Resume
NAME : Hemen Kumar Das
Email : ********@*****.***
Work Visa : H1B (valid till 2014)
SUMMARY : Twelve years of IT experience as Technical lead/Product Lifecycle
Management (PLM) Consultant for multiple projects spread across
Implementation, Administration, Configuration, Customization and CAD
Integration.
EDUCATION
. Bachelor of Technology (B.Tech) in Aerospace Engineering, from Indian
Institute of Technology (IIT), Madras, India. 1991.
. Master of Technology (M.Tech) in Aerospace Engineering, from Indian
Institute of Technology (IIT), Madras, India. 1993.
CERTIFICATION:
Green Belt for 6-Sigma Project by TCS-GE (Aircraft Engines).
TRAINING:
Teamcenter 2008 Customisation Training.
TECHNICAL SKILLS:
PLM/CAD Siemen's Teamcenter Unified Architecture (V2008,
V2007/2005 SR1/V9/V8), 4-Tier, 2-Tier, Web
Server(JBOSS, WebSphere),Web Tier, Manufacturing, Catia
Manager, Technomatix, UGNX Manager, Teamcenter
Community and Project
Operating Windows XP/2000/NT/98/95, AIX, HP-UX, Sun Solaris
Systems
RDBMS Oracle 10i/9i/8i for Teamcenter, eMPlanner, SQL Server
Languages C, ITK, C++, Ufunc, Java, ASP, HTML, PLMXML, SQL,
PL/SQL
Other Tool(s) Eclipse, Visual Studio, Perl, MS Office products, Web
Server, Toad, Oracle Apps.
EXPERIENCE SUMMARY
IoVista Inc. USA Jan 2008 onward PLM Software Consultant (Honda
of America Manufacturing)
Iknowvate May2007 - Jan 2008 PLM Consultant (Topcon
Technologies, USA Positioning System, Applied
Material)
Mastek Ltd., India May2006 - Jan 2007 PLM Technical Lead: Euriware,
France
GSSL, India Mar 2005 - Oct PLM Consultant ( Ford India,
2005 Siemens)
TCS, India Jul 1998 - Feb Assistant Consultant (Siemens,
2005 GEAE, Tecnomatix)
PROJECT EXPERIENCE:
Jan 2008 - Till date
ioVista Inc.
Project Teamcenter Manufacturing Implementation
Location Honda Manufacturing of America, Marysville, OH
Project Siemens PLM Software, a business unit of the Siemens Industry
Description Automation Division and a leading global provider of product
lifecycle management (PLM) software and services is
implementing digital manufacturing technology at Honda of
America Manufacturing. Siemens' Teamcenter Manufacturing
application is the foundation upon which Honda is building a
strong collaborative environment to build future models with
improved plant productivity.
Teamcenter Unified Architecture TCUA 2007 was selected to
implement Honda Automotive PLM system. The project involves
installation of TCUA 2007, deployment of Honda customization
and configuration, legacy Data Migration, Process and Resource
creation, CAD Integration and visualization tools.
Activities Teamcenter Tools Development using ITK
Form Customization
Building Development, Test, QA and Production environments
Integration of CAD (Catia) with Teamcenter
Manage the IT/system architecture supporting the Teamcenter
application environment
Teamcenter Installations and configuration, Updates, Patches
BMIDE and Teamcenter Data Model
Teamcenter administration in IBM AIX environment
Troubleshooting and User Support
Monitor usage, manage back-up and recovery process
Teamcenter Web Client installation
File Management System (FMS) across sites
Security Services, Deployment of SSO
Performance Testing
MSOffice Integration
Translation Solution Toolkit (TSTK)
LDAPSync, Make_User and PS_Upload utility(EBOM/MBOM)
Product, Process legacy dataload
Workflow, Report, Query, Access Manager
JT Bi-directional Translator
Teamcenter Visualization
Teamcenter Project
Teamcenter Community
Documentation and version management
Role(s) PLM Software Consultant
Technical IBM AIX, Windows XP, Siemens' TCUA (2007,2008), Teamcenter
Platform Project and Community, Oracle-10g, WebSphere, JBoss, Eclipse,
Visual Studio
May 2007 - Dec 2007
Iknowvate Technologies
Project -2 Implementation of Siemens' Teamcenter Engineering and
Community.
Location Topcon Positioning System, Livermore, CA
Project Topcon Positioning System aims to implement Teamcenter
Description Engineering and Teamcenter Community in its pilot PLM
project. The current environment at Topcon is highly
manual and mostly paper driven.
Topcon Positioning Systems plans to implement the
Teamcenter solutions in Collaboration, BOM and CAD
Management, Document Management, Change Management,
Project Management and Requirements Management.
