Post Job Free
Sign in

Project Manager Engineer

Location:
Union, KY, 41091
Posted:
March 06, 2011

Contact this candidate

Resume:

CHERYL A BARAN

**** ********** *****

Union, Kentucky 41091

859-***-****

abhrs9@r.postjobfree.com

PROFESSIONAL SUMMARY

Proven chemist and engineer with expertise in project management, quality,

process improvement and lean manufacturing. Leadership skills initiating

team activities, training programs, warranty investigation, development of

tracking method for key performance indicators, master schedule development

and implementation. Utilized the following quality tools: 8D process, poke-

yokes, statistics, FIFO, kaizen activity, 5 Whys, DOE, Is-Is Not, Six Sigma

(Green Belt certified).

PROFESSIONAL EXPERIENCE

Toyota Motor Engineering & Manufacturing North America

2004 - Current

Warranty Department Specialist

. Project manager for the supplier warranty program for North America

. Implemented kaizen activities for IS support systems that improved

warranty processing by 32%

. Managed training program for Warranty Dept including material

development and delivery

. Project manager for 'no trouble found ' warranty part investigation

resulting in a 45% improvement in actual problem

identification

. Manage daily tasks and priority for 4 IS and administrative contractors

. Recovered ~$32 million/year in supplier warranty by assigning

responsibility to suppliers for defective product

Quality Assurance Specialist

. Managed the plant Customer Satisfaction Activity; created and facilitated

teams across various plant shops to identify, implement and verify

process improvements

. Collaborate with departments to identify design and manufacturing areas

for improvement in future models

. Reduced plant cost for vehicle buy-backs by $165K in 1 year by

identifying dealer mis-diagnosis issues

. Developed tracking methodology for all models and key performance

indicators

. Established a reporting program for warranty cost and trend analysis

that was used by senior level management

The Ford Motor Company

2000 - 2004

Quality Engineer

. Managed the layout and construction of the Metallurgical Laboratory

. Identified, spec, obtain bids and order all laboratory equipment and

supplies; remained under budget by $45K

. Coordinated process equipment testing during pre-launch; reduced manpower

requirements by 40/hrs/week

. Established environmental policies and procedures according to ISO14001,

OSHA and EPA guidelines

. Developed and implemented test procedures, forms and policies used for

machining and assembly areas

8 D Coordinator (Promotion),

. Lead engineer for all Jaguar, Mazda and Ford assembly lines regarding

supplier related issues.

. Engaged suppliers in problem- root cause investigation for defective

production parts.

. Managed the verification and recurrence prevention for process

improvement activities

. Coordinated Green Belt and Six Sigma supplier related projects due to

defective product received.

Manufacturing Test Engineer

. Auditor for ISO 9000 and key participant in Powertrain Audits.

. Investigated and developed procedures to meet current EPA and OSHA

regulations.

. Utilized FTIR, fuel dilution, SEM (scanning electron microscope), and

Spectro Elemental Analysis equipment.

. Collaborate directly with CDC, Center for Disease Control, in identifying

bacteria (sources) within the plant.

. Developed a central database (Web based) for viewing (machining) coolant

and washer system properties.

Page 2 Cheryl Baran - resume

Honda of America Mfg., Marysville, Ohio 1997-

2000

Engineering Coordinator (Promotion)

. Managed the New Model Development for paint trials, tracking production

issues, implementing countermeasure etc

. Project Manager for the design, layout, selection and installation of

paint application equipment

. Implemented New Model changeover during regular daily production

. Reduced cost of masking materials 30% annually by changing materials

Engineering Staff

. Managed the performance of bumper paint using trend analysis

. Developed a program for tracking paint color and appearance using

statistical analysis

. Established environmentally and efficient method for evaluating defects

in TPO (plastic); cost savings $140K annually

. Managed pretreatment personnel (Plastics Dept.) in the adherence to ISO

9000 and ISO 14000 standards

The Sherwin Williams Company

1991-1997

Project Coordinator (Promotion),

. Performed cost analysis and feasibility studies involving plant

equipment and manpower requirements

. Prevented major capital expenditure of $400K by identifying inadequate

plant procedures

. Managed major project resulting in a reduction of 53% to 72% in

manufacturing cost

Chemist, Quality & Process Improvement Dept.

. Internal auditor for ISO 9000 and guide for registrar

. Author of plant Quality Assurance Guidelines

. Supervised and managed the training for 2 technicians

. Performed statistical analysis and provided recommendations for

process improvements in paint post additions

.

Additional experience available upon request

EDUCATION

Cleveland State University, Cleveland, Ohio

M. S. in Industrial Engineering, GPA 3.60

B. S. in Chemistry, GPA 2.85

Six Sigma Green Belt Certified, Ford Motor

Company

PROFESSIONAL AFFILIATIONS

Institute of Industrial Engineers American Society of

Quality American Chemical Society

ADDITIONAL COURSEWORK

Visio XP Advanced, Computer Training Solutions

Access Intermediate Part 2: Creating Reports, Computer Training Solutions

AutoCad Level 1, Key Training

Virtual Factory Training Program

OHSIM Incident Investigation Module Training, Ford Motor Company



Contact this candidate