Randy Dickensheets
*** ***** ***** **, *******, MI 49424
Phone: 616-***-****
Email: ***********@*****.***
Objective
Provide 20 years of various technical knowledge of plastic
assemblies/processes/tooling and Lighting to a company with profitability
at premium quality with professional urgency
Summary
. Extensive engineering experience across a wide variety of projects in the
automotive industry with the last decade spent working as a contractor.
. Strong communication and documentation skills, exceptional work
ethic/dedication.
. Solid leadership skills whether at the managerial level or "down in the
trenches".
. Assigned critical projects in launch mode or behind schedule utilizing
skills for a successful outcome.
Work Experience
Sr. Contract Engineer: Launch/Process/Product/Project/Tooling Engineering
8/2008 to present
GM Advance Vehicle Development Group - Senior Design Engineer
. Analyze foot space of GM product line vs. market.
. Benchmark Rear camera vision capabilities for 2014 NIHTSA legal
mandatory proposal ($75-250per veh.)
. Clinic Participant for Vehicle Ingress/Egress, headroom, leg-room, for
95th percentile
CDL Truck driver positions-(Haz-Mat, All-"N" endorsements-doubles/triples,
tankers, FAST pass)
Ford Motor Co. - RT Process Engineer (Sigma tech.-contract)
Analyze all materials, parts & processes (injection-molding, stampings,
finishes, assemblies etc.) to optimize cost towards entire vehicle. (EDGE,
Verb/Fiesta, MKX, Truck
. Lead Round-table of Program Mgt., Finance, Engineering & Purchasing.
Engage suppliers for alternative and more efficient solutions and cost
reduction.
West Mich. CDL School - student licensed for CDL driving.
11/07 Graduated
Visteon Corporation/Ford-ACH. Exteriors- Lighting Group
CORE Group-Product Engineer (CAE-tech-Contract)
11/05 - 08/07
Provide guidance/release to PD Lighting of Standard Parts Hardware; Bulbs-
halogen, signal etc. sockets adjusters, boots, fasteners, plastics, and
wire-harnesses.
. Best design practices and new technologies on New
Programs(Forward/Rear/Turn Lamps, LED & CHMSL's)
. Release improvements to existing GM, Nissan, Ford, and Volkswagen lamps.
. Resourced items to China, Honduras & Mexico manufacturing sources.
. Troubleshot materials processes / products, tool changes, root cause
problems at Pre-launching of lamps, including Guide Corp. takeover GM
lamps & components. Nissan Truck/SUV forward lamps
. Facilitate Test Failures & Action weekly mtg.; results from Vibration,
Photometry, water leak, corrosion, and warranty lamps. Reduction in
scrap, increased productivity,
. Implement / convert ELV compliant finishes, Progressed Std. Part Database
work plan APVPR, DFMEA, PFEMA, DOE and 8-D's, GM 3660, WERS, Vis Mock-up.
DCX Jeep Truck, Detroit, MI (DGE-Contract)
1999-2007
Sr. Product Engineer -Launched 2002 Liberty overhead systems headliner,
visors, lighting, compass consoles, new side-airbags
Introduced new plastic clam-shell visor & corporate-wide- lighting/sunroof
switch.
. Revised designs for desired launch condition. CN and MCM cost saving
systems.
DCX Interior Trim Engineer
. For Liberty, Cherokee and Wrangler, C-pillar rearward, Quarters, Console,
Header and Tailgate garnish, problem-solved, PTR, CN's, PPAP, etc.
. Short term & non- automotive, Heavy Truck Interiors- Injection molding &
RIM
Wheel 2 Wheel Specialty Vehicles, Madison Heights, MI
Sr. Product Design/Project Eng
Provides Hi-performance, custom & prototype vehicles to GM and per
celebrity request
. GM Silverado SS - front/rear fascia and side-cladding developed designs
for tooling, including attachment method & assembly. SS- Truck of the
Year
. Project support of-Customized -Corvette-Jay Leno, GMC Truck-Greg Norman,
1957 Chevy Bel-Aire
Magna SS/General Motors Truck, Rochester Hills, MI / Silao, Mexico
Tier 0.5- Launch responsible of GMT805 2002 Avalanche - Truck of the Year
Sr. Product/ Design Release Engineer (DRE) - For new mid-gate system
"1st in the Industry", completed styling/design(EWO's-$5mil). Compression
molded-Composite material and Mfg. Equipment.