Activities Oracle Installation and database creation
Configuration of Corporate Server
Two-tier installation
FMS, FCC setting
Installation of Web Application Manager
Deployment of ear file with JBoss (Application Server)
Setting up Apache Distribution Server for Four Tier rich
client
Four Tier OTW client installation
Thin Client Configuration
Installation of SharePoint, SQL Server and Linux
Conference Server
Installation of TC Community 2007 and Configuration
Database migration
Role(s) Technical Consultant (PLM)
Duration 2 months
Technical Siemens' Teamcenter Engineering and Community(2007),
Platform Oracle-10g, Windows Server, Linux
Project -1 Development support for TCE-ECOSync Utility and
Enhancement of TCE ART(Account Request Tool)
Location Applied material, Santa Clara, USA
Project The goal is to provide global user support to
Description Teamcenter-ECO Sync and Teamcenter (AR) Account Request
Tool. Scope also includes customization of these
utilities.
Activities Preparation of functional document, Technical
Specification
Code development in ITK/Java/ASP
Unix Shell Scripting
Writing PL/SQL code
Testing and implementation
Role(s) Technical Consultant (PLM)
Duration 5 months
Technical Teamcenter Engineering V9.0, ITK, ASP, SQL, Toad, Oracle
Platform Apps.
Jun 2006 - Jan 2007
Mastek Ltd, Pune
Project Building of Teamcenter Support Center for Euriware client
Location Pune, India and France
Project The project requirement is to create a new Teamcenter
Description Environment for Euriware projects. A new team was built
to carry out various Project activities.
Activities Requirement Gathering
Installation of Teamcenter and Configuration
Setting up Eclipse environment
Translation of document
Document preparation, Test Plan, Test Cases
Implementation of project
Visiting client for project discussion
Role(s) Technical Lead (PLM)
Duration 8 months
Technical Siemens' Teamcenter, Java, Eclipse
Platform
Mar 2005 - Oct 2005
GSSL Ltd., India
Project -2 Implementation of Teamcenter Engineering V9 at SIRIM,
Malaysia
Location SIRIM, Malaysia
Project Implementation of Teamcenter Engineering V9.1.2 which
Description involves Planning, Installation, Configuration and
deployment of Portal client, Web client, Portal
Visualization and NX
Activities Answering Query on Requirements Analysis, Server Hardware
and Software requirements
Installing and configuring License Manager(FLEXlm)
Oracle Installation and database creation
Installation of Teamcenter Engineering V9 and
Configuration
Creating and configuring Volume server
Installing and configuring NXManager, Portal Visualization
Deploying Two-Tier Portal client (Local Server
Environment) and configuring with Teamcenter Engineering
server
Installing and configuring Apache Server for Teamcenter
Engineering Web client and Teamcenter Engineering help
Conducting user training
Creation of ITK scripts to create user Organization
Role(s) Team Leader, Consultant
Duration 2 months
Technical Teamcenter Engineering V9.1.2, Web Server, ITK
Platform
Project 1 Teamcenter Engineering Development Team Support to UGS
Location Pune, GSSL Ltd.
Project To Support UGS group in Teamcenter Engineering admin
Description activity. Helping development team to understand
Teamcenter Engineering concept and Support any other
Teamcenter Engineering related activities
Activities Installation, Database creation, Configuration and Testing
of Teamcenter Engineering & UGNX modules
Troubleshooting with Teamcenter Engineering
Admin/installation issues
Conducting training in User Organization, Access Manager,
Business Modeler, WorkFlow, PSE, QueryBuilder, NX-Manager
Support for Teamcenter Engineering Development team of
FORD India
Role(s) Technical Lead
Technical Teamcenter Engineering V9, Oracle 9
Platform
Jul 1998 - Jul 1999 Tata
Consultancy Services (TCS), India
Project 6 Setting up Teamcenter Engineering Collaborative Context
(CC) Module and integration with Tecnomatix eMPlanner
Location UGS (USA, India), Tecnomatix (Israel)
Project The aim of this project to integrate Tecnomatix eMPlanner
Description with TC Manufacturing and testing its functionality.
Activities Integration of Teamcenter Engineering with Tecnomatix and
trouble shooting
Setting up Teamcenter Engineering Web Access, Application
Interface Web Server (AIWS)
Installation of Oracle server for Tecnomatix-eMPlanner
Installation of Teamcenter Engineering, Tecnomatix
software, UGNX
Configuration of Tecnomatix License Server
Installation of Teamcenter Engineering CC Module
ITK coding for creating Application Interface Objects
Allocation of Resources for Functional testing/Regression
Testing
Submitting Problem Report (PR) separately for Tecnomatix
Escalation of PRs to Development team through GTAC
Generate Metrics on PRs each week and report status
Testing of Kits developed for GM
Role(s) Project Leader
Location
Duration 12 Months
Technical Teamcenter Engineering V9.0, UGNX, Windows 2000/NT/XP, Web
Platform Server, eMPlanner V7
Project 5 Setting up and administration of Teamcenter Engineering./
Manufacturing and Support to Development team
Location UGS Development Center, Hyderabad, India
Project The project involved installation of Teamcenter
Description Manufacturing Modules - Navigator, PSE, Workflow,
Incremental Change Management, MSE, Baseline Creation,
Process Configuration, Revision Rule, Variant, Report
Generation, Resource Manager, Classification, MVE,
Automatic Creation of Assembly Structure, Workpiece,
Consumed Items, JT viewer, Appearance Configuration, FSE.
