PROFILE
Engineer with * years experience, mainly in tunnel construction projects. I have extensive
experience in manage construction projects. I have worked on major construction projects:
Tunnel 42 Kms. for the subway in Barcelona, Tunnel for water supply project to the city of
Barcelona, Tunnel for a High Speed Train project from Madrid to Valencia, Tunnel with Drill
and Blast for a Highway in Barcelona. Great leadership skills and experience in
management and organization of work teams. Experience in planning, logistics, in treatment
with suppliers and clients. High knowledge of geology and material resistance. Experience in
hydraulics, pneumatics, ventilation systems, pumping systems, mortar and concrete injection
systems, mechanical and electrical installations and in preventive and corrective
maintenance.
Tel: 003**********
*******************@*******.***
NAME:
Jose Carlos. Sanchez.
28/02/1977
CITY: Barcelona. Spain.
DATE OF BIRTH: 28/02/1977
WORK EXPERIENCE
04/08- 09/10. COMPANY: OHL. Senior Engineer.
- TUNNEL LINE 9. Tunnel for the SUBWAY in Barcelona (Spain).
Tunnel Ø=10,8Kms. L=42Kms. TBM EPB. Manufacturer: NFM.
- TUNNEL TRINITAT. Water supply project to the city of Barcelona (Spain).
Tunnel Ø=6m L=6Kms. TBM Double Shield. Manufacturer: HERRENKNECHT
- Testing the TBM in the manufacturer factory.
- Coordination of transportation of the TBM from Germany to Spain.
- Assembly, execution of the tunnel of 6Kms in 10 months, and TBM disassembly.
- Conveyor belt system installation, hydraulic installations, ventilation systems,
elevators installations, pipes, pneumatic, electric and mechanical installations.
- Maintenance preventive and corrective of the TBM, trains, conveyor belt and all
the installations.
- Store management.
06/05- 04/08 COMPANY: FCC.
- TUNNEL SIETE AGUAS – BUÑOL. HIGH-SPEED TRAIN Madrid-Valencia (Spain).
Project Engineer. Project for the tunnel construction. Based on data
provided by the geologists and in coordination with engineers from the
manufacturer of the TBM is determined by the method of construction of
the tunnel and the type of TBM to be used. The project and cost studies for
the purchase of the TBM. Manufacturer: HERRENKNECHT
- HIGHWAY Barcelona-Olot (Spain). Construction of tunnel with Drill and Blast.
Production department.
- TUNNEL LINE 9. Tunnel for the SUBWAY in Barcelona (Spain). Shift Tunnelling Engineer.
L=8Kms.
05/03- 06/05 COMPANY: GROUP BOUYGUES.
Site manager in several building constructions for several public agencies:
- Historical Archive.
- Primary school education center.
- 24 industrial buildings.
06/02- 05/03 DELPHI AUTOMOTIVE SYSTEMS.
- DEPT. LOGISTICS (Sant Cugat del Valles). Logistics and distribution of automotive
components. Pay on use systems. Warehouse Management.
- DEPT. PRODUCTION (Cádiz). Manufacture of automotive
components. Implementation of the project to increase production of constant
velocity joints for automobiles.
EDUCATION Present: Doing a doctorate in civil engineering. University UPC of Barcelona
(Spain).
- 2000-2002 Degree in engineering. University of Sevilla (Spain).
- 1999-2000 Final-year project in Pisa University (Italy).
- 1996-1999 Technician mechanical engineering. University of Cadiz (Spain).
LANGUAGES - English: High technical level due to constant work with staff from the
companies of TBMs
Advanced course in “Simi-Valley Adult School”, California. Summer 2001.
Course during 2 months in London. Summer 2000.
- Italian: High level. Final-year project in Pisa University. 10 months.
- Spanish: Mother tongue.
COMPUTER - Microsoft Project, AUTOCAD, Office.
OTHERS - Several courses in Health, Safety, Quality and Environment.
- Course of development,design & production of TBMs in HERRENKNECHT
factory.Schwanau, Germany.
- Course of managements of works teams.
- Driving license and Travel availability.