Jim Trahan
Education Lamar University, Beaumont, TX
B.S., Civil / Structural Engineering
Seminars ASCE Wind Loads for Building and Other Structures
Gould Pump School
Steam trap
Bearing design
Pipe Line Design - hydraulics
STAAD
Experience 2006-2010 Olson Engineering Bridge City, TX
CIVIL / STRUCTURAL ADVISOR (DCP)l At TOTAL in Port
Arthur
Worked as the Civil / Structural Advisor for the Total
Project Group on the DCP Expansion project - the Total
Project 2.1 Billion
Preformed Engineering audits on Flour design for the project
in the California office.
I reviewed all the heavy lifts for the project and made
recommended changed to the lift plan that were incorporated
into the lifts.
I made design change recommendations to the Coker structure
that were incorporated into the design by Flour.
I reviewed foundation designs on large compressors installed
in the project.
I made design recommendations on large tank foundations that
were incorporated into the design.
I participated in model reviews on all units in the three
phase of the project.
I reviewed pipe rack design with Flour and made
recommendations.
I maintained a log of change request and solutions on all
contracts for the DCP project.
I worked in the inspection group for a short period and
reviewed changes and solutions to construction required
changes.
I worked with the Flour design team on levee repairs for
part of the tank farm.
I followed the repairs to the Vacuum Tower concrete support
structure due to poor concrete placement in forms.
Project Manager - Civil Olson Officer
Prepared FEL documents for new Air Compressor at local
Chemical Plant
Prepared FEL documents for conveyor work at local Paper
Mill.
Preformed Pipe Stress Analysis on several lines for
Petrochemical and Paper Mill facilities in the area.
Preformed Structural Analysis on structures using STADD soft
ware for Petrochemical and Paper Mill facilities in the
area.
Jim Trahan - Continued
Page 2 of 4
2004-2006 ReCon Mgmt. and Engineering Sulphur, La
Project Manager - Civil At Valero in Port Arthur
Project manager on new 180 ft radio tower, communication,
generator buildings.$950,000
Project manager on top sludge injection on Coker
Units.$1,200,000
Project manager on Fresh Water supply from LNVA to refinery
- new routing, new Pump Station.$15,000,000
Project manager on trench covering project for several units
- safety project.$150,000
Project manager caustic pump replacement MRU and HFAU
units.$375,000
Project manager on plant wide fireproofing in operating
units.$250,000
Project Manager - Civil - Sulphur Office
Project manager and design engineer on venting and flaring
project at a LNG facility.$200,000
Project manager on DAF environmental compliance project at
local refinery.
Project manager and design engineer on a FEL for $3 MM
project to add 20,000 gpm diesel water pumps to local
refinery.
Project manager on stress analysis of piping and equipment
for chemical plant.
Preparing project and construction estimates for refinery
and chemical plant projects.
Project management on projects to install air compressors
system at local facilities.
Estimating on E&C projects for local refineries.$120,000
2000-2004 Unocal Beaumont Terminal Nederland, TX
Terminal Engineer - Civil
Project management of projects from scope, schedule & budget
development throughout construction.
Project engineering and inspection on dredging for main dock
and SPR dock. 1,750,00
Project management on the project to increase crude capacity
to terminal over docks, installation of two 16 inch loading
arms and reactivating existing barge dock; project cost.
$2,750,000
Project and design for new 30 inch line from docks to tanks
8000 feet away. $4,000,000.
Project and design engineering on mechanical and civil
portions of tank project, including
roads and containment levee design, total project costing
approximately. $11,000,000
Project management and design engineering on $300,000 piping
project to extend crude lines under main dock and adding
risers at several locations. Preformed hydraulic
calculation, budget estimates, schedules and preliminary
engineering for several projects that were not funded.
Project and design engineering on 7,000 hp pump station
project, costing. $4,000,000
1999-2000 Huntsman Chemical Port Arthur, TX
Project Engineer - Civil
Project Management of projects from scope development
through construction.
Pipe stress analysis using CEASAR, structural design using
STAAD III.
Jim Trahan Continued
Page 3 of 4
1992-1999 Temple-Inland Evadale, TX
Senior Engineer - Civil
Design engineer in mechanical, civil, structural and
architectural fields.