Activities Installation/configuration of Oracle server/processes for
Teamcenter Engineering.
Installation & Configuration of Teamcenter Engineering, UG
NX Integration
Setting up Volume, iMANFS, web server
Trouble-shooting installation issues
Allocation of Resources for Functional testing/Regression
Testing
Using different environment for regression testing
ITK coding for each module for autotest
Submitting Problem Report (PR) on UGS TAC site
Generate Metrics on PRs each week and report status
Creating test documents and test result document
Testing of Kits developed for GM
Role(s) Project Leader
Duration 14 Months
Technical Teamcenter Engineering V8/9, UG 18, NX2, HP-UX, Windows
Platform 2000/NT/XP, Web Server, ITK
Project 4 Wall Thickness Utility for Engine Components of Auto
engines for Bajaj Auto, Pune, India
Location UGS Development Center, Hyderabad, India
Project Development of a new tool to determine minimum wall
Description thickness of engines build with Unigraphics. User could
specify three ranges of thickness and results were
displayed with different colors.
Activities Requirement study, analysis, Design, Testing, Support and
Documentation
Analyzed user requirement and designed Graphical User
Interfaces using UI-Styler
Developed Ufunc code based on Ray Penetration method
Testing of the tool using different engine models
Maintenance/upgrading and problem fixing of the tool
Role(s) Project Leader
Duration 9 Months
Technical Ufunc, UI-Styler, UG 18, HP-UX10
Platform
Project 3 UG Manager Customization at GE-NP, Italy
Project GE-NP needed customization of UG Manager for "File New" and
Description "File Save As". Behaviors of these two menu items were
modified.
Activities Understanding the requirement
Design of new user interface
Testing and implementation
Designed Graphical User Interfaces using UI-Styler
Ufunc code development and testing
Role(s) Project Leader
Duration 2 Months
Technical Ufunc, UG 18, UI-Styler, Windows 2000
Platform
Project 2 Design, Development and analysis for GEAE projects
Location GEAE, Cincinnati/Bangalore
Project GEAE projects consist of code conversion, Igniter design of
Description CFM56 Engine, Thermal analysis of Engine components and
intranet development.
Activities Requirement study, Testing and implementation
Conversion of STP code in Fortra90 for airfoil cooling
holes
Creating subroutines for boundary calculation
Testing the new code
Requirement study and existing problem study of CFM56
engine Igniter
Use of 6-Sigma tool and GEAE-YFT tool to design a new
igniter
Analyzing the results of new design
Thermal analysis of various engine components
Conversion of model from Ansys to Patran
Applying Boundary conditions and running the model for a
life-cycle
Analyzing the results
Design and development of intranet for GEAE Bangalore
Design Online Customer Feedback, Quality Process, Digital
Cockpit
Role(s) Project Leader
Duration 2 years 8 months
Technical Fortran90, YFT, Patran-Pthermal, ASP, HTML, Javascript,
Platform Windows2000
Project 1 Development and Implementation of Mail Migration Tools
Location TCS, Chennai, India
Project TCS needed tools to convert Outlook/Netscape mailbox to
Description Lotus Notes mailbox.
Activities Requirement study
Design and development of tools
Writing detailed project plan
Implementing the tools at various TCS locations
Maintenance and bug fixing
Writing code in Visual Basic
Creating a Graphical User Interface
Writing test plan
Testing the tools
Role(s) Project Leader
Duration 13 months
Technical Visual Basic, Windows 2000
Platform
Mar 1993 - Jun 1998
IC&SR, IIT Madras, India
Project Name Studies of Shock Wave Propagation in gas-particle mixtures
Project The project objective was to develop an algorithm to study
Description shock waves in a gas particle mixture. Existing algorithms
were studied and a new improved algorithm was developed
Activities Detailed Literature survey for this project
Preparation of project plan and other document
Development of algorithm for the numerical study
Numerical Analysis in C/Fortran for simulation of shock
waves propagation in a gas-particle mixture
Presentation of results in Journal and Symposium
Four publications based on this project
Role(s) Senior Scientific Officer
Duration 5 year 4 months
Technical C, Fortran77, MS Office
Platform
References:
Sitaram Koppaka, Siemens PLM
(Solution Architecture & Project Manager at Honda)
Email : *******.*******@*******.***
Cell : 317-***-****