Résumé **** Eldridge PKWY Apt ***
Houston, TX ***77
abhtp2@r.postjobfree.com
Cell: 713-***-****
Haojun Chen
Senior Offshore Structural Engineer
PROFESSIONAL EXPERIENCE SUMMARY
• Twenty three years of structural engineering experience covering offshore marine/civil
engineering structures.
• Familiar with main offshore structural code (ABS, DNV, API and AISC).
• Conversant with major structural analysis software package SACS.
• Extensive experience with scantling design of various floating platforms and vessels.
• Structural supervision of junior engineer to complete the structural analysis and design.
QUALIFICATIONS/EDUCATION
MSE, Structural Engineering, Chongqing University, China 1986
BSE, Civil Engineering, Hunan University, China 1982
Visiting Scholar, Kyoto University, Japan 1993-1994
Language: Fluent English and Chinese
PROFESSIONAL EXPERIENCE
2007 – Present: Enertech Services International Inc. Houston, TX, USA
Lead Senior Offshore Structural Engineer
JIC-250 Jackup: 2007
JIC-250 is a Jack-up drilling unit for 250ft operating water depth and 20,000ft drilling depth with cantilever skid range
40x20ft. My task was to do the scantling design of hull, leg, spudcan, jacking house, cantilever and substructure, drill
floor, deck house and so on. I led the structural team to do the global and local analysis including strength, leg
buckling and plate buckling with software ANSYS and SACS.
CJ-46 Jackup: 2008
CJ-46 is a jack-up drilling platform for 375ft operating water depth and 30,000ft drilling depth. My work was on the
detail structural design of main hull, cantilever, deckhouse, leg and spud-can etc..
SDU-1502 Semisubmersible Drilling Platform: 2008
SDU-1502 is a Semi-submersible Platform for 1830m water depth and 10,000m drilling depth. My mission on the
project was to do scantling design of pontoon, column, upper hull, drill floor and so on. I led structural team to do
global and local analysis including strength and buckling with software ANSYS.
BTU-80 Tender Barge: 2008
BTU-80 is a tender barge unit providing tender operation in mild environment. My work on the project was to do
scantling design and the structure analysis.
JIC-300D Jackup: 2009
JIC-300D is Jack-up drilling unit for 300ft water depth and 25000ft drilling depth with cantilever skid range 60x30ft.
My task was to do scantling design of hull, leg, spudcan, jacking house, cantilever and substructure, drill floor,
deckhouse and so on. I led the structural team to do the global and local structural analysis including strength, leg
buckling and hull bucking.
SDU-3002 Semisubmersible Drilling Platform: 2009
SDU-3002 is a Semi-submersible Platform with 3050m water depth and 11430m drilling depth. My work was to do
scantling design of pontoon, column, upper hull, drill floor, braces and so on. I led the structure team to do analysis to
1/3
Résumé 1333 Eldridge PKWY Apt 834
Houston, TX 77077
abhtp2@r.postjobfree.com
Cell: 713-***-****
primary structures, such as pontoon, column and upper hull, and structures, such as drilling floor, helicopter deck, etc.
with software ANSAS.
FDD-232 Floating Dry Dock Design: 2009
This dry dock is 230m long, 60m wide and 19.5m high with two cranes of 20mtx40m. Its lifting capacity is 20,000mt.
My work on the project was to do scantling design of pontoon, decks, wings and crane.
NPCC SEP450-Self-Propelled Jackup Vessel: 2010
This project is a wind farm installation vessel for 280ft water depth with four triangular lattice legs, 280t primary crane
and 50t auxiliary crane. My task on the project was the detail design of primary structure and outfitting, including
platforms hull decks, crane foundations, tanks and equipment foundations.
CNOOC Offshore LNG Terminal: 2010
This project is a conceptual Design of CNOOC LNG offshore terminal. My task was to develop the design basis and
LNG FSRU configuration and to write the general report and topic study report, LNG unloading system for offshore
applications.