. Midgate(pok-yo) for mfg. launch in Mexico. mock-up, production tools and
installation method
Trim (IR) Incident Resolution GM Co-Chair - Monitored 15 interior &
exterior trim engineers for product launch readiness, problem solving of
over 300 IR's (Pimrep)
. Member of GM Core Launch Team reporting to GM top management.
. Hard Tonneau Cover (DRE) - completion for launch mode, trouble shot latch
system.
. Hard Tonneau Cover Storage Bag (DRE) - Developed textile storage bag
system for hard covers, insured crash worthiness, durability,
usability/ergonomics.
A.L LIGHTING- Joint Bosch/Magneti Marelli Farm Hills, MI / Juarez, Mexico
Tooling/Process Engineer- member of new staff for Joint Venture transition
phase.
. Review 1st shot trials and Germany transferred molds at injection molding
tool trials.
. Problem-solving on Ford & GM lamps, 2-shot 2-color injection molding &
hard coating.
. Implemented (FIFO) Improve manufacturability / reduce scrap, isolated
root cause on rejects through 8-D's, DOE, BOB & WOW for suppliers in El
Paso, TX, Petoskey, MI., Windsor, Ont. for assembly in Juarez, Mexico.
General Motors Technical Center, Warren, MI.
03/97 - 09/99
Alpha Build Coordinator (Contract) (04/98 - 09/99) Vehicle Launch Ctr. Mid
Lux Build Site
. Oversee Alpha build site for interiors, Power train and HVAC systems. (35
protoype vehicles)
. Manage issues to insure timely part and modular system delivery
. coordinate problems at build site to resolution, maintain vehicle/buck
build
. schedule, engineering representative at daily site meetings, presenting
PPAA's issuing PIMREP's.
Total Vehicle Integration Engineer (Contract) (03/97- 09/99)
Assist TVIE manager, NAO, GMIO, SATURN staff (Chief Engineers, Directors)
for the Global Delta Program.
. Assigned to projects requiring motivating, resolving conflict,
clarifying direction and establish business cases.
. Facilitate & coordinate agenda for team meetings, implement usage of
engineering database Colored Visual-BOM Wall, Open Issues/Action List
. Initiated camouflage for 35 Alpha prototype cars. Guided vehicle
competitive tear downs through mock-up reviews and participated in VABA
(Vehicle Assessment and Benchmarking Activity) Toyota Corolla etc.
Intertec Systems - Inoac of Japan, Bardstown, KY
07/96 - 03/97
Supplier of RIM-Foam instrument panels, air-bag doors and door
panels/skins
Sr. Manufacturing Engineer / Interim Tooling, Process & Maintenance Mgr
. Increased productivity of 2500-ton injection-molding area 50%, reduce
scrap and downtime.
. Implemented plant emergency plan for 1997 Ohio River Flood, resulting
in no late production shipments.
. Volunteer for emergency 12-hr sandbag activity of community water
treatment plant.(Saved $2MIL PLANT)
. Scheduled JCI. "Cube initiative" program for plant-wide preventive
maintenance and efficiency
. Focus projects involved maintaining molding areas, foam, suryln-
adhesion, I/P water-jet cutting area, Slush mold scrap, Lean assembly
areas. Door Panel Heat-staking
. QS-9000 Internal Auditor - phase 1 towards certification
Lescoa Corp., Grand Rapids, MI
06/96 - 07/96 Supplier of consoles,
instrument panels and exterior lighting
Project/Interiors Launch Engineer (Contract)
. Launch GM Okla. plant on: 1997 GM P90 Olds-Cutlass & Chev-Malibu Center
consoles.
. Development of 2000 GMT 820 large truck luxury floor console Yukon,
Suburban.
Donnelly Corporation, Holland, MI
06/95 - 03/96
Sr. Project Engineer/Program Mgr - Nissan Business Unit
A supplier specializing in modular window systems, mirrors, and interior
systems
. Developed customer ideas through sketches, renderings, clay 1st-stage
prototype tools & coordination of all design, styling, optical,
mechanical & electrical requirements for Nissan Ford QV Overhead lamp
systems.
. Worked closely with customers to adapt a project strategy to reduce
timing for a successful MRD launch of D-lot build at Nissan Research and
Development.
. Developed part program from concept to clay, through all design
disciplines
. Included first laser scans technology successfully used at Donnelly.
. Trained team in Japanese methods
O'Sullivan/Automotive Ind., Dearborn, MI
03/94 - 05/95
Product Design Engineer - Co-located at Ford Design Studio / Pilot Plant -
Automotive Ind. purchased the former O'Sullivan Auto Div, a supplier of
gray and black box design of trim products.
