QAISER BHATTI
Email: ********@*******.***
Over ten years of experience working in the instrumentation, electrical and
control field performing design, installations, maintenance,
troubleshooting, calibration and commissioning. Focused on excellence in
job performance and safety. Excellent communication, time management, and
organizational skills.
CORE COMPETENCIES:
> Familiarity with codes (ISA)
> Experience with P&IDS, Data sheets, Instrument Index and
requisitions.
> Field Instrumentation and Controls Engineering technical leadership
and expertise
> Extensive Foundation Field bus installation and troubleshooting
skills.
> Development of instrumentation logic and loop diagrams.
> Experience with DCS, PLCs and Industrial Networking.
> Working knowledge of Intools, CAD and Microstation.
> Experience of electrical/instrumentation/control maintenance for
Oil Sands Mining and Upgrading and Utilities.
> Calibration and operations of field instruments, configuration of
control loops.
> Routine maintenance for the instruments and Plant shutdowns.
> Solid back ground in installation, set-up, configuration,
networking, troubleshooting and programming various PLCs (Allen
Bradley RS Logix, PLC 5, PLC 500) and DCS including DeltaV, ABB 800
Xa and Triconix.
> Expertise in Bentley Nevada system for condition monitoring
instrumentation and services, sensors, systems and diagnostic
services for monitoring machine vibration.
> Strong Mechanical skills.
> Strong knowledge of C++, JAVA, VISUAL BASIC, VB Script and Ruby.
> Strong work ethic with an orderly analytical approach to problem
solving.
> Excellent communication, team-working, organizational and
analytical skills. An innovative problem solver and decision maker.
EMPLOYMENT EXPERIENCE
DCS Commissioning Tech
Jun 2014 to Present
(Kentz Engineering, Imperial Oil Kearl KEP project Fort Mackey Alberta
Canada)
. Support DCS Commissioning activities on a verity of Electrical,
Instrumentation and Control equipments.
. Perform Serial interfacing between PLC, DCS and HMI.
. Perform Graphics and logic checks.
. Implement C&E testing ensuring standards achieved.
Automation Technologist DCS / PLC Programmer
Nov 2012 to Jun 2014
(TrueNorth Automation, Calgary Alberta Canada)
. Programming of RS Logix 5000,800 XA ABB DCS system for Devon
Jackfish 3.
. Test configuration and develop Graphics for Honeywell Experion DCS
system.
. PLC upgrade for Apache Midal project.
. Create and modify design documents including Control Narrative, IO
list, Shutdown Key Architecture diagrams, P&ID's and Communication
Topology.
. Design, review and markup drawings, including Control Panel
layouts, Control Panel IO schematic and Fiber optic wiring
diagram.
. FAT and SAT for the DCS and PLC panels.
Project Technologist PLC Programmer
Jan 2012 to Oct 2012
(Hinz, A Rockwell Automation Company,Calgary AB)
. Kearl Imperial Oil Data Concentrator project RS Logix 5000
programming using Modbus TCP/IP.
. Programming E3 Relays,4160 Tiebreakers,GE T60,F35,C60 and also
setup Device Net networks for MCC devices information to Delta V
DCS.
. Participated in FAT at Emerson and also site commissioning for
Data Concentrator project.
. Kearl Imperial Oil HVAC system programming and site acceptance
testing.
. Develop procedure for FAT and SAT document for Shell peace River
Project..
. Build, configure and install Rockwell HMI and control systems.
Engineering Technologist
April 2011 to Dec 2011
(City Of Edmonton)
. Design Layout for the camera installation and its linkage to the
Traffic control System.
. Approve Design Drawings and set specification for the equipment
and material use.
. Prepare Contract documents, supervise contracts performance to
ensure installation of safety cameras on planned intersection with
given timeframe.
. Evaluate performance of the equipment, establish failure rates for
the equipment and perform the preventive maintenance.
. Test installed equipment and verify proper operation to ensure
compliance with the applicable guideline and standards.
DCS/MCR Planner
2010 to April 2011
(Pyramid Corporation CNRL, Fort MacKay, AB)
. Work with the Control group implement changes in the Field.
. Generate PM's for Fire Alarm System, SIS and Field devices.
. Provide support for field maintenance for DCS /SIS and PLC related
issues.
. Writing procedures for instrumentation,electrical,Fire Alarm
PM's
. Using CMMS, JDE and Primavera for tracking work done in the field.
. Coordinate with material management for required spare parts and
material.
E/I Technologist
2008 to 2010
(Pyramid Corporation CNRL, Fort MacKay, AB)
. Inspects and test new instruments.
. Commissioning & start-up of the plant.
. Troubleshoot Instrumentation and Electrical equipment problems and
repair them.
. Calibration of field instruments and configuration of control
loops.
. Maintain and debug PLC's DCS and SCADA pack.
Control Technologist
2005 to 2007
KAL Electric Windsor ON Canada
. Control and power panels' design and manufacturing of panels.
. Supervise erection, installation and pre-commissioning of
electrical equipments.
. Trouble-shooting and maintenance of AC drives (Siemens, Hitachi),
PLCs (Mitsubishi, Allen-Bradley), power panels and Wireless
control system.
. Negotiations and co-ordination with vendors and clients were
performed.
. Development, implementation and evaluation of preventive
maintenance programs.
Application Engineer 1998 to 2002
Pak Synthetic Ltd. Karachi Pakistan
. Electrical and instrumentation maintenance of plant.
. Plant modification and expansion Prepared detailed engineering.
. Lead a team of technicians for the relocation and upgrade of small
projects.
. Participated in the erection, installation, commissioning and
startup of assigned projects in the plant expansion.
. Performed and supervised the installation, configuration and
tuning of instruments and control panels for the expansion of
plant.
. Evaluated develop and implemented preventive maintenance programs.
. Developed maintenance priorities, ensure process reliability and
implement calibration procedures.
. Coordinate with planning department for maintaining inventory.
EDUCATION AND CREDENTIALS
Instrumentation Engineering Technology
2008
(NAIT Edmonton Alberta)
Electronics Engineering Technician Diploma
2005
(St.Clair College Of Arts and Technology Windsor Ontario)
MS Applied Physics
1998
(University of Karachi)
MEMBERSHIPS:
. The Association of Science and Engineering Technology Professional of
Alberta(ASET)
. Instrumentation Systems and Automation Society(ISA)
TRAINING AND CERTIFICATION:
. VTScada Operations & Configuration Course.
. Delta V Hardware & Troubleshooting by Emerson Process Management.
. Communication Bus Interface with Delta V by Emerson Process
Management.
. Tricon/Tristation Basic Maintenance by Invensys.
. Radiation Safety Training Programs by Stuart Hunt.
. CSA Workplace Electrical Safety certificate.
References: Available upon request.