CNCP Study of Jackup Rig Operation on Persian Gulf: 2010
This study includes five parts, jacking down and lowering the unit, field transiting, going on location and
jacking up, preloading and potential issues and precaution. I worked as a person in charge on this project.
1988 – 2006 Huagang Communications Design and Research Institute, Hunan, China
Principal Engineer
2005 – 2006 Heishipu Xiangjiang River Bridge
The structure type of the bridge is continuous arch of three spans made of steel tube filled with concrete.
The span is 102 m + 144 m + 102 m. My work in the project was project manger of construction
inspection and analysis in installation.
2004 – 2003 Xiangjiang River Bridge on Wuyi Road
This was a project for upgrading the old bridge. The structure type is pre-stressed concrete continuous
beam with span 20+46+24 meter. I played a role of project manager of design of rehabilitation of the
bridge.
2002– 2001 Tanshao Express Highway Crossover Bridge
There are two steel bridges on this express highway and the spans are 60, 72 meter, respectively. The one
with span of 72m is an arch structure of steel tube filled with concrete and the other structure is a steel
arch. My work on the project was design and analysis of the structure.
2000 Gaoqiao Steel Bridges
This bridge is a supported cable structure with span of 60 meter and made of steel. My work on the
project was design and analysis to structure of the bridge.
1996-1999 Shuyuanlu Viaduct
This is a large scale viaduct with bridge area more than 50,000 square meters, made of reinforced
concrete. I worked on the project as a project manager and the structural engineer.
1995 Shenzhen Plastic Model Factory
There are a cluster of workshops made of steel structure with span of 24 meters on the worksite, total
workshop area of 40,000 square meters. My work on the project was basic design and detail design as a
structure engineer.
1991-1992 Taizimiao Bridge
The structure type of this bridge is spatial arch made of steel tube filled with concrete with span 92
meters. My work on the project was to complete basic and detail design as a structure engineer.
2
Résumé 1333 Eldridge PKWY Apt 834
Houston, TX 77077
abhtp2@r.postjobfree.com
Cell: 713-***-****
1990 Jinfan Mansion
This is an 18~story reinforcement concrete shear wall structure with 24,000square meters. I worked on
structural analysis and design as a structural engineer.
1989 Complex buildings of Qongzhong Transportation Center
There are a cluster of 8~12-story framework buildings made of reinforcement concrete with total area of
more than 80,000 square meters. I worked on basic design and detail design as a structural engineer.
1982 to 1983 Second Heavy Machinery Group of China, Sichuan, China,
Junior Staff Engineer
In this period, I worked as structural engineer on the project of a factory workshop with steel structure
and the total area of 10,000 square meters.
Publications
(1) “Analysis of Torsion-Flexible Stability of T-Sectional Steel Strut”, Proceedings of the Forth International
Conference of Steel Structure Stability and Fatigue, Asia Session, Nov. 1987.
(2) “Overall Stability Analysis of a Multi-story Framework under Top Vertical Load”, Proceedings of the first
International Conference of Advances on Steel Structure, Hong Kong, Dec. 1996.
(3) “Overall Stability Analysis of a Multi-story Framework under Top Floor Uniformly Distributed Load”,
Proceedings of the Second International Conference of Advances on Steel Structure, Hong Kong, Dec. 1999.
(4) “Experimental Research on Earthquake Resistant Behavior of Steel Tubular Column Filled with High
Performance Concrete”, Proceedings of the First International Conference on Steel Composite Structures, Pusan,
Korea, Jun. 2001.
(5) “Experimental Research on Fatigue Behavior of Concrete Pavement Reinforcement by Cold Deformed Steel
Bar”, Journal of Southeast University, Vol.2, 2003.
(6) “Research on Fatigue Behavior of Concrete Pavement Reinforcement by Cold Deformed Steel Bar”, Journal of
Highway of China, Vol.1 2005.
Patents
(1) A New Kind of Floating LNG Receiving Terminal: 2010
Patent No.: 201010549940.8, Petition Place: P. R. China,
(2) A New Kind of LNG Hubspot: 2011
Patent No.: In petition, Petition Place: P. R. China
3/3