Release engineer for 1997 Econoline Center console, Interior Trim
panels.
. Feasibility, structures, release, prototype, and production builds.
Time- managed launch activities for tooling, gauging, and manufacturing
equipment.
. Competent with Ford WERS network and VAVE.
. 1997 Expedition C, D-pillars Trim, rear quarters Trim, Process
Eng./Changes, tooling changes
Nihonplast Ltd. Of Japan, NAPM-Neaton Auto Products Manufacturing, Eaton,
OH 02/91 - 03/9
Airbag Steering Wheels, Interior/ Exterior plastic assemblies for Honda,
Nissan, Ford, MercedesBenz(Freightliner)
Product/QC Engineer - Direct contact with Honda--Responsible for daily
production quality including launch start-ups of 94 Accord, 95 Civic &
motorcycle plants reducing PPM. Accord-Civic Car of the Year
. Process monitoring included: RIM, injection molding (25-2,000 ton), blow-
mold, vacuum-form, plastic welding, printing, painting, metal stamping,
plating and welding.
. Implemented new computer/camera online inspection technology on SRS
airbag steering wheels.
. Introduced environmentally-friendly water-based materials for SRS
steering wheel, panel meter, reserve tank, inner fender,& glove box.
. Establish localized supplier part sourcing (Philippines, Malaysia).
. Utilized SPC, 5-P, DOE, Deming/Gant charts to solve problems with
critical dimensions and provide better fit/function.
. Trained joint Honda/Neaton Quality-Up teams to utilize associate
involvement.
. Supervise technicians. Analyzed gauging needs, tool changes, and
warranty analysis.
. Lean mfg. practices, FIFO, Pok-yo, Completed overseas assignments in
Japan & Canada
Elco/Thermoplastics, Mishawaka, IN
05/87 - 01/91
Plastics, fasteners, stampings and value added tight tolerance plastic
products. With In-house Injection Mold build Tool Shop capabilities.
Project Engineer-Accounts included Autecs /Bosch, Borg Warner, N-Denso,
Ford. all the GM
. Prototype development through production tooling, profitability
continuous improvement, FMEA's, DOE's, 8-Ds, Gp-3 ISIR submittal (SPC).
GM Granted Target and Merit of Excellence Awards. Monitored multiple
Tools build process. 1-16cavity injection molds.
Cost Estimating Engineer
. Responsible for pricing/quoting of Pc/price and tooling, technical
support/sales follow-up to international customer base. New Business
resulting in Multiple Plant Expansions.
. Products included tight tolerance gears, washers, insert moldings, and
fluid containers.
. Resins included ABS, acetals, PBT, PET, Polys, and nylons. Developed
material library
Layout Coordinator
. Quality inspection of production parts to various testing methods, as
well as prototype parts. Supplied ISR documentation to key customers.
Process/Production Supervisor- Team-managed supervision of production
processes- 1st, 2nd & 3rd shifts
. Operated/monitored & troubleshot various injection molding
equipment/Processes; thermo-laters, grinders, sprue-picking robots, bowl
feeders, turntables, sonic welding.
. Advised on Tool corrections. Tool trials evaluations, Lean Mfg Cell
implementation, FIFO concept
United Parcel Service,
Certified Air Driver
Elkhart, IN (88-91)-Evenings 2nd job, Muncie, IN (86-87), Grand Rapids, MI
(05)
. Promoted to on-call, overseas, next-day service, introducing services to
customers.
. Member of KORE (Keeping Our Reputation Excellent) Group
. Advanced skills in time management, customer relations, efficiency and
cleanliness
Education
. Ball State University, Muncie, Indiana
Industrial Technology/Educational endorsement - Emphasis: Plastic
Technology
Corporate-Sponsored Training:
. Lean Manufacturing, 5-C's, 5-Y's, Hot-runner Systems
. Total Quality Management, QS 9000, CMM Training
. Japanese Language, Spanish language, Korean greetings
. DOE for Plastics, DFMEA, PFMEA, ADVPR
. Honda Coaching & Counseling
. Computer Applications- Windows Training- Lotus Notes Usage, WORD, EXCEL,
Powerpoint,MS-Project
. Ford TOPS (Team-Oriented Problem Solving), 8-D's
. Visteon Lighting University,Vis Mock-up(CAD)
. Training in Teamcenter, UG, & Catia