Post Job Free
Sign in

Quality Assurance Engineer

Location:
Minneapolis, MN, 55411
Posted:
December 17, 2010

Contact this candidate

Resume:

PATRICK W IGOE

**** ****** ***. *.

Mpls, MN ****1

612-***-****

abhzzo@r.postjobfree.com

OBJECTIVE

I would like to obtain a position in an energetic challenging

environment. I have successfully functioned in a wide variety of

positions in supervisory, hands-on and also technical and non-

technical positions.

JOB HISTORY/DUTIES

Picker/Packer

Spherion Corp.

Rodgers, MN

Start Date: Aug 07 End Date: May 09

- Familiarize myself with the layout of a large warehouse environment

and the respective location of various products.

- Familiarize myself with the required paperwork to complete both the

filling of orders and the packing of such orders in a timely cost

efficient and correct manner.

- Organize the processing of multiple orders in an efficient error-

free flow.

- Work on special projects as directed by management.

- Perform these tasks with an emphasis on customer requirements and

overall quality assurance requirements.

Recruiter/Operator

STS Staffing/Masterson Personnel

Fridley/Anoka, MN

Start Date: 6/1/06 End Date: 6/1/07

- Worked as a temporary Recruiter for STS Staffing on projects that

required the recruiting of personnel nationwide to man key

industries in the event of a strike situation. This required

excellent communication skills, sales skills and the ability to

coordinate air travel, per-diem etc. as required. I worked on three

projects like this for them for STS and also for their affiliate

Strom Engineering.

- Also operated an injection molding press for Masterson personnel.

Inspector/Recruiter/Apprentice Painter

National Eng. Resources/STS Staffing/Top Notch Painting

Mpls/Fridley, MN

Start Date: 1/1/04 End Date 1/1/06

- Did Mechanical Inspection and also non-destructive testing within a

QC organization involved in heavy mfg for Schwing Mfg Inc..

- Served as a full time recruiter for STS Staffing.

- Worked as a apprentice painter on a part time basis for Top Notch

Painting.

QA Engineer

APA Optics

Blaine, MN

Start Date 1/1/03 End Date 1/1/04

- Involved all aspects of Quality Engineering for the Blaine MN

facility.

- Performed auditing activities in successfully obtaining the ISO

9000 certification.

- Implemented qualification plans for two primary products under

development.

- Coordinated and executed testing activities involving several

technicians and numerous data collection activities.

- Analyzed data and reported test results.

- Coordinated QA activities with a contract Quality Assurance company

in Hong Kong and our Mfg. in China.

Co-Owner Home Based Business

MEL Inc.

Fridley, MN

Start Date 6/1/97 End Date 1/1/03

- Horticultural business operated in conjunction with my Fianc e in

her area of expertise

- Met with clients to determine design content, layout and schedule

the execution of projects.

- Purchased appropriate products suitable for the needs of the

client.

- Worked on-site in the planting and maintenance of said projects.

Laboratory Supervisor

Medtronic Inc.

Fridley, MN

Start Date 6/1/1977 End Date 6/1/2007

- Supervised testing activities in a Product Assurance laboratory for

the Leads division

- Scheduled numerous simultaneous projects to meet project schedules.

- Coordinated the hiring/employee development and performance

evaluations of technicians.

- Ordered capital equipment and participated in the budgeting and

planning of resources for future needs.

- Was the key contact person between the lab, project management R&D,

and Reliability Assurance Eng.

- Involved in various related projects as requested by management.

- Implemented a comprehensive training program and effected the

updating of test protocol to ensure the competency of personnel and

the applicability of testing techniques in an ever-changing

technological environment.

- Issued a quarterly Quality Assurance report on the activities of

the Division directly to the Division Vice President.

Senior Engineering Aide

Medtronic Inc.

- Performed electro-mechanical testing of materials; components and

also final product acceptance and validation testing.

- Issued formal written reports, which formed the basis of either

product acceptance, redesign or other corrective action.

- Designed fixturing and developed test methods and the documentation

of these into formal test procedures.

Destructive Analysis Technician

Medtronic Inc

- Involved metallurgical preparation and analysis of materials and

mfg. welding processes using statistical process control methods.

- Did specialized testing and failure analysis on a troubleshooting

basis.

Mechanical Inspector

Medtronic Inc

- Duties in Mechanical Receiving Inspection included the set-up and

use of all gaging equipment, including precision surface plate and

non-contact measuring techniques.

All my positions at Medtronic were the result of my advancement to more

challenging positions.

EDUCATION/CERTIFICATIONS

Diploma: Precision Inspection and Materials Testing - Dist I Technical

Institute, Eau Claire, WI

40 Credit Hrs: St. Cloud State University

Diploma: Cathedral High School, ST. Cloud, MN (State Wrestling Champion as

a senior.)

Certified Quality Engineer: Thru the American Society of Quality Control.

Numerous Statistical and Quality Principles classes.



Contact this candidate