Post Job Free
Sign in

Engineer Project

Location:
8005
Posted:
March 10, 2011

Contact this candidate

Resume:

PROFILE

Engineer with * years experience, mainly in tunnel construction projects. I have extensive

experience in manage construction projects. I have worked on major construction projects:

Tunnel 42 Kms. for the subway in Barcelona, Tunnel for water supply project to the city of

Barcelona, Tunnel for a High Speed Train project from Madrid to Valencia, Tunnel with Drill

and Blast for a Highway in Barcelona. Great leadership skills and experience in

management and organization of work teams. Experience in planning, logistics, in treatment

with suppliers and clients. High knowledge of geology and material resistance. Experience in

hydraulics, pneumatics, ventilation systems, pumping systems, mortar and concrete injection

systems, mechanical and electrical installations and in preventive and corrective

maintenance.

Tel: 003**********

*******************@*******.***

NAME:

Jose Carlos. Sanchez.

28/02/1977

CITY: Barcelona. Spain.

DATE OF BIRTH: 28/02/1977

WORK EXPERIENCE

04/08- 09/10. COMPANY: OHL. Senior Engineer.

- TUNNEL LINE 9. Tunnel for the SUBWAY in Barcelona (Spain).

Tunnel Ø=10,8Kms. L=42Kms. TBM EPB. Manufacturer: NFM.

- TUNNEL TRINITAT. Water supply project to the city of Barcelona (Spain).

Tunnel Ø=6m L=6Kms. TBM Double Shield. Manufacturer: HERRENKNECHT

- Testing the TBM in the manufacturer factory.

- Coordination of transportation of the TBM from Germany to Spain.

- Assembly, execution of the tunnel of 6Kms in 10 months, and TBM disassembly.

- Conveyor belt system installation, hydraulic installations, ventilation systems,

elevators installations, pipes, pneumatic, electric and mechanical installations.

- Maintenance preventive and corrective of the TBM, trains, conveyor belt and all

the installations.

- Store management.

06/05- 04/08 COMPANY: FCC.

- TUNNEL SIETE AGUAS – BUÑOL. HIGH-SPEED TRAIN Madrid-Valencia (Spain).

Project Engineer. Project for the tunnel construction. Based on data

provided by the geologists and in coordination with engineers from the

manufacturer of the TBM is determined by the method of construction of

the tunnel and the type of TBM to be used. The project and cost studies for

the purchase of the TBM. Manufacturer: HERRENKNECHT

- HIGHWAY Barcelona-Olot (Spain). Construction of tunnel with Drill and Blast.

Production department.

- TUNNEL LINE 9. Tunnel for the SUBWAY in Barcelona (Spain). Shift Tunnelling Engineer.

L=8Kms.

05/03- 06/05 COMPANY: GROUP BOUYGUES.

Site manager in several building constructions for several public agencies:

- Historical Archive.

- Primary school education center.

- 24 industrial buildings.

06/02- 05/03 DELPHI AUTOMOTIVE SYSTEMS.

- DEPT. LOGISTICS (Sant Cugat del Valles). Logistics and distribution of automotive

components. Pay on use systems. Warehouse Management.

- DEPT. PRODUCTION (Cádiz). Manufacture of automotive

components. Implementation of the project to increase production of constant

velocity joints for automobiles.

EDUCATION Present: Doing a doctorate in civil engineering. University UPC of Barcelona

(Spain).

- 2000-2002 Degree in engineering. University of Sevilla (Spain).

- 1999-2000 Final-year project in Pisa University (Italy).

- 1996-1999 Technician mechanical engineering. University of Cadiz (Spain).

LANGUAGES - English: High technical level due to constant work with staff from the

companies of TBMs

Advanced course in “Simi-Valley Adult School”, California. Summer 2001.

Course during 2 months in London. Summer 2000.

- Italian: High level. Final-year project in Pisa University. 10 months.

- Spanish: Mother tongue.

COMPUTER - Microsoft Project, AUTOCAD, Office.

OTHERS - Several courses in Health, Safety, Quality and Environment.

- Course of development,design & production of TBMs in HERRENKNECHT

factory.Schwanau, Germany.

- Course of managements of works teams.

- Driving license and Travel availability.



Contact this candidate