Professional Summary

Provide leadership and management oversight in planning maintenance and

preventive maintenance activities that have resulted in improved and more

efficient plant operations. Possess twenty-five years experience in design,

maintenance and repair of electrical/electronic and mechanical devices.

Experience planning, assembling work packages, and material procurement to

perform a wide variety of mechanical and electrical maintenance. Education

and experience has provided an emphasis on teamwork and high job

performance. Instructed blueprint reading and basic electricity at Southern

State Community College. Proficient in the use of Primavera P3/P3e,

Windows, Synergen Series CMMS ver 2.1, Microsoft Office, Excel, Word and

WordPerfect 6.1. Possessed an "L" security level clearance.

Professional Experience

Starcon

Scheduler November 2010 - January

2011

Responsibilities include the development and execution of a schedule using

Primavera 6.7 at the Bayer Crop Science site for a turnaround in the month

of January.

Babcock & Wilcox Construction Company Inc.

October 2005 - May 2010

Scheduler

Responsibilities include the development and execution of various project

plans for many different proposals, SCR's, FGD's and different outages

using Primavera 3.2, 5 or 6.2.

Locations Worked: Shipping Port, PA - HRH Replacement Outage - March

2010 to May 2010

Barberton, OH - Multiple Proposals (S/G and Main

Condenser replacement)

- March 2009 to Jan 2010

Limestone, TX - Outage - Jan 2009 to March 2009

AMOS, Charleston WV - Multiple Outages - April 2008

to Jan 2009

AMOS, Charleston WV - FGD - Jan 2007 to April 2008

MITCHELL, New Martinsville WV - Multiple Outages -

Oct 2005 to Jan 2007

MITCHELL, New Martinsville WV - FGD - Oct 2005 to

Jan 2007

Ken-Bar Tool & Engineering (Muncie, Indiana) September 7, 2004

- 30 September 2005

Machine Controls Engineer/Technician

Design, development and draw using AutoCAD 2000 the electrical and

pneumatic details for test fixtures used by a variety of automotive plants

to verify that their parts meet tolerances. Developed material lists (BOM)

as well as research and design new installations. Develop Allen Bradley

PLC Programming or ladder logic programming for processors that are

installed.

Sun Technical Services, Inc. - American Electric Power (Clinch River)

February 2, 2004 - May 19, 2004

Scheduler

Development/execution of a detailed project plan for an outage at the

Clinch River Power Plant. Performed weekly update through interaction with

project manager and superintendents. Developed weekly performance reports,

performed outage scheduling, scheduling support, inspection scheduling, and

critical path analysis.

Babcock & Wilcox Construction Company Inc. (Zimmer) April

22, 2002 - February 2, 2004

Scheduler

Responsibilities include development/execution of a detailed project plan.

Played a key role in development of a

consistent WBS and cost coding system. Develop resource and cost loaded

schedule for installation of 1300 mw coal fired power plant SCR. Provide

weekly schedule updates, lead weekly project controls meetings, provide

weekly schedule reviews and earned value analysis. Created and maintained

B & W document controls system and maintained B & W SCR engineering drawing

library.

United States Enrichment Corporation

1996 - 2002

(Formerly Lockheed Martin Utility Services, Inc.) A global energy company

with customers in 14 countries, 4,500 employees, headquartered in Bethesda,

Maryland.

Front Line Manager

Develop work packages for the installation of electrical heat in the three

process buildings as well as supervise approximately 25 electricians for

this project.

. Supervise hourly personnel and train employees on Company policies.

. Maintain well-defined safety, security and health programs.

. Establish and maintain effective communications and solicit input and

involvement in the work place.

. Utilize the Work Authorization and Control Program to limit maintenance

costs.

. Schedule and plan project maintenance work to minimize delays and

materials and properly utilize manpower.

. Establish and maintain good relations between the Company and employees

while developing and maintaining leadership qualities.

Senior Maintenance Planning Specialist

(Achieved this position in less time than predecessors.) Develop work

packages for a wide range of electrical, instrument and some mechanical

needs. The development includes walking jobs down, establishing permits,

procuring needed parts, researching drawings, and collaborating with

various engineers. Closely adhering to NRC requirements, build quality work

packages that allow tasks to be performed without compromising any

safeguards.

. Maintained minimal backlog of work orders within database by checking and

verifying status of work activity. Developed work packages in a timely

manner for priority work.

. Negotiated with outside vendors to acquire best price for materials.

Procured only top quality equipment.

. Served as liaison between building custodians, engineers, and foremen and

crafts people.

. Achieved downtime reduction by coordinating manpower, material and other

relevant resources.

. Researched obsolete equipment and procure suitable replacement if

necessary

. Develop work orders

Military Service

United States Navy

1975 - 1981

Interior Communications Second Class Petty Officer - Honorable Discharge

. Supervised and managed the Interior Communications personnel on board the

U.S.S. Mississippi (CGN-40).

. Awarded the Good Conduct Award and the Navy Achievement Award.

Education

Southern State Community College - Studied Electronics/Computers

Catalyst Incorporated - Introduction to Primavera Project Planner 3.0

Catalyst Incorporated - Primavera 6 e/c for Construction

CBA - Primavera 6.x Advanced Courses