John Rynczak
*** ******* ******* ****, ********, Tennessee 37067
abi2x1@r.postjobfree.com
SUMMARY
Industrial engineer with extensive experience in lean manufacturing, new
product/process implementation, capacity planning, and material logistics.
Background in automotive, appliance and electronics manufacturing. Strong
interpersonal skills and ability to interact positively with all levels of
management.
EXPERIENCE
Electrolux, Springfield TN
2009-present
Lean Coordinator
. Train personnel in lean techniques, 5S, visual management, standard
work, continuous improvement, and demand material flow.
. Designed and implemented new supermarket for small parts material
system and reduced production downtime by 420 minutes in first 9
months of 2010.
. Organize and run productivity improvement workshops resulting in the
reduction of 6 operators.
. Created layout of main warehouse using AutoCad. Established new
address system for preparation of PFEP (plan for every part).
. Created JDS's (Job details sheets) for warehouse operations and
material delivery operations, resulting in better understanding of
processes for supervisors and team leaders.
. Created VSM for "Somipress sub-assembly area" and "Pinnacle warehouse
flow" workshops.
GM, Linden NJ, Spring Hill TN, and Warren MI, 1998-
2009
Sr. Industrial Engineer
. Industrial engineering lead for implementation of new body shop to
manufacture Chevy Traverse. Supervised team of subject matter experts
during product implementation.
. Developed processes for flexible body shop to be capable of
implementing future products without disrupting production to maximize
efficiency and effectiveness of manufacturing line.
. Reduced labor by 5 to 7% every year without having to invest large
amounts of capitol. Created VSM (Value stream maps) then analyzed
operations and eliminated waste to combined lightly loaded operations.
. Ran productivity workshops in general assembly, 6 workshops with each
resulting in the reduction of 2 operators (-12 total). Also reduced
ergonomic stressors through design and implementation of material
delivery racks at 140 operations.
. Industrial engineering lead for Vue MCE (mid cycle enhancement).
Coordinated industrial engineering resources to ensure that new parts
and processes were introduced without negative impact to current
production. Project met launch and budget requirements.
. Ran workshops in 5s, visual management, standardization, line
balancing, and "waste identification and elimination" to train staff
on most efficient production techniques.
. Created and maintained departmental layouts of 1.5 million sq. ft.
facility using AutoCad to maximize use of production space and
increase efficiency.
. Developed standard operating procedures (SOP) for both direct labor
and indirect labor operations to maximize efficiency and minimize
costs.
. Developed and implemented "tugger routes" to eliminate fork lift
requirements in production environment.
. Routed and tracked 2500 parts in general assembly department to
develop and maintain effective and efficient material delivery system.
Maintained "PFEP" (Plan for every part) to ensure material flows
effectively through department
. Assisted in implementation of electronic production pull system to
maintain "min/max" of line side materials. Reduced line side inventory
from 4 hours to 2 hours and eliminated production downtime from
material shortages.
Emery Worldwide Airways (CNF), Swedesboro, New Jersey,
1998
Industrial Engineer
Supervisor of Quality/Industrial Engineering department.
. Established staffing model for manning sorting conveyors and
developing threshold limits of facility to properly plan for Christmas
rush.
Merco/Savory (Welbilt Corporation), Lakewood New Jersey,
1994-1998
Facilities Manager
Managed facility projects including machine rebuilds, preventative
maintenance, long term production planning, and new product implementation.
. Successfully implemented Boston Market warmer and McDonald's toaster
on time and without adding any addition manpower or major equipment.
Wheelock Inc., Long Branch, New Jersey, 1989-
1994
Manufacturing Engineer
Led manufacturing team for new product development for the "Americans with
Disabilities" Strobe.
. Worked with suppliers to develop parts and tooling to implement
production of ADA/UL Strobe while ensuring project came in below
budget and met schedule.
. Instrumental in implementing "shop floor control system" to create
standards for all direct labor employees.
. Effectively supervised 22 production employees to maximize
productivity.
EDUCATION
M.S., Operations Management, Kettering University, Flint Michigan
B.S., Industrial Engineering, The College of New Jersey, Ewing NJ