Post Job Free

Resume

Sign in

Engineer Manager

Location:
Franklin, TN, 37067
Posted:
October 18, 2010

Contact this candidate

Resume:

John Rynczak

*** ******* ******* ****, ********, Tennessee 37067

615-***-****

abi2x1@r.postjobfree.com

SUMMARY

Industrial engineer with extensive experience in lean manufacturing, new

product/process implementation, capacity planning, and material logistics.

Background in automotive, appliance and electronics manufacturing. Strong

interpersonal skills and ability to interact positively with all levels of

management.

EXPERIENCE

Electrolux, Springfield TN

2009-present

Lean Coordinator

. Train personnel in lean techniques, 5S, visual management, standard

work, continuous improvement, and demand material flow.

. Designed and implemented new supermarket for small parts material

system and reduced production downtime by 420 minutes in first 9

months of 2010.

. Organize and run productivity improvement workshops resulting in the

reduction of 6 operators.

. Created layout of main warehouse using AutoCad. Established new

address system for preparation of PFEP (plan for every part).

. Created JDS's (Job details sheets) for warehouse operations and

material delivery operations, resulting in better understanding of

processes for supervisors and team leaders.

. Created VSM for "Somipress sub-assembly area" and "Pinnacle warehouse

flow" workshops.

GM, Linden NJ, Spring Hill TN, and Warren MI, 1998-

2009

Sr. Industrial Engineer

. Industrial engineering lead for implementation of new body shop to

manufacture Chevy Traverse. Supervised team of subject matter experts

during product implementation.

. Developed processes for flexible body shop to be capable of

implementing future products without disrupting production to maximize

efficiency and effectiveness of manufacturing line.

. Reduced labor by 5 to 7% every year without having to invest large

amounts of capitol. Created VSM (Value stream maps) then analyzed

operations and eliminated waste to combined lightly loaded operations.

. Ran productivity workshops in general assembly, 6 workshops with each

resulting in the reduction of 2 operators (-12 total). Also reduced

ergonomic stressors through design and implementation of material

delivery racks at 140 operations.

. Industrial engineering lead for Vue MCE (mid cycle enhancement).

Coordinated industrial engineering resources to ensure that new parts

and processes were introduced without negative impact to current

production. Project met launch and budget requirements.

. Ran workshops in 5s, visual management, standardization, line

balancing, and "waste identification and elimination" to train staff

on most efficient production techniques.

. Created and maintained departmental layouts of 1.5 million sq. ft.

facility using AutoCad to maximize use of production space and

increase efficiency.

. Developed standard operating procedures (SOP) for both direct labor

and indirect labor operations to maximize efficiency and minimize

costs.

. Developed and implemented "tugger routes" to eliminate fork lift

requirements in production environment.

. Routed and tracked 2500 parts in general assembly department to

develop and maintain effective and efficient material delivery system.

Maintained "PFEP" (Plan for every part) to ensure material flows

effectively through department

. Assisted in implementation of electronic production pull system to

maintain "min/max" of line side materials. Reduced line side inventory

from 4 hours to 2 hours and eliminated production downtime from

material shortages.

Emery Worldwide Airways (CNF), Swedesboro, New Jersey,

1998

Industrial Engineer

Supervisor of Quality/Industrial Engineering department.

. Established staffing model for manning sorting conveyors and

developing threshold limits of facility to properly plan for Christmas

rush.

Merco/Savory (Welbilt Corporation), Lakewood New Jersey,

1994-1998

Facilities Manager

Managed facility projects including machine rebuilds, preventative

maintenance, long term production planning, and new product implementation.

. Successfully implemented Boston Market warmer and McDonald's toaster

on time and without adding any addition manpower or major equipment.

Wheelock Inc., Long Branch, New Jersey, 1989-

1994

Manufacturing Engineer

Led manufacturing team for new product development for the "Americans with

Disabilities" Strobe.

. Worked with suppliers to develop parts and tooling to implement

production of ADA/UL Strobe while ensuring project came in below

budget and met schedule.

. Instrumental in implementing "shop floor control system" to create

standards for all direct labor employees.

. Effectively supervised 22 production employees to maximize

productivity.

EDUCATION

M.S., Operations Management, Kettering University, Flint Michigan

B.S., Industrial Engineering, The College of New Jersey, Ewing NJ



Contact this candidate