Post Job Free
Sign in

Project Manager Engineer

Location:
Cordova, TN, 38018
Posted:
December 07, 2010

Contact this candidate

Resume:

Michael J. Fiorenza

**** ******* **.

Cordova, TN 38018

815-***-****

Email: *********@***.***

Career Objective: Project Management/Project Engineering

Summary: I possess many years experience with Project Management and

Project Engineering in the Automotive Industry. I have completed

numerous industrial safety courses, and management training

courses. I have managed service departments, technical

support/parts departments for large scale OEM's as well as launch

support teams for a large-scale industrial controls provider

(Square D Company). With over fifteen years experience in

Powertrain and Body In White facilities, Overall Equipment

Efficiency and Predictive Maintenance systems have become my

specialties.

Education: Industrial Safety Training course.

Completed April 2008.

Rockwell International RS View32 HMI Level 1 & 2 Programming

Course. Completed in June, 2005.

Rockwell International Control Logix PLC Programming

Course. Completed May, 2005.

Fanuc CNC Ladder Logic Programming Course.

Completed August, 1997.

Fanuc Digital Servo Integration Course.

Completed August, 1997.

Modicon/Telemechanique PL7Pro System Integration Course.

Completed October 1997.

Modicon/Telemechanique CAY Motion Integration Course.

Completed November 1997.

NUM CNC System Integration Course.

NUM Digital Servo Integration Course.

NUM Ladder Logic Programming Course.

Completed October, 1995

Management Practices and Principles.

Completed May 1993.

DeVry University, Phoenix, AZ - Associates Degree. Graduated December

1977.

Work History:

. March 2008 to October 2010 - Tenaris, Inc. Blytheville, AR. Employed

as a Contract Automation Project Manager responsible for writing

Automation and Electrical project specifications, in adherence to NEC

electrical specifications, develop scope deviations, scheduling and

project planning. Design and oversee new equipment installations,

upgrades on existing equipment, and civil projects related to the

electrical project requirements, including facility lighting and power

upgrades. Responsible for project schedules, timelines and completion

dates. Oversee project spending, approve invoices and authorize for

payment, implementing Health and Safety procedures and policies to

ensure a safe work environment. Manage large groups of outside

contractors and oversee PLC and HMI programmers and installation

crews. Typical project budgets can range in excess of $25M.

. March 2007 to February 2008 - KUKA Flexible Production Systems, Inc.,

Sterling Heights, MI. Employed as a Contract Startup Integration and

PLC design Engineer, integrating DeviceNet I/O scanners, Panelview HMI

applications using RS View Studio Edition, PLC applications using RS

Logix 5000 and Rockwell GLx Safety PLC. Also integrated numerous

Banner Vision systems used to detect specific component details. Acted

as Production Support for the daily Skilled Trades staff. Also

responsible for final documentation certification (PLC, HMI, DeviceNet

backups and electrical schematic updates) at DaimlerChrysler's Body In

White (BIW) Division assembly plant located in St. Louis, MO.

. August 2006 to March 2007 - DuroByte, Inc. Windsor, ON. Employed as a

Contract Controls and Software Engineer at LinaMar, Inc. located in

Trenton, Ontario Canada (Tier 1 component supplier for Delphi and Ford

Motor Company) providing CNC and PLC ladder logic and part program

modifications and process improvements. Also setup communication

networking between numerous CNC's, PLC's and Banner Vision Systems

exchanging barcode, serial number, date and time information and

process shift register status.

. September 2005 to August 2006 - ABB Robotics, Auburn Hills, MI.

Employed as a Contract Startup Integration and PLC design engineer

integrating DeviceNet I/O scanners, Pilz Safety Bus PLC, Panelview

applications using RS View Studio Edition and PLC applications using

RS Logix 5000. Acted as Production Support for the daily Skilled

Trades staff and trained new hires for ABB. Also responsible for final

documentation certification (PLC, HMI and Robot software backups,

DeviceNet backups and electrical schematic updates using AutoCAD) at

DaimlerChrysler's Body In White (BIW) Division assembly plant located

in Belvidere, IL.

. May 2005 to August 2007 - Brechon Farms, Dixon, IL. Contract Project

Manager and software designer overseeing the project budget, schedule,

scope of work for sub-contractors and all software development

involved in updating a large scale grain storage facility with state

of the art technology. Integrated PLC controlled, in process

temperature monitoring and control of grain in storage bins utilizing

thermocouples, level sensors, pressure transducers and infrared level

monitors interfaced to a Human Machine Interface (HMI) display. Also

monitored the load on all transfer conveyors to maintain constant

delivery rates utilizing current monitoring transformers on all

induction motors. The rate of delivery was controlled by variable

speed frequency drives. Designed and implemented a system to monitor

and control the temperature of grain stored in all storage bins

preventing spoilage of stored product. Savings generated by this

system returned the capital investment in three years by reducing the

spoilage percentage of the stored grain from 7% to 9%, down to 1%

spoilage.