Project engineer on mechanical, civil, structural and
architectural projects from
$10k to $2.2 million.
Supervised co-op-training program.
Trained younger in-house engineers in pipe stress, pressure
vessel design, API
tank design and structural design.
Used CAESAR III to perform pipe stress for several
petrochemical jobs.
Performed dynamic pipe stress design to establish loads for
foundation design
1991-1991 Matrix Engineering Beaumont, TX
Design Engineer - contract
Used CAESAR III to perform pipe stress for several
petrochemical jobs.
Performed dynamic pipe stress design to establish loads for
foundation
design.
1982-1991 Drainage District No 7 Port Arthur, TX
Staff Engineer
In charge of ditch maintenance and repairs for over 300
miles of ditch systems.
Designed rail road crossings.
Developed new standards for ditch entrances.
Prepared and approved permits.
Annual inspection on Hurricane Levee System - 32 miles
In charge of herbicide program on levees and in ditch
systems.
Sounding on ditch systems.
Administered the co-op training program.
1982-1982 Micro Associates New Orleans, LA
Design Engineer
Worked at Midland South Nuclear Power plant as Instrument
engineer.
Reviewed instrument packages for individual systems and
approved or modified design.
1979-1982 Triangle Engineers Port Arthur, TX
Project and Design Engineer
Performed dynamic analysis for reciprocating compressor
foundation.
As design and stress engineer was responsible for pipe stress
and structural
design for 120,000 bd FCC unit and 250,000 bd crude units.
Performed approximately 250 pipe stress analyses.
Designed four story exchanger structure and multistory pipe
racks.
Acted as department head for pipe stress and vessel design.
Jim Trahan Continued
Page 3 of 4
1979-1982 Triangle Engineers Port Arthur, TX
Project and Design Engineer
Performed dynamic analysis for reciprocating compressor
foundation.
As design and stress engineer was responsible for pipe stress
and structural
design for 120,000 bd FCC unit and 250,000 bd crude units.
Performed approximately 250 pipe stress analyses.
Designed four story exchanger structure and multistory pipe
racks.
Acted as department head for pipe stress and vessel design.
Acted as project and design engineer for boiler
reconstruction after major fire In Puerto Rico
1976-1979 Stubbs, Overbeck & Assoc. Inc. Beaumont, TX
Design / Project/ Field Engineer
Worked at Goodyear Tire and Rubber, Bmt. on $5.2 million
wing-tack unit expansion
Work on vessel foundations, pumps, instrumentation
modification, vessel design
and structural design on above project.
Worked as project and construction engineer for sulfur
recovery and acid unit at
Olin Chemical, Beaumont.
Performed design at steel mill on drilled shaft foundations,
building modifications,
railroad design, environmental system for coal pile and
lighting structures.
1975-1976 De Leuw Cather and Company, Eng. Beaumont, TX
Field Engineer
Served at Port of Beaumont as one of the port engineers
performing duties of design, field inspection, damage repairs
to wharf for ship and drill rig mishap
COMPUTER PROGRAMS WITH WHICH I AM COMPUTER PROGRAMS WITH WHICH I AM
PROFICIENT FAMILIAR
AUTOCAD Lt PARADOX 3.5 (DATA BASE)
AUTOPIPE TRI-FLEX (PIPE STRESS)
Microsoft Word VESSEL (VESSEL DESIGN PROGRAM)
Microsoft Excel HEC I (HYDROLOGY)
Microsoft Project (PROJECT HEC II (HYDRAULICS)
MANAGEMENT) DWOPER (DYNAMIC HYDRAULICS)
Internet MICA PAYROLL
Microsoft Power Point Microsoft Exchange
CAESAR 3.1 (PIPE STRESS) NUTSHELL (DATA BASE)
PIPELINE (PIPE STRESS) NORTON UTILITY
STRUDEL (STRUCTURAL DESIGN) NOVEL NETWORK (PC LAN NETWORK
STAAD III (STRUCTURAL DESIGN) SYSTEM)
TIMELINE (PROJECT MANAGMENT) LOTUS 123
Gould Pump Selection
API pressure vessel design
409-***-**** abi3r5@r.postjobfree.com
186 Shadowdale
Bridge City, Texas 77611
4