Post Job Free
Sign in

Electrical Engineer Project

Location:
Missouri City, TX, 77489
Posted:
March 17, 2011

Contact this candidate

Resume:

Electrical Engineer/ Junior Construction Superintendent

Electrical Engineer with 5-years of experience overseeing, installing,

integrating, and inspecting low/ medium voltage signals, communication,

security, and highway lighting systems. Experience also includes the

integration of fiber and radio communications systems. Previous involvement

has been with public transportation, corporate, and port entities in

numerous states.

Key Skills

. Construction of Signal and Communication Systems, Highway Lighting and

Infrastructure, and Installation of Security Systems

. Quality Assurance, OSHA Compliance, and Environmental Compliance

. Quantity Tracking, Time Card Coding, and Material Procurement

. Change Orders, RFI, and Submittal Management

. Subcontractor/ Crew Supervision

Employer Summary

Mass electric construction (Dallas, TX) - Field Engineer/ Jr. Construction

Superintendent, (04/08 to 11/10)

Oversaw various construction activities for the Seattle Light Rail, Phoenix

Light Rail, and the Maryland Inter County Connector Contract B Highway

projects.

Adesta llc (Houston, TX) - Security Technician I, (2/06 to 2/08)

Responsible for the installation and integration of high-end intrusion

detection, access control, CCTV, security lighting and physical security

systems (fencing, gates doors, roads, etc.) for the Corpus Christi Port

Authority, Victoria Port Authority, Beaumont Port Authority, Port of Mobile

Coal Terminal, and A.E.P in Corpus Christi.

X-pert communications/time warner cable (Houston, TX) - Cable Technician,

(1/06 to 2/06)

Contracted to install and service cable, internet, and digital phone

hardware for Time Warner Cable customers in the Greater Houston area and

beyond.

Project Highlights

Maryland Inter County Connector Contract B (Highway Lighting and Communications

Portion) (01/10 to 11/10)

Maintained project controls to be in compliance with all quality and

environmental regulations under the ICC-B contract. Procured material

required for the project. Wrote RFIs, correspondence letters, created

submittals and maintained all logs. Created and revised construction work

plans for subcontractor activities. Updated drawing sets for as-builts

using Adobe Photoshop and issued updated copies to the proper parties.

Assisted the Sr. Superintendent with overseeing subcontractor work crews

and assisted in facilitating scheduling meetings. Also coded time cards and

tracked all activities.

Valley Metro Light Rail Project- Phoenix, AZ (03/09 to 12/09)

Assisted in the close out phase of the project. Finalized the submission of

all submittals and extra equipment that was owed to the customer. Oversaw

the troubleshooting and repair of all punch list items. Also assisted the

Sr. OCS Superintendent with managing the night crew. Main contributions

were coordinating power downs for substations and setting up traffic

control. Also maintained all project vehicles and was environmental

coordinator.

Sound Transit Authority Light Rail Project- Seattle, WA (03/08 to 02/09)

Created work plans and one line drawings using AutoCad to guide the

installation of all devices and cabling for several outside light rail

stations. Devices involved with activities were control cabinets, PA

speakers, noise monitors, and closed-circuit cameras. etc. Also created

work plans and one-line drawings using AutoCAD for the microwave radio

systems for the Seattle downtown and Beacon Hill tunnels. Maintained and

tracked all material received from prime contractor and dispersed to work

crews for field installation. Assisted the Jr. Superintendent with

overseeing work crews by ensuring they were in compliance with all safety

regulations set by OSHA/MEC/Sound Transit Light Rail Authority. Coded time

cards and tracked all field installations.

Beaumont Port Authority- Beaumont, TX (11/07 to 02/08)

Installed and retrofitted a new Pelco camera system on existing camera

poles and installed Verint wireless system in storage hangers for cameras

not on the fiber network. Built all control cabinets, terminated and

labeled all communication cabling, and terminated all electrical service

cables. Also installed an AMAG access control system in the Port security

entrance building.

Mobile Port Authority (Coal Terminal)- Mobile, AL (04/07 to 10/07)

Installed all CCTV poles, Pelco cameras, security lighting, rigid conduits,

PVC inner duct, 24SMFO fiber, and electrical cabling. Built all control

cabinets, terminated and labeled all communication cabling, and terminated

all electrical service cables. Built head-end room that consisted of

communication racks, HVAC, Corning fiber racks, IFS transceivers, Pelco

DVRs, UPSs, video stabilizers, and video analytic blades.

AEP Headquarters- Corpus Christi, TX (02/07 to 03/07)

Oversaw a three-man crew to convert AEP's CCTV system from a black and

white to a color system. Installed additional cameras in the elevator carts

and repaired the existing cameras.

Victoria Port Authority- Victoria, TX (12/06 to 01/07)

Assisted the Sr. Technician with reconstructing the Ports gate access

control system and brought them up to standard with NEC code. System

consisted of to two access gates, two keypad kiosks, and two gate

controllers and four cameras.

Corpus Christi Port Authority- Corpus Christi, TX (02/06 to 11/06)

Installed AMAG security systems in CCPA security buildings. Built field

control cabinets, terminated and labeled all communication cabling, and

terminated all electrical service cables. Installed Cohu and Flir cameras.

Assisted with all integration of all camera video analytics.

Education & Affiliations

Hampton university (Hampton, VA) - BS in Electrical Engineering, 2004

Hampton University Leadership Fellow 2000- 2002

Hampton University NASA Aurora Research Fellow, Summer 2001

Harris County Precinct One Summer Intern, Summer 2002

UNC SPGRE Research Fellow, Summer 2003

National Society of Black Engineers

Institute of Electrical and Electronic Engineers

Certifications

2008 Microsoft Office Suite, AutoCAD, Adobe Photoshop

OSHA Hazardous Waste Operations & Emergency Response

Construction Safety, Confined Space Entry, and First Aid/CPR



Contact this candidate