. May 2003 to May 2005 - DaimlerChrysler Power Train, Kenosha WI.

Contract Project Manager overseeing project budgets, schedules, and

scope of work for sub-contractors. Provided numerous Process

Improvements to the new 3.5L engine line including mechanical,

electrical, pneumatic, PLC, HMI and servo improvements. Provided cycle

time analysis and process improvements, as well as Diagnostic

Vibration Analysis used to detect broken and worn tooling preventing

critical machine damage. Successful implementation of this Diagnostic

Vibration Analysis system improved tool life by more than 35% and

improved the quality of the crankshafts manufactured at that facility.

Also involved in the implementation of Lean Manufacturing Technology

and practices. Provided complete updated AutoCAD 2000 electrical

schematics for areas modified.

. September 1997 to May 2003 - Square D Company. Troy, MI. Acted as a

Contract Lead Applications Engineer for Square D Company providing OEM

startup support and launch support in numerous DaimlerChrysler

facilities (Detroit's Mack Ave. Engine Plants 1 & 2, Detroit Axle,

Sterling Heights, Mound Rd., Trenton MI, Kenosha WI,). Duties included

Lead Applications Engineer role, supervising as many as 25

Applications Engineers, OEM training and support during initial build,

integration, training and support during install at the end user. Also

provided FIS (Factory information System) integration and Andon

implementation at several locations as well. Implemented Plant wide

Lean Manufacturing Technology at the Kenosha Engine Plant. Performed

this assignment through my company (Machine Tool Builders, Inc.).

Please see the description for Machine Tool Builders, Inc. immediately

below.

. August 1995 to May 2003 - Machine Tool Builders, Inc. Rockford, IL.

Owner and Operator of a mid-sized machine tool rebuild, retrofit and

service company employing as many as 20 employees with annual sales in

excess of $2.5M. Duties included Project Management responsibilities

for day to day operations of the company, managing and overseeing all

employees, sales and service. Developed and maintained schedules for

all active projects. Developed the scope of work descriptions

submitted to sub-contractors and monitored the progress of all

projects. Also acted as a hands on engineer writing software,

designing machine concepts performing startups, debug and service when

needed.

. August 1995 to September 1997 - Marshall & Huschart, Inc. Contract

Project Manager for the installation of a six (6) machine, Gun

Drilling cell provided to the Taiwanese government in Kaoshung, Taiwan

ROC. As Project Manager, responsibilities included overseeing the

project schedule and the scope of work descriptions for onsite service

employees and sub-contractors. Designed all PLC programming, part

programming, HMI design, servo tuning, process improvements, final

acceptance and final documentation. All machines were controlled by

NUM 1060 CNC's with digital servos and spindles.

. August 1992 to August 1995 - Unisig Corporation. Elgin, IL. Employed

as Manufacturing, Controls and Service Manager. Unisig manufactured

CNC controlled Gun Drilling and Cylindrical Grinding machines.

Supervised daily machine tool assembly, debug and startup from concept

to installation. Responsible for all hardware and software design

concepts and development for all product lines. Supervised all

domestic and international service related responsibilities for all

product lines. Unisig closed in August of 1995.

. April 1990 to August 1992 - Bourn & Koch Machine Tool, Inc. Rockford,

IL. Directly employed as the Service and Parts Manager. Managed the

service and parts departments servicing medium to large CNC controlled

machine tools. The Service department consisted of ten service

engineers covering both domestic and international arenas. The Parts

department annual sales averaged $800,000 to $1,000,000 in annual

sales. Responsible for Project Management of all field installations

and sub-contractors.

. Additional work history available upon request.

References:

1. Ideal Machine Tool Technologies, LLC

50515 Corporate Dr.

Shelby Township, MI 48315

Vincent Hylton

Tel. : 586-***-****

Cell : 248-***-****

*.******@*-****.***

2. Duro Byte, Inc.

555 Talbot Road

Windsor, Ontario - Canada

N9A 3J6

Murray VanWieringen

Cell : 519-***-****

*************@********.***

3. Sotorion, Inc.

13957 Hall Rd.

Shelby Township, MI 48315

Mike Eddy

Cell : 586-***-****

*****@********.***

4. J&A Consulting

1450 South St.

Owosso, MI 48475

Brian Baker

Cell : 248-***-****

*******@*******.***



Contact this candidate