton ammonia compressor system, a 3000

ton Ammonia Compressor system and a 2400 ton Glycol/Ammonia chiller system, $9.5 million

Frito Lay, Inc.

• Pretzel Line, Baked Tortilla Chip and Baked Potato Chip line, Dallas, TX, $9.3 million

• Finish Goods Warehouse: 48,100 SF, processing, packaging and raw material warehouse, 7,300 SF

plant retrofit, Beloit, WI, $4.7 million

• 80,000 SF warehouse expansion with 15 acres site-work and 27,000 SF of office space, San

Antonio, TX, $6 million

• Warehouse Expansion: 30,000 SF expansion in five phases, and Waste Water Treatment Facility

siding installation, Orlando, FL, $3.2 million

Pepsi-Cola

• 120,000 SF Warehouse addition, Mesquite, TX, $5.5 million

GRAFCO

• Install new blow-mold equipment and associated utilities

BAR-S Foods

• 42,000 SF renovation and 25,000 SF addition for new hot dog and corn dog production lines

including all MEP/process services to support owner supplied production equipment, Design-Build,

GMP, Altus, OK – $1.5M D/B fee (project costs withheld per agreement with client)

Related Urban Development/Palladium

• Preconstruction services and budgeting for infrastructure development of 60 acre Victory Center,

downtown Dallas (prior to Related pulling out of the Victory project)

Phil Schrag Resume Page 3



Contact this candidate